| TO DO |
| CL |
Apr 27 (19) |
CODED LOCKBOX 2222 |
|
|
| CL |
May 6 (10) |
Pressure wash house |
Birds are still actively living in the back vent |
|
| KK |
May 7 (9) |
finish backyard grade and sod |
Monday |
|
| CL |
May 13 (3) |
Pieces of gutter needs to be removed from back patio |
|
|
|
| UPGRADES |
| --- |
|
| CRITICAL PATH |
|
|
|
C.O. to Lender (0) |
|
|
|
|
|
Schedule Closing (0) |
|
|
|
|
|
Review Settlement Statement (0) |
|
|
|
|
|
Jerry Signs Closing Documents (0) |
|
|
|
|
|
Request Trash Tote From POA Manager (0) |
|
|
|
Sat
|
May 16
|
Closing (1) |
Brittany @ West View Title |
|
|
|
|
Remove Coded Lockbox (0) |
|
|
|
| TO DO - COMPLETED OR DELETED |
|
|
I’m assuming this townhouse has a dormer window |
|
|
|
|
Spray dormer window black |
|
|
| CL |
Jan 28 (108) |
Lots of ceil8ng drywall cracks |
Patched. Need sanding 3/11 |
|
| CL |
Mar 21 (56) |
Appliances on site 3/21 |
|
|
| LR |
Apr 16 (30) |
Paint 2 |
Jesus. In process 4/18 |
|
| CL |
Apr 25 (21) |
CODED LOCKBOX 0202 |
|
|
| CL |
May 6 (10) |
Few paint touchups still needed |
Jesus |
|
| KK |
May 7 (9) |
install window screens |
Jill |
|
| KK |
May 7 (9) |
pressure wash front and back |
Jesus |
|
| CL |
Mar 25 (52) |
Garage door keypad is needed here as well |
|
|
| CL |
May 2 (14) |
Second coat of paint needed on front door |
Jesus |
|
| CL |
May 2 (14) |
Weatherstripping needed on garage door |
Jill |
|
| CL |
May 2 (14) |
Bit of weatherstripping is missing on the front door |
Jill |
|
| CL |
May 2 (14) |
Dark staining in a few areas on the steps leading to the main level of the house |
Jesus |
|
| CL |
May 6 (10) |
Hole needs patched around garage door trim |
Jesus |
|
| KK |
May 7 (9) |
scrape and sweep garage floor |
Jill |
|
| KK |
May 7 (9) |
finish garage door |
|
|
| CL |
Feb 18 (87) |
Side of kitchen granite needs to be calked in. Side near window |
Jesus |
|
| CL |
Mar 14 (63) |
There’s a relatively large gap between the cabinet and the wall on the cabinet closest to the kitchen window. Can something be done to patch? |
|
|
| LR |
Apr 16 (30) |
Caulk and paint gap between kitchen cabinet and wall by kitchen window |
Jesus |
|
| CL |
Apr 22 (24) |
There is a wire hanging out of the siding on the rear of the home |
Exterior electrical outlet needs to be installed |
|
| CL |
Apr 22 (24) |
Screw has scratched pantry door |
Tom. New door on site 4/26 |
|
| CL |
Apr 22 (24) |
Ceiling touch up still needed |
Jesus |
|
| CL |
Apr 29 (17) |
Low voltage Cable box cover |
Tom / Jill |
|
| CL |
Apr 15 (31) |
Bottom drain hall bath missing |
|
|
| CL |
Apr 22 (24) |
Blemish on master bedroom door. Trying to repair with knob and lock |
Jesus |
|
| CL |
Apr 22 (24) |
Attic cover needed |
Jesus |
|
| CL |
Apr 25 (21) |
One of the flaps on the back vent is missing |
Greg |
|
| CL |
Apr 29 (17) |
Another coat of black paint needed on steps |
Jesus |
|
| CL |
Apr 29 (17) |
Install primary bathroom shelves |
Joe / Paul |
|
| CL |
May 2 (14) |
Plastic piece for the washer and dryer needs to be installed here as well |
Jesus |
|
| KK |
May 7 (9) |
reclean upstairs hall bathtub |
Lynn or Jill |
|
|
| UPGRADES - COMPLETED |
| |
|
Expanded Driveway
|
|
| |
|
LVP in Upstairs Hallway and Bedrooms
|
|
| |
|
Painted Steps to Bedroom Level
|
|
| |
|
Eggshell Paint
|
|
| |
|
Amendment to increase price by $6,020
|
|
|
| CRITICAL PATH - COMPLETED |
| -- |
-- |
Ratified Contract? (0) 07.21.2025 |
|
|
| -- |
-- |
$2500 Deposit Received (0) 07.29.2025 |
|
|
| -- |
-- |
Association Packet Requested (0) 07.21.2025 |
|
|
| -- |
-- |
Association Packet Received (0) 07.29.2025 |
|
|
| -- |
-- |
Selections Meeting (0) 08.21.2025 |
|
|
| -- |
-- |
Selections Sheet Signed (0) 08.21.2025 |
|
|
| -- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 08.29.2025 |
|
|
| -- |
-- |
Deposit For Upgrades Received (0) 08.29.2025 |
|
|
| -- |
-- |
Building Permit (30) * 05.24.2025 |
|
|
| -- |
-- |
Order Roof & Floor Trusses (1) 09.25.2025 |
|
|
| -- |
-- |
Order Windows & Doors (0) 10.23.2025 |
|
|
| -- |
-- |
Stake Out Home (1) 05.29.2025 |
|
|
| -- |
-- |
Excavate (2) 05.29.2025 |
|
|
| -- |
-- |
Inspection (Footers) (1) 06.02.2025 |
|
|
| -- |
-- |
Inspection (Concrete Wall) (1) 07.31.2025 |
|
|
| -- |
-- |
Pour Footers (1) * 06.02.2025 |
|
|
| -- |
-- |
Set Forms (2) 06.05.2025 |
|
|
| -- |
-- |
Pour Foundation Walls (1) 07.31.2025 |
|
|
| -- |
-- |
Plumb Slab (2) 07.31.2025 |
|
|
| -- |
-- |
Inspection (Plumbing Under Slab) (1) 09.28.2025 |
|
|
| -- |
-- |
Inspection (Conduit Under Slab) (1) 09.28.2025 |
|
|
| -- |
-- |
Prepare Slab (1) 09.04.2025 |
|
|
| -- |
-- |
Inspection (Slab) (1) 09.28.2025 |
|
|
| -- |
-- |
Inspection (Drain Tile) (0) 09.28.2025 |
|
|
| -- |
-- |
Pour Slab (1) * 09.28.2025 |
|
|
| -- |
-- |
Settlement Agent Confirmed (0) 12.05.2025 |
|
|
| -- |
-- |
Framing I (9) 10.09.2025 |
|
|
| -- |
-- |
Order Steps (0) 10.23.2025 |
|
|
| -- |
-- |
Order Tubs / Showers (0) 11.12.2025 |
|
|
| -- |
-- |
Framing II (8) 10.31.2025 |
|
|
| -- |
-- |
Framing III (8) * 12.04.2025 |
|
|
| -- |
-- |
Verify Window & Roof Structure (0) 11.12.2025 |
|
|
| -- |
-- |
Install Stairs (0) * 11.19.2025 |
|
|
| -- |
-- |
Windows & Doors (0) * 11.12.2025 |
|
|
| -- |
-- |
House Number and Status in Window (0) 12.06.2025 |
|
|
| -- |
-- |
Roofing (0) * 11.19.2025 |
|
|
| -- |
-- |
Order Cabinets (0) 11.24.2025 |
|
|
| -- |
-- |
Order Appliances (0) 04.08.2026 |
|
|
| -- |
-- |
Deck (0) 01.04.2026 |
|
|
| -- |
-- |
Gutters (0) 04.09.2026 |
in process 4/8 |
|
| -- |
-- |
Driveway (0) * 04.05.2026 |
|
|
| -- |
-- |
Patio (0) 03.10.2026 |
|
|
| -- |
-- |
Privacy Divider / Fence (0) * 04.07.2026 |
|
|
| -- |
-- |
Sod / Seed / Landscaping (0) 04.22.2026 |
|
|
| -- |
-- |
HVAC Rough In (4) 11.12.2025 |
|
|
| -- |
-- |
Rough In Microwave Vent (0) 11.12.2025 |
|
|
| -- |
-- |
Plumbing Rough In (4) 11.28.2025 |
In process 11/19 |
|
| -- |
-- |
Electric Rough In (4) 12.03.2025 |
In process 11/28 |
|
| -- |
-- |
Inspection (Rough In HVAC) (1) 12.08.2025 |
|
|
| -- |
-- |
Inspection (Rough In Plumbing) (1) 12.08.2025 |
|
|
| -- |
-- |
Inspection (Rough In Electric) (1) 12.08.2025 |
|
|
| -- |
-- |
Inspection (Framing) (1) * 12.08.2025 |
|
|
| -- |
-- |
Inspection (Deck Piers) (0) 01.04.2026 |
|
|
| -- |
-- |
Exterior Vinyl (0) * 03.10.2026 |
|
|
| -- |
-- |
Exterior Stone (0) 03.10.2026 |
|
|
| -- |
-- |
Insulation (2) * 12.13.2025 |
|
|
| -- |
-- |
Inspection (Insulation) (1) 12.15.2025 |
|
|
| -- |
-- |
Inspection (Electric Service) (0) 01.12.2026 |
|
|
| -- |
-- |
Set Electric Meter (0) * 03.05.2026 |
|
|
| -- |
-- |
Inspection (Main Sewer Line) (0) 01.05.2026 |
|
|
| -- |
-- |
Inspection (Main Water Line) (0) 01.05.2026 |
|
|
| -- |
-- |
Order Interior Doors & Trim (0) 01.12.2026 |
|
|
| -- |
-- |
Drywall (Hang) (4) * 01.02.2026 |
In process 12/20 |
|
| -- |
-- |
Loan Approval (0) 01.10.2026 |
Cash |
|
| -- |
-- |
Deed Preparation (0) 01.10.2026 |
|
|
| -- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 01.14.2026 |
In process 1/7 |
|
| -- |
-- |
Paint 1 (1) 01.14.2026 |
|
|
| -- |
-- |
Garage Door (0) 03.18.2026 |
|
|
| -- |
-- |
House Numbers (0) 04.15.2026 |
|
|
| -- |
-- |
Mailbox (0) 04.02.2026 |
|
|
| -- |
-- |
Cabinet Installation (2) * 01.28.2026 |
In process 1/24 |
|
| -- |
-- |
Granite Installation (1) * 02.18.2026 |
|
|
| -- |
-- |
Interior Trim - Install (3) * 02.22.2026 |
In process 2/14 |
|
| -- |
-- |
Order Plumbing / Lighting Fixtures (0) 02.16.2026 |
|
|
| -- |
-- |
Interior Trim - Paint (1) 02.28.2026 |
Prepping to paint 2/25 |
|
| -- |
-- |
Luxury Vinyl Plank (3) * 03.25.2026 |
In process 3/21 |
|
| -- |
-- |
Luxury Vinyl Tile (0) 03.25.2026 |
In process 3/21 |
|
| -- |
-- |
Paint 2 (3) 04.22.2026 |
Jesus. In process 4/18 |
|
| -- |
-- |
Cover Floors (0) 04.22.2026 |
|
|
| -- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 03.23.2026 |
|
|
| -- |
-- |
Shoe Moulding (0) 04.05.2026 |
In process 3/25 |
|
| -- |
-- |
Shelving, Door Knobs, Fire Extinguisher (1) * 04.25.2026 |
In process 4/22. Finishing today. |
|
| -- |
-- |
Install Coded Lockbox (add extra keys) (0) 04.25.2026 |
|
|
| -- |
-- |
Pay Water / Sewer Taps (0) 03.31.2026 |
|
|
| -- |
-- |
Set Water Meter (1) * 04.02.2026 |
|
|
| -- |
-- |
Electric Trim Out (3) * 05.02.2026 |
In process 4/25. Done end of day 4/29 |
|
| -- |
-- |
Ceiling Fans (0) 04.29.2026 |
|
|
| -- |
-- |
HVAC Trim Out (1) * 05.02.2026 |
Thermostat is needed. In process 4/29 |
|
| -- |
-- |
Blower Door Test (1) 05.06.2026 |
Mon, May 4 |
|
| -- |
-- |
Plumbing Trim Out (2) * 04.15.2026 |
In process 5/4 |
|
| -- |
-- |
Install Appliances (0) * 04.22.2026 |
Partially installed 4/8 |
|
| -- |
-- |
Paint 3 (2) * 04.22.2026 |
|
|
| -- |
-- |
Carpet (2) 04.08.2026 |
|
|
| -- |
-- |
Appraiser Confirms Construction Completion (0) 04.04.2026 |
|
|
| -- |
-- |
Inspection (Final HVAC) (0) 05.06.2026 |
|
|
| -- |
-- |
Inspection (Final Plumbing) (0) 05.06.2026 |
|
|
| -- |
-- |
Inspection (Final Electric) (0) 05.06.2026 |
|
|
| -- |
-- |
Inspection (Final Building) (4) * 05.06.2026 |
Tue, May 5 |
|
| -- |
-- |
Pre Walk Through (0) 05.06.2026 |
|
|
| -- |
-- |
Stain Hardwood Stairs (1) * 05.02.2026 |
|
|
| -- |
-- |
Cleaning (1) 05.06.2026 |
|
|
| -- |
-- |
Certificate of Occupancy (1) * 05.09.2026 |
|
|
| -- |
-- |
Buyer Walk Through (1) * 05.06.2026 |
|
|
| -- |
-- |
Payment for Upgrades (0) 04.15.2026 |
|
|
| -- |
-- |
Keys to Settlement Agent (0) 05.04.2026 |
|
|