VILLAS - 501-102  ::  501 Roman Way #102
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
---
UPGRADES
---
CRITICAL PATH
---
TO DO - COMPLETED OR DELETED
This bathroom appears to be handicapped accessible as well.
CL Mar 19 (156) Need a different flooring in the laundry room/utility area Denny has stuff 4/30
CL Mar 21 (154) Missing a few pieces of cabinetry? Bathroom Only
CL Mar 21 (154) Appears that a few electrical outlets need to be moved? is any dryall patching necessary-or will all be covered up by cabinetry?
CL Mar 21 (154) Is the side piece of the bathroom vanity supposed to be a different color?
SR Mar 30 (145) ADA sink arriving Wed, Apr 1
CL May 2 (112) Install closet door
CL May 4 (110) hot water heaters are in place-are we still changing closet flooring? 5/2
CL May 6 (108) Newly installed closet door needs to be painted
CL May 31 (83) Fan cover missing primary bedroom Electrician. In process 7/1
CL Jun 3 (80) Some type of trim appears to be needed on the side of the ADA shower Kenny to cut and install trim
CL Jun 4 (79) Getting ADA dishwasher Tue, Jun 16
CL Jun 21 (62) Paint the trim installed at the shower Jesus
CL Jun 21 (62) Front door weatherstripping needed here Jill
CL Jun 29 (54) install screens Jill
CL Jul 8 (45) Touch up cabinet blemishes
UPGRADES - COMPLETED
---
CRITICAL PATH - COMPLETED
-- -- Ratified Contract? (0)  09.25.2025    
-- -- $2500 Deposit Received (0)  09.25.2025    
-- -- Association Packet Requested (0)  09.25.2025    
-- -- Association Packet Received (0)  09.25.2025    
-- -- Selections Meeting (0)  09.25.2025    
-- -- Selections Sheet Signed (0)  09.25.2025    
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  09.25.2025    
-- -- Deposit For Upgrades Received (0)  09.25.2025    
-- -- Building Permit (30) *   09.25.2025    
-- -- Order Roof & Floor Trusses (0)  09.25.2025    
-- -- Order Windows & Doors (0)  09.25.2025    
-- -- Stake Out Home (1)  09.25.2025    
-- -- Excavate (2)  09.25.2025    
-- -- Inspection (Footers) (1)  09.25.2025    
-- -- Pour Footers (1) *   09.25.2025    
-- -- Set Forms (2)  09.25.2025    
-- -- Inspection (Concrete Wall) (1)  09.25.2025    
-- -- Pour Foundation Walls (1)  09.25.2025    
-- -- Plumb Slab (2)  09.25.2025    
-- -- Inspection (Plumbing Under Slab) (1)  09.25.2025    
-- -- Inspection (Conduit Under Slab) (1)  09.25.2025    
-- -- Prepare Slab (1)  09.25.2025    
-- -- Inspection (Slab) (1)  09.25.2025    
-- -- Inspection (Drain Tile) (0)  09.25.2025    
-- -- Pour Slab (1) *   09.25.2025    
-- -- Settlement Agent Confirmed (0)  09.25.2025    
-- -- Framing I (9)  09.25.2025    
-- -- Order Steps (0)  09.25.2025    
-- -- Order Tubs / Showers (0)  09.25.2025    
-- -- Framing II (8)  09.25.2025    
-- -- Framing III (8) *   09.25.2025    
-- -- Verify Window & Roof Structure (0)  09.25.2025    
-- -- Install Stairs (0) *   10.02.2025    
-- -- Windows & Doors (0) *   10.27.2025    
-- -- House Number and Status in Window (0)  05.27.2026    
-- -- Roofing (0) *   09.25.2025    
-- -- Order Cabinets (0)  10.16.2025    
-- -- Order Appliances (0)  05.21.2026    
-- -- Deck (0)  10.27.2025    
-- -- Gutters (0)  03.23.2026    
-- -- Driveway (0) *   02.19.2026    
-- -- Patio (0)  05.14.2026    
-- -- Privacy Divider / Fence (0) *   09.25.2025    
-- -- Sod / Seed / Landscaping (0)  06.12.2026    
-- -- HVAC Rough In (4)  10.02.2025    
-- -- Plumbing Rough In (4)  10.09.2025    
-- -- Electric Rough In (4)  01.11.2026     in process 12/3- almost completed
-- -- Inspection (Rough In HVAC) (1)  01.22.2026    
-- -- Inspection (Rough In Plumbing) (1)  02.02.2026    
-- -- Inspection (Rough In Electric) (1)  01.22.2026    
-- -- Inspection (Framing) (1) *   02.19.2026    
-- -- Inspection (Deck Piers) (0)  01.22.2026    
-- -- Exterior Vinyl (0) *   02.02.2026    
-- -- Exterior Stone (0)  02.02.2026    
-- -- Insulation (2) *   02.19.2026    
-- -- Inspection (Insulation) (1)  02.19.2026    
-- -- Inspection (Electric Service) (0)  01.15.2026    
-- -- Set Electric Meter (0) *   04.06.2026    
-- -- Inspection (Main Sewer Line) (0)  06.11.2026    
-- -- Inspection (Main Water Line) (0)  04.14.2026    
-- -- Order Interior Doors & Trim (0)  03.30.2026    
-- -- Drywall (Hang) (4) *   03.05.2026    
-- -- Loan Approval (0)  09.25.2025    
-- -- Deed Preparation (0)  09.25.2025    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   03.16.2026     Done by Mon, Mar 16
-- -- Paint 1 (1)  03.16.2026     Tue, Mar 17
-- -- Garage Door (0)  09.25.2025    
-- -- House Numbers (0)  05.27.2026    
-- -- Mailbox (0)  06.04.2026    
-- -- Cabinet Installation (2) *   03.23.2026     Fri, Mar 20
-- -- Granite Installation (1) *   04.23.2026    
-- -- Interior Trim - Install (3) *   04.09.2026    
-- -- Order Plumbing / Lighting Fixtures (0)  04.09.2026    
-- -- Interior Trim - Paint (1)  04.16.2026    
-- -- Luxury Vinyl Plank (3) *   03.23.2026     Wed, Mar 18. In process 3/18
-- -- Luxury Vinyl Tile (0)  03.23.2026     Wed, Mar 18 In process 3/18
-- -- Paint 2 (3)  05.18.2026    
-- -- Cover Floors (0)  05.27.2026    
-- -- Deliver Plumbing / Lighting Fixtures (0)  05.07.2026    
-- -- Shoe Moulding (0)  05.06.2026    
-- -- Shelving, Door Knobs, Fire Extinguisher (1) *   05.21.2026     Needs bathroom accessories & front door lock
-- -- Install Coded Lockbox (add extra keys) (0)  06.04.2026    
-- -- Pay Water / Sewer Taps (0)  06.11.2026    
-- -- Set Water Meter (1) *   06.15.2026    
-- -- Electric Trim Out (3) *   06.04.2026     In process 5/27
-- -- Ceiling Fans (0)  06.04.2026    
-- -- HVAC Trim Out (1) *   05.14.2026     In process 5/13
-- -- Blower Door Test (1)  06.25.2026    
-- -- Plumbing Trim Out (2) *   05.04.2026     In process 4/26
-- -- Install Appliances (0) *   06.21.2026    
-- -- Paint 3 (2) *   06.13.2026    
-- -- Carpet (2)  05.18.2026    
-- -- Appraiser Confirms Construction Completion (0)  09.25.2025    
-- -- Inspection (Final HVAC) (0)  06.25.2026    
-- -- Inspection (Final Plumbing) (0)  06.25.2026    
-- -- Inspection (Final Electric) (0)  06.25.2026    
-- -- Inspection (Final Building) (4) *   07.15.2026    
-- -- Pre Walk Through (0)  06.25.2026    
-- -- Stain Hardwood Stairs (1) *   06.25.2026    
-- -- Cleaning (1)  07.13.2026    
-- -- Certificate of Occupancy (1) *   07.29.2026    
-- -- C.O. to Lender (0)  09.25.2025    
-- -- Schedule Closing (0)  09.25.2025    
-- -- Buyer Walk Through (1) *   09.25.2025    
-- -- Payment for Upgrades (0)  09.25.2025    
-- -- Keys to Settlement Agent (0)  06.25.2026    
-- -- Review Settlement Statement (0)  09.25.2025    
-- -- Jerry Signs Closing Documents (0)  09.25.2025    
-- -- Request Trash Tote From POA Manager (0)  06.25.2026    
-- -- Closing (1)  06.25.2026    
-- -- Remove Coded Lockbox (0)  06.25.2026