| TO DO |
| CL |
Mar 19 (6) |
Need a different flooring in the laundry room/utility area |
|
|
| CL |
Mar 21 (4) |
Missing a few pieces of cabinetry? |
|
|
| CL |
Mar 21 (4) |
Appears that a few electrical outlets need to be moved? |
is any dryall patching necessary-or will all be covered up by cabinetry? |
|
| CL |
Mar 21 (4) |
Is the side piece of the bathroom vanity supposed to be a different color? |
|
|
|
| UPGRADES |
| --- |
|
| CRITICAL PATH |
|
|
|
House Number and Status in Window (0) |
|
|
|
|
|
Order Appliances (0) |
|
|
|
|
|
Patio (0) |
|
|
|
|
|
Sod / Seed / Landscaping (0) |
|
|
|
|
|
Set Electric Meter (0) * |
|
|
|
|
|
Inspection (Main Sewer Line) (0) |
|
|
|
|
|
Inspection (Main Water Line) (0) |
|
|
|
|
|
Order Interior Doors & Trim (0) |
|
|
|
|
|
House Numbers (0) |
|
|
|
|
|
Mailbox (0) |
|
|
|
Wed
|
Mar 25
|
Granite Installation (1) * |
|
|
|
Thu
|
Mar 26
|
Interior Trim - Install (3) * |
|
|
|
|
|
Order Plumbing / Lighting Fixtures (0) |
|
|
|
Tue
|
Mar 31
|
Interior Trim - Paint (1) |
|
|
|
Wed
|
Apr 1
|
Paint 2 (3) |
|
|
|
|
|
Cover Floors (0) |
|
|
|
|
|
Deliver Plumbing / Lighting Fixtures (0) |
|
|
|
|
|
Shoe Moulding (0) |
|
|
|
Mon
|
Apr 6
|
Shelving, Door Knobs, Fire Extinguisher (1) * |
|
|
|
|
|
Install Coded Lockbox (add extra keys) (0) |
|
|
|
|
|
Pay Water / Sewer Taps (0) |
|
|
|
Tue
|
Apr 7
|
Set Water Meter (1) * |
|
|
|
Wed
|
Apr 8
|
Electric Trim Out (3) * |
|
|
|
|
|
Ceiling Fans (0) |
|
|
|
Mon
|
Apr 13
|
HVAC Trim Out (1) * |
|
|
|
Tue
|
Apr 14
|
Blower Door Test (1) |
|
|
|
Wed
|
Apr 15
|
Plumbing Trim Out (2) * |
|
|
|
|
|
Install Appliances (0) * |
|
|
|
Fri
|
Apr 17
|
Paint 3 (2) * |
|
|
|
Tue
|
Apr 21
|
Carpet (2) |
|
|
|
|
|
Inspection (Final HVAC) (0) |
|
|
|
|
|
Inspection (Final Plumbing) (0) |
|
|
|
|
|
Inspection (Final Electric) (0) |
|
|
|
Thu
|
Apr 23
|
Inspection (Final Building) (4) * |
|
|
|
|
|
Pre Walk Through (0) |
|
|
|
Wed
|
Apr 29
|
Stain Hardwood Stairs (1) * |
|
|
|
Thu
|
Apr 30
|
Cleaning (1) |
|
|
|
Fri
|
May 1
|
Certificate of Occupancy (1) * |
|
|
|
|
|
Keys to Settlement Agent (0) |
|
|
|
|
|
Request Trash Tote From POA Manager (0) |
|
|
|
Mon
|
May 4
|
Closing (1) |
|
|
|
|
|
Remove Coded Lockbox (0) |
|
|
|
| TO DO - COMPLETED OR DELETED |
|
|
This bathroom appears to be handicapped accessible as well. |
|
|
|
| UPGRADES - COMPLETED |
| --- |
|
| CRITICAL PATH - COMPLETED |
| -- |
-- |
Ratified Contract? (0) 09.25.2025 |
|
|
| -- |
-- |
$2500 Deposit Received (0) 09.25.2025 |
|
|
| -- |
-- |
Association Packet Requested (0) 09.25.2025 |
|
|
| -- |
-- |
Association Packet Received (0) 09.25.2025 |
|
|
| -- |
-- |
Selections Meeting (0) 09.25.2025 |
|
|
| -- |
-- |
Selections Sheet Signed (0) 09.25.2025 |
|
|
| -- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 09.25.2025 |
|
|
| -- |
-- |
Deposit For Upgrades Received (0) 09.25.2025 |
|
|
| -- |
-- |
Building Permit (30) * 09.25.2025 |
|
|
| -- |
-- |
Order Roof & Floor Trusses (1) 09.25.2025 |
|
|
| -- |
-- |
Order Windows & Doors (0) 09.25.2025 |
|
|
| -- |
-- |
Stake Out Home (1) 09.25.2025 |
|
|
| -- |
-- |
Excavate (2) 09.25.2025 |
|
|
| -- |
-- |
Inspection (Footers) (1) 09.25.2025 |
|
|
| -- |
-- |
Inspection (Concrete Wall) (1) 09.25.2025 |
|
|
| -- |
-- |
Pour Footers (1) * 09.25.2025 |
|
|
| -- |
-- |
Set Forms (2) 09.25.2025 |
|
|
| -- |
-- |
Pour Foundation Walls (1) 09.25.2025 |
|
|
| -- |
-- |
Plumb Slab (2) 09.25.2025 |
|
|
| -- |
-- |
Inspection (Plumbing Under Slab) (1) 09.25.2025 |
|
|
| -- |
-- |
Inspection (Conduit Under Slab) (1) 09.25.2025 |
|
|
| -- |
-- |
Prepare Slab (1) 09.25.2025 |
|
|
| -- |
-- |
Inspection (Slab) (1) 09.25.2025 |
|
|
| -- |
-- |
Inspection (Drain Tile) (0) 09.25.2025 |
|
|
| -- |
-- |
Pour Slab (1) * 09.25.2025 |
|
|
| -- |
-- |
Settlement Agent Confirmed (0) 09.25.2025 |
|
|
| -- |
-- |
Framing I (9) 09.25.2025 |
|
|
| -- |
-- |
Order Steps (0) 09.25.2025 |
|
|
| -- |
-- |
Order Tubs / Showers (0) 09.25.2025 |
|
|
| -- |
-- |
Framing II (8) 09.25.2025 |
|
|
| -- |
-- |
Framing III (8) * 09.25.2025 |
|
|
| -- |
-- |
Verify Window & Roof Structure (0) 09.25.2025 |
|
|
| -- |
-- |
Install Stairs (0) * 10.02.2025 |
|
|
| -- |
-- |
Windows & Doors (0) * 10.27.2025 |
|
|
| -- |
-- |
Roofing (0) * 09.25.2025 |
|
|
| -- |
-- |
Order Cabinets (0) 10.16.2025 |
|
|
| -- |
-- |
Deck (0) 10.27.2025 |
|
|
| -- |
-- |
Gutters (0) 03.23.2026 |
|
|
| -- |
-- |
Driveway (0) * 02.19.2026 |
|
|
| -- |
-- |
Privacy Divider / Fence (0) * 09.25.2025 |
|
|
| -- |
-- |
HVAC Rough In (4) 10.02.2025 |
|
|
| -- |
-- |
Rough In Microwave Vent (0) 10.09.2025 |
|
|
| -- |
-- |
Plumbing Rough In (4) 10.09.2025 |
|
|
| -- |
-- |
Electric Rough In (4) 01.11.2026 |
in process 12/3- almost completed |
|
| -- |
-- |
Inspection (Rough In HVAC) (1) 01.22.2026 |
|
|
| -- |
-- |
Inspection (Rough In Plumbing) (1) 02.02.2026 |
|
|
| -- |
-- |
Inspection (Rough In Electric) (1) 01.22.2026 |
|
|
| -- |
-- |
Inspection (Framing) (1) * 02.19.2026 |
|
|
| -- |
-- |
Inspection (Deck Piers) (0) 01.22.2026 |
|
|
| -- |
-- |
Exterior Vinyl (0) * 02.02.2026 |
|
|
| -- |
-- |
Exterior Stone (0) 02.02.2026 |
|
|
| -- |
-- |
Insulation (2) * 02.19.2026 |
|
|
| -- |
-- |
Inspection (Insulation) (1) 02.19.2026 |
|
|
| -- |
-- |
Inspection (Electric Service) (0) 01.15.2026 |
|
|
| -- |
-- |
Drywall (Hang) (4) * 03.05.2026 |
|
|
| -- |
-- |
Loan Approval (0) 09.25.2025 |
|
|
| -- |
-- |
Deed Preparation (0) 09.25.2025 |
|
|
| -- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 03.16.2026 |
Done by Mon, Mar 16 |
|
| -- |
-- |
Paint 1 (1) 03.16.2026 |
Tue, Mar 17 |
|
| -- |
-- |
Garage Door (0) 09.25.2025 |
|
|
| -- |
-- |
Cabinet Installation (2) * 03.23.2026 |
Fri, Mar 20 |
|
| -- |
-- |
Luxury Vinyl Plank (3) * 03.23.2026 |
Wed, Mar 18. In process 3/18 |
|
| -- |
-- |
Luxury Vinyl Tile (0) 03.23.2026 |
Wed, Mar 18 In process 3/18 |
|
| -- |
-- |
Appraiser Confirms Construction Completion (0) 09.25.2025 |
|
|
| -- |
-- |
C.O. to Lender (0) 09.25.2025 |
|
|
| -- |
-- |
Schedule Closing (0) 09.25.2025 |
|
|
| -- |
-- |
Buyer Walk Through (1) * 09.25.2025 |
|
|
| -- |
-- |
Payment for Upgrades (0) 09.25.2025 |
|
|
| -- |
-- |
Review Settlement Statement (0) 09.25.2025 |
|
|
| -- |
-- |
Jerry Signs Closing Documents (0) 09.25.2025 |
|
|