VILLAS - 501-102  ::  501 Roman Way #102
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS


Wednesday (Mar 25)    show all photos
TO DO
CL Mar 19 (6) Need a different flooring in the laundry room/utility area
CL Mar 21 (4) Missing a few pieces of cabinetry?
CL Mar 21 (4) Appears that a few electrical outlets need to be moved? is any dryall patching necessary-or will all be covered up by cabinetry?
CL Mar 21 (4) Is the side piece of the bathroom vanity supposed to be a different color?
UPGRADES
---
CRITICAL PATH
    House Number and Status in Window (0)      
    Order Appliances (0)      
    Patio (0)      
    Sod / Seed / Landscaping (0)      
    Set Electric Meter (0) *       
    Inspection (Main Sewer Line) (0)      
    Inspection (Main Water Line) (0)      
    Order Interior Doors & Trim (0)      
    House Numbers (0)      
    Mailbox (0)      
Wed    Mar 25      Granite Installation (1) *       
Thu    Mar 26      Interior Trim - Install (3) *       
    Order Plumbing / Lighting Fixtures (0)      
Tue    Mar 31      Interior Trim - Paint (1)      
Wed    Apr 1      Paint 2 (3)      
    Cover Floors (0)      
    Deliver Plumbing / Lighting Fixtures (0)      
    Shoe Moulding (0)      
Mon    Apr 6      Shelving, Door Knobs, Fire Extinguisher (1) *       
    Install Coded Lockbox (add extra keys) (0)      
    Pay Water / Sewer Taps (0)      
Tue    Apr 7      Set Water Meter (1) *       
Wed    Apr 8      Electric Trim Out (3) *       
    Ceiling Fans (0)      
Mon    Apr 13      HVAC Trim Out (1) *       
Tue    Apr 14      Blower Door Test (1)      
Wed    Apr 15      Plumbing Trim Out (2) *       
    Install Appliances (0) *       
Fri    Apr 17      Paint 3 (2) *       
Tue    Apr 21      Carpet (2)      
    Inspection (Final HVAC) (0)      
    Inspection (Final Plumbing) (0)      
    Inspection (Final Electric) (0)      
Thu    Apr 23      Inspection (Final Building) (4) *       
    Pre Walk Through (0)      
Wed    Apr 29      Stain Hardwood Stairs (1) *       
Thu    Apr 30      Cleaning (1)      
Fri    May 1      Certificate of Occupancy (1) *       
    Keys to Settlement Agent (0)      
    Request Trash Tote From POA Manager (0)      
Mon    May 4      Closing (1)      
    Remove Coded Lockbox (0)      
TO DO - COMPLETED OR DELETED
This bathroom appears to be handicapped accessible as well.
UPGRADES - COMPLETED
---
CRITICAL PATH - COMPLETED
-- -- Ratified Contract? (0)  09.25.2025    
-- -- $2500 Deposit Received (0)  09.25.2025    
-- -- Association Packet Requested (0)  09.25.2025    
-- -- Association Packet Received (0)  09.25.2025    
-- -- Selections Meeting (0)  09.25.2025    
-- -- Selections Sheet Signed (0)  09.25.2025    
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  09.25.2025    
-- -- Deposit For Upgrades Received (0)  09.25.2025    
-- -- Building Permit (30) *   09.25.2025    
-- -- Order Roof & Floor Trusses (1)  09.25.2025    
-- -- Order Windows & Doors (0)  09.25.2025    
-- -- Stake Out Home (1)  09.25.2025    
-- -- Excavate (2)  09.25.2025    
-- -- Inspection (Footers) (1)  09.25.2025    
-- -- Inspection (Concrete Wall) (1)  09.25.2025    
-- -- Pour Footers (1) *   09.25.2025    
-- -- Set Forms (2)  09.25.2025    
-- -- Pour Foundation Walls (1)  09.25.2025    
-- -- Plumb Slab (2)  09.25.2025    
-- -- Inspection (Plumbing Under Slab) (1)  09.25.2025    
-- -- Inspection (Conduit Under Slab) (1)  09.25.2025    
-- -- Prepare Slab (1)  09.25.2025    
-- -- Inspection (Slab) (1)  09.25.2025    
-- -- Inspection (Drain Tile) (0)  09.25.2025    
-- -- Pour Slab (1) *   09.25.2025    
-- -- Settlement Agent Confirmed (0)  09.25.2025    
-- -- Framing I (9)  09.25.2025    
-- -- Order Steps (0)  09.25.2025    
-- -- Order Tubs / Showers (0)  09.25.2025    
-- -- Framing II (8)  09.25.2025    
-- -- Framing III (8) *   09.25.2025    
-- -- Verify Window & Roof Structure (0)  09.25.2025    
-- -- Install Stairs (0) *   10.02.2025    
-- -- Windows & Doors (0) *   10.27.2025    
-- -- Roofing (0) *   09.25.2025    
-- -- Order Cabinets (0)  10.16.2025    
-- -- Deck (0)  10.27.2025    
-- -- Gutters (0)  03.23.2026    
-- -- Driveway (0) *   02.19.2026    
-- -- Privacy Divider / Fence (0) *   09.25.2025    
-- -- HVAC Rough In (4)  10.02.2025    
-- -- Rough In Microwave Vent (0)  10.09.2025    
-- -- Plumbing Rough In (4)  10.09.2025    
-- -- Electric Rough In (4)  01.11.2026     in process 12/3- almost completed
-- -- Inspection (Rough In HVAC) (1)  01.22.2026    
-- -- Inspection (Rough In Plumbing) (1)  02.02.2026    
-- -- Inspection (Rough In Electric) (1)  01.22.2026    
-- -- Inspection (Framing) (1) *   02.19.2026    
-- -- Inspection (Deck Piers) (0)  01.22.2026    
-- -- Exterior Vinyl (0) *   02.02.2026    
-- -- Exterior Stone (0)  02.02.2026    
-- -- Insulation (2) *   02.19.2026    
-- -- Inspection (Insulation) (1)  02.19.2026    
-- -- Inspection (Electric Service) (0)  01.15.2026    
-- -- Drywall (Hang) (4) *   03.05.2026    
-- -- Loan Approval (0)  09.25.2025    
-- -- Deed Preparation (0)  09.25.2025    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   03.16.2026     Done by Mon, Mar 16
-- -- Paint 1 (1)  03.16.2026     Tue, Mar 17
-- -- Garage Door (0)  09.25.2025    
-- -- Cabinet Installation (2) *   03.23.2026     Fri, Mar 20
-- -- Luxury Vinyl Plank (3) *   03.23.2026     Wed, Mar 18. In process 3/18
-- -- Luxury Vinyl Tile (0)  03.23.2026     Wed, Mar 18 In process 3/18
-- -- Appraiser Confirms Construction Completion (0)  09.25.2025    
-- -- C.O. to Lender (0)  09.25.2025    
-- -- Schedule Closing (0)  09.25.2025    
-- -- Buyer Walk Through (1) *   09.25.2025    
-- -- Payment for Upgrades (0)  09.25.2025    
-- -- Review Settlement Statement (0)  09.25.2025    
-- -- Jerry Signs Closing Documents (0)  09.25.2025