VILLAS - 507-101  ::  507 Roman Way #101
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
---
UPGRADES
---
CRITICAL PATH
Wed    Jul 1      Inspection (Rough In HVAC) (1)      
Thu    Jul 2      Inspection (Rough In Plumbing) (1)      
Fri    Jul 3      Inspection (Rough In Electric) (1)      
Mon    Jul 6      Inspection (Framing) (1) *       
Tue    Jul 7      Inspection (Insulation) (1)      
    Inspection (Electric Service) (0)      
    Inspection (Main Sewer Line) (0)      
    Inspection (Main Water Line) (0)      
    Inspection (Final HVAC) (0)      
    Inspection (Final Plumbing) (0)      
    Inspection (Final Electric) (0)      
Wed    Jul 8      Inspection (Final Building) (4) *       
TO DO - COMPLETED OR DELETED
UPGRADES - COMPLETED
---
CRITICAL PATH - COMPLETED
-- -- Inspection (Footers) (1)  10.09.2025    
-- -- Inspection (Concrete Wall) (1)  06.12.2026    
-- -- Inspection (Plumbing Under Slab) (1)  06.12.2026    
-- -- Inspection (Conduit Under Slab) (1)  06.12.2026    
-- -- Inspection (Slab) (1)  06.12.2026    
-- -- Inspection (Drain Tile) (0)  06.12.2026    
-- -- Inspection (Deck Piers) (0)  06.12.2026