VILLAS - 501  ::  501 Roman Way
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS


Sunday (Jun 28)    show all photos
TO DO
SR Jan 19 (163) Blinds White Vinyl One Inch Project Source (Tom will install)
SR Jan 19 (163) Knox Box Fire department to inspect and lock
SR Mar 26 (97) When do we want internet turned on? ASAP
SR Mar 30 (93) Site sign Lettering
SR May 8 (54) Fencing by Glass Doctor Landscaping instead?
CL May 13 (49) Coded lockbox on site. Code of 0501.
SR Jun 25 (6) First Tenant = Aug 5
SR Jun 27 (4) Photos of 301 - coming soon
UPGRADES
---
CRITICAL PATH
    Sod / Seed / Landscaping (0)  12.01.2025    
TO DO - COMPLETED OR DELETED
Foyer Flooring - LVP Confirmed 1/19
Exterior Locks Game plan confirmed?
Railing for decks Dutchway?
How many Type A or Type B units do we need?
SR Dec 30 (183) Locks - exterior, interior, sprinkler, closets New proposal sent to Paul on 1/19
SR Jan 19 (163) Washer & Dryer Raising them up
SR Jan 19 (163) Paint color and sheen Benjamin Moore Alabaster White (876)
SR Jan 19 (163) Storage Closet rental rates
SR Jan 20 (162) Exterior building material - Hardie boards?
SR Jan 20 (162) Numbers - Building, Apartments, Storage Closets Thoughts on designs?
SR Jan 22 (160) Sprinkler System Test We have City documentation of passing their test
CL Jan 29 (153) Scrape Snow for Parking Space 1/28
CL Mar 2 (121) 2 large shutters (in bathtub in 102)
CL Mar 2 (121) Side pieces needed for roofing on window overhangs Just on lot 102
SR Mar 10 (113) Concrete stamp game plan
SR Mar 11 (112) Planter boxes Tom built first one
CL Mar 25 (98) Key to front door is in metal box to the left of the door.
SR Mar 26 (97) When do we want electric meters set?
SR Mar 26 (97) When do we want water meters set?
SR Mar 30 (93) Building Plaque, Apartment Plaques On site
SR Mar 30 (93) Numbers for Storage Rooms On site
SR May 21 (41) Front Door - threshold, door handle holes
SR Apr 23 (69) Closer for front door After correct handle
SR May 21 (41) Patch a few places in the stucco that were damaged for electric installation
CL Jun 4 (27) removing front door handle and epoxing hole and reinstalling handle Needs lock installed 6/17.
UPGRADES - COMPLETED
---
CRITICAL PATH - COMPLETED
-- -- Ratified Contract? (0)  12.01.2025    
-- -- $2500 Deposit Received (0)  12.01.2025    
-- -- Association Packet Requested (0)  12.01.2025    
-- -- Association Packet Received (0)  12.01.2025    
-- -- Selections Meeting (0)  12.01.2025    
-- -- Selections Sheet Signed (0)  12.01.2025    
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  12.01.2025    
-- -- Deposit For Upgrades Received (0)  12.01.2025    
-- -- Building Permit (30) *   12.01.2025    
-- -- Order Roof & Floor Trusses (1)  12.01.2025    
-- -- Order Windows & Doors (0)  12.01.2025    
-- -- Stake Out Home (1)  12.01.2025    
-- -- Excavate (2)  12.01.2025    
-- -- Inspection (Footers) (1)  12.01.2025    
-- -- Inspection (Concrete Wall) (1)  12.01.2025    
-- -- Pour Footers (1) *   12.01.2025    
-- -- Set Forms (2)  12.01.2025    
-- -- Pour Foundation Walls (1)  12.01.2025    
-- -- Plumb Slab (2)  12.01.2025    
-- -- Inspection (Plumbing Under Slab) (1)  12.01.2025    
-- -- Inspection (Conduit Under Slab) (1)  12.01.2025    
-- -- Prepare Slab (1)  12.01.2025    
-- -- Inspection (Slab) (1)  12.01.2025    
-- -- Inspection (Drain Tile) (0)  12.01.2025    
-- -- Pour Slab (1) *   12.01.2025    
-- -- Settlement Agent Confirmed (0)  12.01.2025    
-- -- Framing I (9)  12.01.2025    
-- -- Order Steps (0)  12.01.2025    
-- -- Order Tubs / Showers (0)  12.01.2025    
-- -- Framing II (8)  12.01.2025    
-- -- Framing III (8) *   12.01.2025    
-- -- Verify Window & Roof Structure (0)  12.01.2025    
-- -- Install Stairs (0) *   12.01.2025    
-- -- Windows & Doors (0) *   12.01.2025    
-- -- House Number and Status in Window (0)  12.01.2025    
-- -- Roofing (0) *   12.01.2025    
-- -- Order Cabinets (0)  12.01.2025    
-- -- Order Appliances (0)  12.01.2025    
-- -- Deck (0)  12.01.2025    
-- -- Gutters (0)  12.01.2025    
-- -- Driveway (0) *   12.01.2025    
-- -- Patio (0)  12.01.2025    
-- -- Privacy Divider / Fence (0) *   12.01.2025    
-- -- HVAC Rough In (4)  12.01.2025    
-- -- Rough In Microwave Vent (0)  12.01.2025    
-- -- Plumbing Rough In (4)  12.01.2025    
-- -- Electric Rough In (4)  12.01.2025    
-- -- Inspection (Rough In HVAC) (1)  12.01.2025    
-- -- Inspection (Rough In Plumbing) (1)  12.01.2025    
-- -- Inspection (Rough In Electric) (1)  12.01.2025    
-- -- Inspection (Framing) (1) *   12.01.2025    
-- -- Inspection (Deck Piers) (0)  12.01.2025    
-- -- Exterior Vinyl (0) *   12.01.2025    
-- -- Exterior Stone (0)  12.01.2025    
-- -- Insulation (2) *   12.01.2025    
-- -- Inspection (Insulation) (1)  12.01.2025    
-- -- Inspection (Electric Service) (0)  12.01.2025    
-- -- Set Electric Meter (0) *   12.01.2025    
-- -- Inspection (Main Sewer Line) (0)  12.01.2025    
-- -- Inspection (Main Water Line) (0)  12.01.2025    
-- -- Order Interior Doors & Trim (0)  12.01.2025    
-- -- Drywall (Hang) (4) *   12.01.2025    
-- -- Loan Approval (0)  12.01.2025    
-- -- Deed Preparation (0)  12.01.2025    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   12.01.2025    
-- -- Paint 1 (1)  12.01.2025    
-- -- Garage Door (0)  12.01.2025    
-- -- House Numbers (0)  12.01.2025    
-- -- Mailbox (0)  12.01.2025    
-- -- Cabinet Installation (2) *   12.01.2025    
-- -- Granite Installation (1) *   12.01.2025    
-- -- Interior Trim - Install (3) *   12.01.2025    
-- -- Order Plumbing / Lighting Fixtures (0)  12.01.2025    
-- -- Interior Trim - Paint (1)  12.01.2025    
-- -- Luxury Vinyl Plank (3) *   12.01.2025    
-- -- Luxury Vinyl Tile (0)  12.01.2025    
-- -- Paint 2 (3)  12.01.2025    
-- -- Cover Floors (0)  12.01.2025    
-- -- Deliver Plumbing / Lighting Fixtures (0)  12.01.2025    
-- -- Shoe Moulding (0)  12.01.2025    
-- -- Shelving, Door Knobs, Fire Extinguisher (1) *   12.01.2025    
-- -- Install Coded Lockbox (add extra keys) (0)  12.01.2025    
-- -- Pay Water / Sewer Taps (0)  12.01.2025    
-- -- Set Water Meter (1) *   12.01.2025    
-- -- Electric Trim Out (3) *   12.01.2025    
-- -- Ceiling Fans (0)  12.01.2025    
-- -- HVAC Trim Out (1) *   12.01.2025    
-- -- Blower Door Test (1)  12.01.2025    
-- -- Plumbing Trim Out (2) *   12.01.2025    
-- -- Install Appliances (0) *   12.01.2025    
-- -- Paint 3 (2) *   12.01.2025    
-- -- Carpet (2)  12.01.2025    
-- -- Appraiser Confirms Construction Completion (0)  12.01.2025    
-- -- Inspection (Final HVAC) (0)  12.01.2025    
-- -- Inspection (Final Plumbing) (0)  12.01.2025    
-- -- Inspection (Final Electric) (0)  12.01.2025    
-- -- Inspection (Final Building) (4) *   12.01.2025    
-- -- Pre Walk Through (0)  12.01.2025    
-- -- Stain Hardwood Stairs (1) *   12.01.2025    
-- -- Cleaning (1)  12.01.2025    
-- -- Certificate of Occupancy (1) *   12.01.2025    
-- -- C.O. to Lender (0)  12.01.2025    
-- -- Schedule Closing (0)  12.01.2025    
-- -- Buyer Walk Through (1) *   12.01.2025    
-- -- Payment for Upgrades (0)  12.01.2025    
-- -- Keys to Settlement Agent (0)  12.01.2025    
-- -- Review Settlement Statement (0)  12.01.2025    
-- -- Jerry Signs Closing Documents (0)  12.01.2025    
-- -- Request Trash Tote From POA Manager (0)  12.01.2025    
-- -- Closing (1)  12.01.2025    
-- -- Remove Coded Lockbox (0)  12.01.2025