Tue |
Jul 1 |
Sod / Seed / Landscaping (0) |
|
|
Tue |
Jul 1 |
Remove Coded Lockbox (0) |
|
|
|
-- |
-- |
There is a different shower in this house. Correct? |
|
|
-- |
-- |
Concrete patching needed in rear of home or will grading cover? |
|
|
-- |
-- |
Bottom piece of shiplap is missing. Floor appears to be uneven, does George know how to fix that? |
|
|
-- |
-- |
Cover hardwood treads leading to main level |
|
|
-- |
-- |
All doors are missing middle hinge. Hinges installed are gold that has been painted white. |
|
|
-- |
-- |
There appears to be a framing board sticking out the drywall in the hall bathroom |
Tom |
|
-- |
-- |
Trim out garage |
|
|
-- |
-- |
Semi gloss paint from the crown molding got on the ceiling quite a bit. Ceilings are likely going to have to be repainted to cover up. |
Jesus |
|
-- |
-- |
Black drain in hall bath needs to be installed |
Mazur |
|
-- |
-- |
Light switch cover needed to back patio |
|
|
-- |
-- |
Light switch covers needed in multiple places |
Electrician |
|
-- |
-- |
Trade out WHITE |
|
|
-- |
-- |
Trade out white electrical receptacles on kitchen island |
brown or black |
|
-- |
-- |
Lots of lightbulbs needed |
Electrician |
|
-- |
-- |
Does the light fixture in the bonus room get a cover of some sort? Or maybe we need different lightbulbs? |
|
|
-- |
-- |
I do not see a refrigerator in this unit either |
|
|
-- |
-- |
Lots of garage trim is loose here |
Buddy |
|
-- |
-- |
Large oil spill on driveway |
Power wash - Buddy |
|
-- |
-- |
This shower has a very small edge to avoid water leaking out. The standard shower is significantly deeper. Do we need to do anything additionally? |
|
|
-- |
-- |
CODED LOCKBOX 4242 |
|
|
-- |
-- |
Push nails in back of deck board below door |
|
|
-- |
-- |
Home inspection - Mon, Apr 28 at |
|
|
-- |
-- |
Home inspection - Mon, Apr 28 at 10am |
|
|
-- |
-- |
Home inspection - Mon, Apr 28 at 9am |
|
|
-- |
-- |
Lots of drywall glue spilled in bonus bathtub |
Drywaller Tim |
|
-- |
-- |
Some pretty large cracks in the garage floor |
|
|
-- |
-- |
Can we patch the cracks on the painted steps and paint another coat? |
Jesus. In process 5/7 |
|
-- |
-- |
Final touchups needed on a few spots in the ceilings that have been patched |
Jesus |
|
-- |
-- |
Install window screens |
Jill |
|
-- |
-- |
Bonus bathroom caulk in side splash |
Jesus |
|
-- |
-- |
Cock replace shoe molded bathtub, and bonus bath |
|
|
-- |
-- |
Patch, sand, and paint next to light switch in bonus bath |
Jesus |
|
-- |
-- |
Lots of scratches on oak treads to main level |
Jesus |
|
-- |
-- |
Nail hole at transition strip on stairs to hallway in living room |
Tom will fill these |
|
-- |
-- |
Shiplap and crown molding look amazing!!! |
|
|
-- |
-- |
Patch and paint light fixture headed up second set of steps |
Jesus |
|
-- |
-- |
Cover media box under stairs |
Tom |
|
-- |
-- |
Electrical outlets on island are not fixed to cabinet |
Electrician |
|
-- |
-- |
Caulk the shoe mold at bonus bath |
Jesus |
|
-- |
-- |
Gap on deck boards |
Buddy |
|
-- |
-- |
Strap wires in island |
Electrician |
|
-- |
-- |
Furnaxe wire needs strapping |
|
|
-- |
-- |
FIll gap between drywall and switch cover in bonus bathroom |
Jesus |
|
-- |
-- |
Fill hole in garage door ceiling |
Jesus |
|
-- |
-- |
Furnace wire needs strapping |
Mast and Brunk |
|
-- |
-- |
Screw in nails on the back trim |
White board under outside of exterior door to dining room |
|
-- |
-- |
|
|
|
-- |
-- |
|
|
|
-- |
-- |
|
|
|
-- |
-- |
The door going into the bonus bathroom is very crooked |
Jorge |
|
-- |
-- |
Patch and paint drywall seams on kitchen ceiling |
Jesus |
|
-- |
-- |
Patch and paint drywall in living room next to far right inside can light |
Jesus |
|
-- |
-- |
Patch and paint drywall seams under second floor stairwell |
Jesus |
|
-- |
-- |
Patch and paint nail pops on railing side of stairwell leading from 1st to 2nd floor, below railing |
Jesus |
|
-- |
-- |
Patch and paint holes at wall switches at bottom of 2nd floor stairwell |
Jesus |
|
-- |
-- |
Patch and paint holes at wall switches at first floor bathroom |
Jesus |
|
-- |
-- |
Chip in bath tub |
Afternoon of May 8 |
|
-- |
-- |
Touchup cleaning from painters repairs |
Lynn |
|
-- |
-- |
Paint touchup throughout |
Jesus |
|
-- |
-- |
Light switch cover needed in bonus bathroom |
Jill |
|
-- |
-- |
Large drywall repair in stairwell |
Tom, Jesus |
|
-- |
-- |
Remove paint drips in master bathroom |
Jesus |
|
-- |
-- |
Curved wall on stairwell |
Jesus |
|
-- |
-- |
scratches on upper kitchen cabinets |
Fred - installed week of June 9 (Wed, Thu) |
|
-- |
-- |
remove paint from LVT and LVP |
Jesus |
|
-- |
-- |
remove plastic from DW |
|
|
-- |
-- |
reclean cabinets of dust adn clean inside trashcan |
Lynn |
|
-- |
-- |
power wash front of house |
Jill- will be done 6/5 |
|
-- |
-- |
remove trash and sweep driveway |
Jill |
|
-- |
-- |
hang fire extinguisher |
|
|
-- |
-- |
clean ss sink |
Lynn |
|
-- |
-- |
spray for ants on deck- may be nesting in door trim |
Jill |
|
-- |
-- |
address flashing underneath deck door |
Tom |
|
-- |
-- |
replace deck board |
|
|
-- |
-- |
recaulk pedestal sink at wall |
Jesus |
|
-- |
-- |
fill nail holes at bonus bath shoe in front of tub |
Jesus |
|
-- |
-- |
remove gravel frmo backyard and sod |
Pettit |
|
-- |
-- |
garage door not operating |
Jill, Jeff |
|
-- |
-- |
remove black scuff mark frmo corner of island |
Lynn |
|
-- |
-- |
Closing delayed because of appraisal error |
|
|
-- |
-- |
Fix flooring bonus bath |
Denny |
|
-- |
-- |
Put door back on bonus bath |
|
|
-- |
-- |
Sod needed |
|
|
-- |
-- |
reclean surfaces and floors after punch is completed. |
Lynn |
|
-- |
-- |
Pressure wash front of house |
|
|
-- |
-- |
Remove yellow cover from smoke detector |
Jill |
|
-- |
-- |
Final cleaning |
|
|
-- |
-- |
Clean up a few things in the garage |
Jill |
|
-- |
-- |
Julie Hamann, 540-246-7922 |
|
|
-- |
-- |
I do not think the heat pump is functioning correctly. It’s set to 72 and a 78 in the house. |
Outside unit is not running |
|
-- |
-- |
Ratified Contract? (0) 11.13.2024 |
|
|
|
|
Finished room behind garage
|
|
|
|
Finished Full Bath in Bonus Room
|
|
|
|
Expanded 12 x 18 Deck
|
|
|
|
Level 3 Quartz in Kitchen
|
|
|
|
Double Pull Out Trash Can
|
|
|
|
Expanded Driveway
|
|
|
|
4" Crown Moulding on Main Level
|
|
|
|
ShipLap on Living Room Wall
|
|
|
|
Digital Deadbolt
|
|
|
|
Amendment to increase price by $25,900
|
|
-- |
-- |
$2500 Deposit Received (0) 11.20.2024 |
|
|
-- |
-- |
Association Packet Requested (0) 06.30.2025 |
|
|
-- |
-- |
Association Packet Received (0) 11.16.2024 |
|
|
-- |
-- |
Selections Meeting (0) 12.31.2024 |
|
|
-- |
-- |
Selections Sheet Signed (0) 01.06.2025 |
12/30: sent to Julie |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 01.23.2025 |
1/5: Sent to Julie |
|
-- |
-- |
Deposit For Upgrades Received (0) 01.22.2025 |
|
|
-- |
-- |
Building Permit (30) 10.07.2024 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 10.17.2024 |
|
|
-- |
-- |
Order Windows & Doors (0) 12.02.2024 |
|
|
-- |
-- |
Stake Out Home (1) 10.14.2024 |
|
|
-- |
-- |
Excavate (2) 10.21.2024 |
|
|
-- |
-- |
Inspection (Footers) (1) 10.21.2024 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 10.21.2024 |
|
|
-- |
-- |
Pour Footers (1) * 10.21.2024 |
|
|
-- |
-- |
Set Forms (2) 11.13.2024 |
|
|
-- |
-- |
Pour Foundation Walls (1) 11.13.2024 |
|
|
-- |
-- |
Plumb Slab (2) 11.13.2024 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 11.24.2024 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 11.24.2024 |
|
|
-- |
-- |
Prepare Slab (1) 11.24.2024 |
|
|
-- |
-- |
Inspection (Slab) (1) 12.02.2024 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 12.02.2024 |
|
|
-- |
-- |
Pour Slab (1) * 12.02.2024 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 01.24.2025 |
1/23: sent to Brittany |
|
-- |
-- |
Framing I (9) 12.19.2024 |
|
|
-- |
-- |
Order Steps (0) 01.16.2025 |
|
|
-- |
-- |
Order Tubs / Showers (0) 01.23.2025 |
|
|
-- |
-- |
Framing II (8) 12.28.2024 |
|
|
-- |
-- |
Framing III (8) * 01.13.2025 |
|
|
-- |
-- |
Verify Window & Roof Structure (0) 01.16.2025 |
|
|
-- |
-- |
Install Stairs (0) 01.16.2025 |
|
|
-- |
-- |
Windows & Doors (0) * 01.23.2025 |
|
|
-- |
-- |
House Number and Status in Window (0) 01.29.2025 |
|
|
-- |
-- |
Roofing (0) * 02.02.2025 |
|
|
-- |
-- |
Order Cabinets (0) 01.23.2025 |
|
|
-- |
-- |
Order Appliances (0) 02.20.2025 |
200509352240380141 |
|
-- |
-- |
Deck (0) 03.28.2025 |
|
|
-- |
-- |
Gutters (0) 03.19.2025 |
|
|
-- |
-- |
Driveway (0) * 04.06.2025 |
|
|
-- |
-- |
Patio (0) 03.15.2025 |
|
|
-- |
-- |
Privacy Divider / Fence (0) 04.06.2025 |
|
|
-- |
-- |
HVAC Rough In (4) 01.25.2025 |
in process 1/22 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) 02.01.2025 |
|
|
-- |
-- |
Rough In Microwave Vent (0) 01.25.2025 |
|
|
-- |
-- |
Plumbing Rough In (4) 01.25.2025 |
In process 1/25 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 02.01.2025 |
|
|
-- |
-- |
Electric Rough In (4) 01.30.2025 |
In process 1/29 |
|
-- |
-- |
Inspection (Rough In Electric) (1) 02.01.2025 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 02.20.2025 |
|
|
-- |
-- |
Inspection (Framing) (1) * 02.01.2025 |
|
|
-- |
-- |
Exterior Vinyl (0) * 03.15.2025 |
|
|
-- |
-- |
Exterior Stone (0) 04.14.2025 |
in process 4/9 |
|
-- |
-- |
Insulation (2) * 02.03.2025 |
In process 2/1 |
|
-- |
-- |
Inspection (Insulation) (1) 02.08.2025 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 02.20.2025 |
|
|
-- |
-- |
Set Electric Meter (0) * 04.09.2025 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 02.20.2025 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 02.20.2025 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 02.20.2025 |
TOM- Need LR SHIPLAP and main level crown molding |
|
-- |
-- |
Drywall (Hang) (4) * 02.08.2025 |
Stocked 2/5 |
|
-- |
-- |
Loan Approval (0) 05.01.2025 |
Capital First Mortgage (75% LTV) |
|
-- |
-- |
Deed Preparation (0) 03.24.2025 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 02.16.2025 |
In process 2/12 |
|
-- |
-- |
Paint 1 (1) 02.26.2025 |
|
|
-- |
-- |
Garage Door (0) * 03.19.2025 |
|
|
-- |
-- |
House Numbers (0) 04.28.2025 |
|
|
-- |
-- |
Mailbox (0) 04.16.2025 |
|
|
-- |
-- |
Cabinet Installation (2) * 02.26.2025 |
Thu, Feb 20 |
|
-- |
-- |
Granite Installation (1) * 03.05.2025 |
|
|
-- |
-- |
Interior Trim - Install (3) * 03.12.2025 |
In process 3/8 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) 03.24.2025 |
|
|
-- |
-- |
Interior Trim - Paint (1) 03.15.2025 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 03.26.2025 |
In process 3/21 |
|
-- |
-- |
Luxury Vinyl Tile (0) 03.26.2025 |
In process 3/21 |
|
-- |
-- |
Paint 2 (3) 03.12.2025 |
|
|
-- |
-- |
Cover Floors (1) 04.27.2025 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 03.24.2025 |
|
|
-- |
-- |
Shoe Moulding (0) 04.06.2025 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) * 04.16.2025 |
In process 4/9 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 04.21.2025 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 03.27.2025 |
|
|
-- |
-- |
Set Water Meter (0) * 04.14.2025 |
|
|
-- |
-- |
Electric Trim Out (3) 04.16.2025 |
In process 4/6 |
|
-- |
-- |
Ceiling Fans (0) 04.16.2025 |
|
|
-- |
-- |
HVAC Trim Out (1) 04.16.2025 |
|
|
-- |
-- |
Blower Door Test (1) 05.06.2025 |
Monday, May 5th at 4pm |
|
-- |
-- |
Plumbing Trim Out (2) 03.28.2025 |
In process 3/26 |
|
-- |
-- |
Install Appliances (0) * 04.27.2025 |
Oven has been installed. Microwave and dishwasher are in dining room. |
|
-- |
-- |
Paint 3 (2) * 04.27.2025 |
|
|
-- |
-- |
Carpet (2) 04.14.2025 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 05.27.2025 |
|
|
-- |
-- |
Inspection (Final HVAC) (1) 05.08.2025 |
Tuesday, May 6 |
|
-- |
-- |
Inspection (Final Plumbing) (1) 05.08.2025 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 05.08.2025 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 05.08.2025 |
|
|
-- |
-- |
Pre Walk Through (0) 04.28.2025 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 04.27.2025 |
In process 4/19 |
|
-- |
-- |
Cleaning (1) 05.10.2025 |
Almost completed 5/7 |
|
-- |
-- |
Certificate of Occupancy (1) * 05.09.2025 |
|
|
-- |
-- |
C.O. to Lender (0) 05.09.2025 |
|
|
-- |
-- |
Schedule Closing (0) 06.09.2025 |
|
|
-- |
-- |
Buyer Walk Through (1) 05.10.2025 |
Thursday 4 PM |
|
-- |
-- |
Payment for Upgrades (0) 05.05.2025 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 05.05.2025 |
|
|
-- |
-- |
Review Settlement Statement (0) 05.11.2025 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 06.09.2025 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 05.08.2025 |
|
|
-- |
-- |
Closing (1) 06.11.2025 |