| TO DO |
| CL |
Jan 25 (9) |
CODED LOCKBOX 1010 |
|
|
| CL |
Jan 28 (6) |
Touchup paint and caulk needed on shoe molding throughout |
Jesus |
|
| SR |
Jan 8 (26) |
Install kick plate and shoe mold for bonus vanity |
Jorge (Quill) |
|
| CL |
Jan 24 (10) |
Utility room door will need to be painted |
Jesus |
|
| CL |
Jan 28 (6) |
Two door knobs are missing in the bonus room |
Paul |
|
| CL |
Jan 31 (3) |
Paint front door |
Jesus |
|
| CL |
Jan 31 (3) |
Drywall repair near outlet and bonus room |
Jesus |
|
| CL |
Jan 31 (3) |
Hinge missing on door to bonus bath |
Jesus |
|
| CL |
Jan 31 (3) |
Shower rod needed in bonus bath |
Paul |
|
| CL |
Jan 31 (3) |
Lots of touchup paint and caulking needed in bonus bathroom trim |
Jesus |
|
| CL |
Jan 31 (3) |
Flooring does not quite reach the shoe mold in bonus room near bathroom |
Denny |
|
| CL |
Jan 31 (3) |
Make sure that paint is removed from hinges. Orie of hinges are covered with white paint throughout. |
Jesus |
|
| CL |
Jan 28 (6) |
Brown outlet covers |
Kitchen island, Jill |
|
| CL |
Jan 31 (3) |
Some patching and touchup paint is needed in the primary bedroom |
Jesus |
|
|
| UPGRADES |
| |
|
Stained hardwood steps to the bedroom level
|
|
|
| CRITICAL PATH |
|
|
|
Privacy Divider / Fence (0) * |
|
|
|
|
|
Sod / Seed / Landscaping (0) |
|
|
|
|
|
Mailbox (0) |
|
|
|
Tue
|
Feb 3
|
Shelving, Door Knobs, Fire Extinguisher (1) * |
Bath accessories installed and handles. No shelving or mirrors 1/28 |
|
|
|
|
Appraiser Confirms Construction Completion (0) |
Johnny Hensley - tell when ready |
|
|
Wed
|
Feb 4
|
Inspection (Final Building) (4) * |
Fri, Jan 30 |
|
|
|
|
Pre Walk Through (0) |
|
|
|
Tue
|
Feb 10
|
Stain Hardwood Stairs (1) * |
|
|
|
Wed
|
Feb 11
|
Cleaning (1) |
|
|
|
Thu
|
Feb 12
|
Certificate of Occupancy (1) * |
|
|
|
|
|
C.O. to Lender (0) |
|
|
|
|
|
Schedule Closing (0) |
Rate lock expires January 14 |
|
|
Fri
|
Feb 13
|
Buyer Walk Through (1) * |
|
|
|
|
|
Payment for Upgrades (0) |
|
|
|
|
|
Review Settlement Statement (0) |
|
|
|
|
|
Jerry Signs Closing Documents (0) |
|
|
|
Mon
|
Feb 16
|
Closing (1) |
Brittany @ West View Title |
|
|
|
|
Remove Coded Lockbox (0) |
|
|
|
| TO DO - COMPLETED OR DELETED |
|
|
Water line to refrigerator |
Make sure it shows up. It’s here 10/8 |
|
|
|
Patio out back or deck? |
Which will it be? |
|
|
|
Back right main level wall - nails that missed corner stud |
Tom fixing 10/29 |
|
|
|
Is the basement bathtub supposed to be hooked up to plumbing or just set in the back unfinished bathroom? It is currently not hooked up but sitting in the garage. |
|
|
|
|
Drywall stocked 10/ 31 |
|
|
|
|
Farmsink ordered 11/3 |
|
|
|
|
Bonus Room & Bathroom = Now Will Be Finished |
|
|
|
|
Finish bonus room and bathroom |
|
|
|
|
Bonus room needs all patched in the concrete from the shower |
|
|
|
|
I do not see the farmhouse sink on site here |
|
|
|
|
Cabinet installation is still in process |
|
|
|
|
Bonus Bathroom Vanity needs installed |
|
|
|
|
Game plan for incorrect cabinets? |
|
|
| SR |
Jan 4 (30) |
Secure back panel of kitchen island |
TJ |
|
| CL |
Jan 7 (27) |
Quite a bit of trim missing in bonus room and a door |
Jorge |
|
| CL |
Jan 7 (27) |
Handles missing on bonus vanity and front trim |
|
|
| CL |
Jan 7 (27) |
Hardware missing on coffee bar |
|
|
| CL |
Jan 7 (27) |
Free 3 drawer stack |
|
|
| CL |
Jan 7 (27) |
Large gap at pantry cabinet near wall |
|
|
| SR |
Jan 8 (26) |
Install kick plate at kitchen base cabinet next to pantry |
|
|
| SR |
Jan 4 (30) |
Bonus bathroom countertop needs to be secured |
Jesus |
|
| CL |
Jan 7 (27) |
Side splash needs installed bonus vanity |
Jesus |
|
| SR |
Jan 8 (26) |
Install handles for bonus room vanity |
Jill, Tom - drill holes |
|
| CL |
Jan 21 (13) |
Self closing hinge needed here |
Jorge |
|
| CL |
Jan 28 (6) |
Lightbulbs needed, and quite a few places |
Electrician, Jill |
|
| CL |
Jan 7 (27) |
No trash can in kitchen |
On order, Fred |
|
| SR |
Jan 8 (26) |
Remove coffee bar - incorrect color |
Tom |
|
| CL |
Jan 21 (13) |
Top drawer of the trashcan does not seem to be closing correctly |
Fred, Tom |
|
| CL |
Jan 24 (10) |
Microwave vent not working 1/24 |
Tom |
|
| CL |
Jan 24 (10) |
Bottom drawer of 3 drawer stack isn’t closing properly |
Fred, Tom |
|
| CL |
Jan 28 (6) |
Silver dining room light needs to be switched out for black? |
Jill, Electrician |
|
| SR |
Jan 12 (22) |
Cracked window in upper sash of primary bathroom |
Tom |
|
|
| UPGRADES - COMPLETED |
| |
|
LVP bonus room
|
|
| |
|
Expanded driveway
|
|
| |
|
Salinas White level three granite countertops
|
|
| |
|
Coffee bar stained cabinet with glass shelving and crown molding and level three granite
|
|
| |
|
Farmhouse sink
|
|
| |
|
Double pull out trashcan and island
|
|
| |
|
Microwave vented into the exterior
|
|
| |
|
Farmhouse style plumbing package
|
|
| |
|
Luxury vinyl plank in upstairs hallway and bedrooms
|
|
| |
|
Additional ceiling fan in living room
|
|
| |
|
Digital deadbolt
|
|
| |
|
Finished Bonus Room Behind Garage (carpet, closet)
|
|
| |
|
Finished Full Bathroom In Bonus Room (luxury vinyl tile, 24" vanity)
|
|
| |
|
Amendment to increase price by $26,120
|
|
|
| CRITICAL PATH - COMPLETED |
| -- |
-- |
Ratified Contract? (0) 03.20.2025 |
|
|
| -- |
-- |
$2500 Deposit Received (0) 03.25.2025 |
|
|
| -- |
-- |
Association Packet Requested (0) 06.30.2025 |
|
|
| -- |
-- |
Association Packet Received (0) 04.01.2025 |
|
|
| -- |
-- |
Selections Meeting (0) 04.18.2025 |
|
|
| -- |
-- |
Selections Sheet Signed (0) 04.22.2025 |
4/17: sent to Keenan |
|
| -- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 11.08.2025 |
11/6: new version send to buyers |
|
| -- |
-- |
Deposit For Upgrades Received (0) 04.28.2025 |
|
|
| -- |
-- |
Building Permit (30) * 04.11.2025 |
|
|
| -- |
-- |
Order Roof & Floor Trusses (1) 08.04.2025 |
|
|
| -- |
-- |
Order Windows & Doors (0) 09.15.2025 |
|
|
| -- |
-- |
Stake Out Home (1) 05.27.2025 |
|
|
| -- |
-- |
Excavate (2) 05.27.2025 |
|
|
| -- |
-- |
Inspection (Footers) (1) 07.31.2025 |
|
|
| -- |
-- |
Inspection (Concrete Wall) (1) 05.27.2025 |
|
|
| -- |
-- |
Pour Footers (1) * 05.27.2025 |
|
|
| -- |
-- |
Set Forms (2) 05.27.2025 |
|
|
| -- |
-- |
Pour Foundation Walls (1) 05.27.2025 |
|
|
| -- |
-- |
Plumb Slab (2) 07.31.2025 |
|
|
| -- |
-- |
Inspection (Plumbing Under Slab) (1) 07.31.2025 |
|
|
| -- |
-- |
Inspection (Conduit Under Slab) (1) 07.31.2025 |
|
|
| -- |
-- |
Prepare Slab (1) 07.31.2025 |
|
|
| -- |
-- |
Inspection (Slab) (1) 07.31.2025 |
|
|
| -- |
-- |
Inspection (Drain Tile) (0) 09.28.2025 |
|
|
| -- |
-- |
Pour Slab (1) * 07.31.2025 |
|
|
| -- |
-- |
Settlement Agent Confirmed (0) 05.07.2025 |
|
|
| -- |
-- |
Framing I (9) 09.04.2025 |
|
|
| -- |
-- |
Order Steps (0) 09.15.2025 |
|
|
| -- |
-- |
Order Tubs / Showers (0) 09.28.2025 |
|
|
| -- |
-- |
Framing II (8) 09.17.2025 |
|
|
| -- |
-- |
Framing III (8) * 09.25.2025 |
|
|
| -- |
-- |
Verify Window & Roof Structure (0) 09.28.2025 |
|
|
| -- |
-- |
Install Stairs (0) * 09.28.2025 |
|
|
| -- |
-- |
Windows & Doors (0) * 09.28.2025 |
|
|
| -- |
-- |
House Number and Status in Window (0) 10.15.2025 |
|
|
| -- |
-- |
Roofing (0) * 09.28.2025 |
|
|
| -- |
-- |
Order Cabinets (0) 10.16.2025 |
|
|
| -- |
-- |
Order Appliances (0) 10.24.2025 |
Kate will order 11/15 for 12/15 install |
|
| -- |
-- |
Deck (0) 01.04.2026 |
|
|
| -- |
-- |
Gutters (0) 12.06.2025 |
|
|
| -- |
-- |
Driveway (0) * 11.19.2025 |
|
|
| -- |
-- |
Patio (0) 01.10.2026 |
|
|
| -- |
-- |
HVAC Rough In (4) 09.28.2025 |
|
|
| -- |
-- |
Rough In Microwave Vent (0) 10.01.2025 |
|
|
| -- |
-- |
Plumbing Rough In (4) 10.08.2025 |
|
|
| -- |
-- |
Electric Rough In (4) 10.19.2025 |
In process 10/15 |
|
| -- |
-- |
Inspection (Rough In HVAC) (1) 10.21.2025 |
|
|
| -- |
-- |
Inspection (Rough In Plumbing) (1) 10.21.2025 |
|
|
| -- |
-- |
Inspection (Rough In Electric) (1) 10.21.2025 |
|
|
| -- |
-- |
Inspection (Framing) (1) * 10.21.2025 |
|
|
| -- |
-- |
Inspection (Deck Piers) (0) 12.22.2025 |
|
|
| -- |
-- |
Exterior Vinyl (0) * 12.04.2025 |
|
|
| -- |
-- |
Exterior Stone (0) 12.04.2025 |
|
|
| -- |
-- |
Insulation (2) * 10.22.2025 |
|
|
| -- |
-- |
Inspection (Insulation) (1) 10.30.2025 |
|
|
| -- |
-- |
Inspection (Electric Service) (0) 10.30.2025 |
|
|
| -- |
-- |
Set Electric Meter (0) * 12.01.2025 |
|
|
| -- |
-- |
Inspection (Main Sewer Line) (0) 10.30.2025 |
|
|
| -- |
-- |
Inspection (Main Water Line) (0) 10.30.2025 |
|
|
| -- |
-- |
Order Interior Doors & Trim (0) 12.01.2025 |
|
|
| -- |
-- |
Drywall (Hang) (4) * 11.03.2025 |
|
|
| -- |
-- |
Loan Approval (0) 01.10.2026 |
Jodee @ United (Conventional) |
|
| -- |
-- |
Deed Preparation (0) 01.08.2026 |
|
|
| -- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 12.03.2025 |
In process 11/28 |
|
| -- |
-- |
Paint 1 (1) 12.03.2025 |
|
|
| -- |
-- |
Garage Door (0) 01.08.2026 |
|
|
| -- |
-- |
House Numbers (0) 01.23.2026 |
|
|
| -- |
-- |
Cabinet Installation (2) * 01.04.2026 |
In process 12/17 |
|
| -- |
-- |
Granite Installation (1) * 01.20.2026 |
Tue, Jan 20 |
|
| -- |
-- |
Interior Trim - Install (3) * 01.07.2026 |
In process 12/20 |
|
| -- |
-- |
Order Plumbing / Lighting Fixtures (0) 12.22.2025 |
|
|
| -- |
-- |
Interior Trim - Paint (1) 01.07.2026 |
|
|
| -- |
-- |
Luxury Vinyl Plank (3) * 01.07.2026 |
|
|
| -- |
-- |
Luxury Vinyl Tile (0) 01.07.2026 |
|
|
| -- |
-- |
Paint 2 (3) 01.21.2026 |
In process 1/14 |
|
| -- |
-- |
Cover Floors (0) 01.31.2026 |
|
|
| -- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 12.22.2025 |
|
|
| -- |
-- |
Shoe Moulding (0) 01.14.2026 |
In process 1/7 |
|
| -- |
-- |
Install Coded Lockbox (add extra keys) (0) 01.25.2026 |
|
|
| -- |
-- |
Pay Water / Sewer Taps (0) 01.11.2026 |
|
|
| -- |
-- |
Set Water Meter (1) * 01.12.2026 |
|
|
| -- |
-- |
Electric Trim Out (3) * 01.30.2026 |
In process 1/28. 3rd floor left to do |
|
| -- |
-- |
Ceiling Fans (0) 01.28.2026 |
|
|
| -- |
-- |
HVAC Trim Out (1) * 01.21.2026 |
|
|
| -- |
-- |
Blower Door Test (1) 01.30.2026 |
|
|
| -- |
-- |
Plumbing Trim Out (2) * 01.30.2026 |
In process. Toilets installs 1/17 |
|
| -- |
-- |
Install Appliances (0) * 01.26.2026 |
In process - 1/21 |
|
| -- |
-- |
Paint 3 (2) * 01.28.2026 |
|
|
| -- |
-- |
Carpet (2) 01.14.2026 |
|
|
| -- |
-- |
Inspection (Final HVAC) (0) 01.30.2026 |
|
|
| -- |
-- |
Inspection (Final Plumbing) (0) 01.30.2026 |
|
|
| -- |
-- |
Inspection (Final Electric) (0) 01.30.2026 |
|
|
| -- |
-- |
Keys to Settlement Agent (0) 01.27.2026 |
|
|
| -- |
-- |
Request Trash Tote From POA Manager (0) 01.27.2026 |
|
|