- 7  ::  1610 Bald Eagle Circle
[ BUILD: 1811-0090 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
Wed    Nov 27      Ratified Contract? (0)      
Wed    Nov 27      $2500 Deposit Received (0)      
Wed    Nov 27      Association Packet Requested (0)      
Wed    Nov 27      Association Packet Received (0)      
Wed    Nov 27      Selections Meeting (0)      
Wed    Nov 27      Selections Sheet Signed (0)      
Wed    Nov 27      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Wed    Nov 27      Deposit For Upgrades Received (0)      
Wed    Nov 27      Inspection (Concrete Wall) (1)      
Thu    Nov 28      Inspection (Conduit Under Slab) (1)      
Fri    Nov 29      Inspection (Drain Tile) (0)      
Fri    Nov 29      Settlement Agent Confirmed (0)      
Fri    Nov 29      Verify Window & Roof Structure (0)      
Fri    Nov 29      Patio (0)      
Fri    Nov 29      Rough In Microwave Vent (0)      
Fri    Nov 29      Inspection (Rough In Plumbing) (1)      
Mon    Dec 2      Inspection (Rough In Electric) (1)      
Tue    Dec 3      Inspection (Deck Piers) (0)      
Tue    Dec 3      Inspection (Framing) (1)      
Wed    Dec 4      Exterior Stone (0)      
Wed    Dec 4      Set Electric Meter (0)      
Wed    Dec 4      Inspection (Main Water Line) (0)      
Wed    Dec 4      Loan Approval (0)      
Wed    Dec 4      Deed Preparation (0)      
Wed    Dec 4      Mailbox (0)      
Wed    Dec 4      Interior Trim - Paint (1)      
Thu    Dec 5      Ceiling Fans (0)      
Thu    Dec 5      Blower Door Test (1)      
Fri    Dec 6      Inspection (Final HVAC) (1)      
Mon    Dec 9      Inspection (Final Plumbing) (1)      
Tue    Dec 10      Inspection (Final Electric) (1)      
Wed    Dec 11      Stain Hardwood Stairs (1)      
Thu    Dec 12      Request Trash Tote From POA Manager (0)      
--   --   Let Luke know when permit application has been submitted Submitted Tues, Nov 13
--   --   Pour walls
--   --   Window not level (see pic) concern? Bottom has been fixed but now is top uneven?
--   --   Please Add Plumbing To Laundry for Laundry SInk
--   --   Charlene likes the fireplace in the former nodel on teh angualr wall- in looking at her floor plans- is this what she is getting? She willd ecide on eact size of raised hearth at walk through Kate to get abck in touch with Luke
--   --   Swicth placement of shower and closet
--   --   Swap location of shower and linen closet in master bath
--   --   Six foot shower in master bath Five foot fiberglass pan, one foot seat
--   --   Shrink the windows in the basement? Kate will chat with Charlene at some point
--   --   REQUESTING ELECTRICAL WALKTHROUGH WEEK OF 3/18- DAVE TRAVELING AGAIN ON 3/25- KATE TO CONFRIM DATE ASAP Friday 3/22 at 1:00 PM
--   --   Exterior- Stucco same as 1716, dark brown shutters, Charleston Brick
--   --   Price
--   --   Price out sink $130 or less we install
--   --   One added snap, over dining light- credit for dining chandelier
--   --   Dimmer switch on dining light Harry knows
--   --   Fan without dining light
--   --   Dimmer switches on eight living room snap lights Harry knows
--   --   Snap light in hall before master bedroom
--   --   Master bath closet- Fluorescent over door and bifold
--   --   Pocket door into bath closet
--   --   Plumbing g for laundry sink- ad 20” so k if less than $130.00
--   --   Laundry sink add from Ferguson if less than $130 Plumbing appears to be in 4/7
--   --   Charlene = 540-538-7354, sebastiancw2@gmail.com
--   --   All Snap Lights in hallways
--   --   gas line and electric stove outlet for the dual fuel stove.
--   --   Expand master closet? Conversation with Jerry
--   --   Brown for front door, garage door? Conversation with Jerry
--   --   Possible master bathroom shower and closet change? Lower shower head?
--   --   Missing part on patio door door astrigal
--   --   Sconces above mirrors in master bathroom?
--   --   Need to close July 17
--   --   Hearth tile Partially done 7/17
--   --   Stain handrails prior to carpet installation Maher- Tuesday 7/9- stain prior to carpet install
--   --   Make sure Ron knows Adjusted corrected measurements for mirrors in master bathroom for appropriate Sconce height Discuss with Tom and Harry
--   --   Open shelving in master ? Kate will have Charlene talk to Ron
--   --   Complete cabinets wt and hardware j stall action
--   --   Complete cabinet and hardware installation in kitchen crown and shoe Kyle, July 25
--   --   Install screens and patio door screens. JB
--   --   Install PVC under deck JB
--   --   Caulk all toilets JB
--   --   Caulk in front of tubs and showers JB
--   --   Install mantle at fireplace Tom/JB
--   --   Do we have all the lights we need for here at seven? Including exterior lights?
--   --   Stain and install shutters 90% complete
--   --   Ceiling drywall repair Tim- Saturday July 6- sanding Monday July 9- ready for paint Tuesday
--   --   Stove on Friday On site 7/13
--   --   Propane company arrives July 8 or 9
--   --   Kitchen faucet
--   --   gas set up tomorrow 7/16
--   --   Cabinet repairs by end of this week (7/15)
--   --   Handrail needs staining 7/17
--   --   Drywall repair/paint basement bath
--   --   Touch up paint needed 7/17 Nearly complete as of July 25
--   --   CODED LOCKBOX 7777
--   --   plywood pantry shelf tom
--   --   box around heating duct tom
--   --   Basement patio door screen
--   --   Finish screen porch 7/20 July 25
--   --   Paint bathroom trim
--   --   Basement bath and outlet covers 7/20
--   --   Finish hearth and baseboard
--   --   Baseboard in master bathroom
--   --   Birch plywood on shelf in pantry
--   --   Set appliances
--   --   Gas range tight counter adjustment
--   --   Closet door adjustment upstairs bedroom
--   --   Low-voltage cover upstairs bedroom Harry
--   --   Powder bath install Light at vanity bulbs
--   --   Install hall bath mirror VA Installations
--   --   Change bulbs to the Bulbs buyer provided for bathrooms time to communicate with Harry
--   --   Pocket door adjustment to hall bathroom Tom
--   --   Install patio door part
--   --   Install shutters
--   --   Install microwave
--   --   Sliding glass door adjustment
--   --   Punch out kitchen cabinetry add missing doors drawers and crown molding
--   --   Pocket door to laundry room adjustment Tom
--   --   Finish screened in porch
--   --   Adjust stairwell Sconce light leading to basement. Crooked. Tom
--   --   Sand and stain post it and handrails at stairs
--   --   Clean out storage area
--   --   Basement be- adjust closet doors
--   --   Basement bathroom install vanity light and mirror
--   --   Basement bathroom install hardware VA Installations
--   --   Reattach insulation storage area and add plastic to exposed insulation
--   --   Address gap in laminate flooring in the downstairs closet under the stairs OK distressed with Eric. He was going to stop by and take a look at it
--   --   Grout ceramic at fireplace Joe - July 25
--   --   Shower door Arrives July 30, Installed July 31
--   --   Window screens Arrive July 31
--   --   Basement patio door screen On site, needs to be installed
--   --   Touch up caulk at vanity in powder room Painter or Red
--   --   Finish putting up screen on porch
--   --   Finish putting up screen on porch
--   --   Stickers off upper window above front door and clean from outside
--   --   Add final trim piece above stucco to ceiling at screened in porch
--   --   Cracked tile near tab in basement bathroom to be fixed when Tyler comes to and stop by or backsplash
--   --   Install final shutter
--   --   handles on bathroom cupboards and one kitchen cupboard CK Expecting hardware to come in this week and Kyle will install and Coordinate with the buyer
--   --   drawer front to be replaced in kitchen Kyle Has and will coordinate with buyer
--   --   pocket door fixed between kitchen and washroom
--   --   outside plug on back patio does not work Harry will check this out
--   --   moulding needs fixing on screened porch
--   --   broken tile on downstairs bathroom floor (Joe is coming at end of month for this) Joe
--   --   threshold between storage area and hallway in basement is not attached
--   --   Repair loose trim piece Tom
--   --   Dave 540-538-5945
--   --   Charlene 540-538-3754
-- -- Building Permit (30)      
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1)      
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *        Wed, Feb 6
-- -- Framing I (9)       Begins Monday Feb 14 or so
-- -- Order Steps (0)      
-- -- Order Tubs / Showers (0)       In process as of Mar 11
-- -- Framing II (8)      
-- -- Framing III (8) *       
-- -- Install Stairs (0)       At Mongers
-- -- Windows & Doors (0)      
-- -- House Number and Status in Window (0)      
-- -- Roofing (0)       In process as of Mar 21
-- -- Order Cabinets (0)      
-- -- Order Appliances (0)      
-- -- Deck (0)       by 7/16
-- -- Gutters (0)       Ready as of June 10
-- -- Driveway (0)       pouring Tuesday, July 9
-- -- Privacy Divider / Fence (0)      
-- -- Sod / Seed / Landscaping (0)       this week 7/15
-- -- HVAC Rough In (4)       Excel, starting week of Mar 25; Done by Apr 3
-- -- Inspection (Rough In HVAC) (1)       Thu, Apr 11
-- -- Plumbing Rough In (4)       Week of Apr 1
-- -- Electric Rough In (4)      
-- -- Exterior Vinyl (0) *       
-- -- Insulation (2)       Appears 90% complete 4/13
-- -- Inspection (Insulation) (1)       Apr 15
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)       Tom
-- -- Drywall (Hang) (4) *        In process as of Apr 22
-- -- Drywall (Tape, Block, Skim, Sand) (6) *       
-- -- Paint 1 (1)      
-- -- Garage Door (0)      
-- -- House Numbers (0)      
-- -- Cabinet Installation (2) *        Unknown timeframe. Ready as of May 29.
-- -- Granite Installation (1) *        July 5
-- -- Interior Trim - Install (3)       95% complete 6/1
-- -- Order Plumbing / Lighting Fixtures (0)      
-- -- Luxury Vinyl Plank (3) *       
-- -- Luxury Vinyl Tile (0)       should finish 7/18
-- -- Paint 2 (3)      
-- -- Cover Floors (1)       Before appliance delivery on Fri, June 28
-- -- Deliver Plumbing / Lighting Fixtures (0)       Fans in laundry room 6/22
-- -- Shoe Moulding (0)      
-- -- Shelving, Door Knobs, Fire Extinguisher (0)       All but bathroom closets
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Set Water Meter (0)      
-- -- Electric Trim Out (3)       Ongoing 7/17-bathrooms not done
-- -- HVAC Trim Out (1)      
-- -- Plumbing Trim Out (2)       All done except kitchen faucet
-- -- Install Appliances (0) *        Buddy will do-7/19
-- -- Paint 3 (2) *        Tuesday 7/9
-- -- Carpet (2)       Either Wednesday 7/10 or Thursday 7/11
-- -- Appraiser Confirms Construction Completion (0)      
-- -- Inspection (Final Building) (2) *        7/19 afternoon
-- -- Pre Walk Through (0)      
-- -- Cleaning (1)       Kelly Tuesday 7/31
-- -- Certificate of Occupancy (1) *       
-- -- C.O. to Lender (0)      
-- -- Schedule Closing (0)       7/17
-- -- Buyer Walk Through (1)       Hoping for Monday 7/15
-- -- Payment for Upgrades (0)       $1505
-- -- Keys to Settlement Agent (0)      
-- -- Review Settlement Statement (0)      
-- -- Jerry Signs Closing Documents (0)       West View Title
-- -- Closing (1)      
-- -- Remove Coded Lockbox (0)