3 32 16 14 15 39 1 24 5 30 29 17 10 40 4 27 7 22 ADDR
- 7  ::  1610 Bald Eagle Circle
[ BUILD: 1811-0090 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
Mon    Dec 15      Ratified Contract? (0)      
Mon    Dec 15      $2500 Deposit Received (0)      
Mon    Dec 15      Association Packet Requested (0)      
Mon    Dec 15      Association Packet Received (0)      
Mon    Dec 15      Selections Meeting (0)      
Mon    Dec 15      Selections Sheet Signed (0)      
Mon    Dec 15      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Mon    Dec 15      Deposit For Upgrades Received (0)      
Mon    Dec 15      Inspection (Concrete Wall) (1)      
Tue    Dec 16      Inspection (Conduit Under Slab) (1)      
Wed    Dec 17      Inspection (Drain Tile) (0)      
Wed    Dec 17      Settlement Agent Confirmed (0)      
Wed    Dec 17      Verify Window & Roof Structure (0)      
Wed    Dec 17      Patio (0)      
Wed    Dec 17      Rough In Microwave Vent (0)      
Wed    Dec 17      Inspection (Rough In Plumbing) (1)      
Thu    Dec 18      Inspection (Rough In Electric) (1)      
Fri    Dec 19      Inspection (Framing) (1) *       
Mon    Dec 22      Inspection (Deck Piers) (0)      
Mon    Dec 22      Exterior Stone (0)      
Mon    Dec 22      Set Electric Meter (0) *       
Mon    Dec 22      Inspection (Main Water Line) (0)      
Mon    Dec 22      Loan Approval (0)      
Mon    Dec 22      Deed Preparation (0)      
Mon    Dec 22      Mailbox (0)      
Mon    Dec 22      Interior Trim - Paint (1)      
Tue    Dec 23      Ceiling Fans (0)      
Tue    Dec 23      Blower Door Test (1)      
Wed    Dec 24      Inspection (Final HVAC) (1)      
Thu    Dec 25      Inspection (Final Plumbing) (1)      
Fri    Dec 26      Inspection (Final Electric) (1)      
Mon    Dec 29      Stain Hardwood Stairs (1) *       
Tue    Dec 30      Request Trash Tote From POA Manager (0)      
--   --   Let Luke know when permit application has been submitted Submitted Tues, Nov 13
--   --   Pour walls
--   --   Window not level (see pic) concern? Bottom has been fixed but now is top uneven?
--   --   Please Add Plumbing To Laundry for Laundry SInk
--   --   Charlene likes the fireplace in the former nodel on teh angualr wall- in looking at her floor plans- is this what she is getting? She willd ecide on eact size of raised hearth at walk through Kate to get abck in touch with Luke
--   --   Swicth placement of shower and closet
--   --   Swap location of shower and linen closet in master bath
--   --   Six foot shower in master bath Five foot fiberglass pan, one foot seat
--   --   Shrink the windows in the basement? Kate will chat with Charlene at some point
--   --   REQUESTING ELECTRICAL WALKTHROUGH WEEK OF 3/18- DAVE TRAVELING AGAIN ON 3/25- KATE TO CONFRIM DATE ASAP Friday 3/22 at 1:00 PM
--   --   Exterior- Stucco same as 1716, dark brown shutters, Charleston Brick
--   --   Price
--   --   Price out sink $130 or less we install
--   --   One added snap, over dining light- credit for dining chandelier
--   --   Dimmer switch on dining light Harry knows
--   --   Fan without dining light
--   --   Dimmer switches on eight living room snap lights Harry knows
--   --   Snap light in hall before master bedroom
--   --   Master bath closet- Fluorescent over door and bifold
--   --   Pocket door into bath closet
--   --   Plumbing g for laundry sink- ad 20” so k if less than $130.00
--   --   Laundry sink add from Ferguson if less than $130 Plumbing appears to be in 4/7
--   --   Charlene = 540-538-7354, sebastiancw2@gmail.com
--   --   All Snap Lights in hallways
--   --   gas line and electric stove outlet for the dual fuel stove.
--   --   Expand master closet? Conversation with Jerry
--   --   Brown for front door, garage door? Conversation with Jerry
--   --   Possible master bathroom shower and closet change? Lower shower head?
--   --   Missing part on patio door door astrigal
--   --   Sconces above mirrors in master bathroom?
--   --   Need to close July 17
--   --   Hearth tile Partially done 7/17
--   --   Stain handrails prior to carpet installation Maher- Tuesday 7/9- stain prior to carpet install
--   --   Make sure Ron knows Adjusted corrected measurements for mirrors in master bathroom for appropriate Sconce height Discuss with Tom and Harry
--   --   Open shelving in master ? Kate will have Charlene talk to Ron
--   --   Complete cabinets wt and hardware j stall action
--   --   Complete cabinet and hardware installation in kitchen crown and shoe Kyle, July 25
--   --   Install screens and patio door screens. JB
--   --   Install PVC under deck JB
--   --   Caulk all toilets JB
--   --   Caulk in front of tubs and showers JB
--   --   Install mantle at fireplace Tom/JB
--   --   Do we have all the lights we need for here at seven? Including exterior lights?
--   --   Stain and install shutters 90% complete
--   --   Ceiling drywall repair Tim- Saturday July 6- sanding Monday July 9- ready for paint Tuesday
--   --   Stove on Friday On site 7/13
--   --   Propane company arrives July 8 or 9
--   --   Kitchen faucet
--   --   gas set up tomorrow 7/16
--   --   Cabinet repairs by end of this week (7/15)
--   --   Handrail needs staining 7/17
--   --   Drywall repair/paint basement bath
--   --   Touch up paint needed 7/17 Nearly complete as of July 25
--   --   CODED LOCKBOX 7777
--   --   plywood pantry shelf tom
--   --   box around heating duct tom
--   --   Basement patio door screen
--   --   Finish screen porch 7/20 July 25
--   --   Paint bathroom trim
--   --   Basement bath and outlet covers 7/20
--   --   Finish hearth and baseboard
--   --   Baseboard in master bathroom
--   --   Birch plywood on shelf in pantry
--   --   Set appliances
--   --   Gas range tight counter adjustment
--   --   Closet door adjustment upstairs bedroom
--   --   Low-voltage cover upstairs bedroom Harry
--   --   Powder bath install Light at vanity bulbs
--   --   Install hall bath mirror VA Installations
--   --   Change bulbs to the Bulbs buyer provided for bathrooms time to communicate with Harry
--   --   Pocket door adjustment to hall bathroom Tom
--   --   Install patio door part
--   --   Install shutters
--   --   Install microwave
--   --   Sliding glass door adjustment
--   --   Punch out kitchen cabinetry add missing doors drawers and crown molding
--   --   Pocket door to laundry room adjustment Tom
--   --   Finish screened in porch
--   --   Adjust stairwell Sconce light leading to basement. Crooked. Tom
--   --   Sand and stain post it and handrails at stairs
--   --   Clean out storage area
--   --   Basement be- adjust closet doors
--   --   Basement bathroom install vanity light and mirror
--   --   Basement bathroom install hardware VA Installations
--   --   Reattach insulation storage area and add plastic to exposed insulation
--   --   Address gap in laminate flooring in the downstairs closet under the stairs OK distressed with Eric. He was going to stop by and take a look at it
--   --   Grout ceramic at fireplace Joe - July 25
--   --   Shower door Arrives July 30, Installed July 31
--   --   Window screens Arrive July 31
--   --   Basement patio door screen On site, needs to be installed
--   --   Touch up caulk at vanity in powder room Painter or Red
--   --   Finish putting up screen on porch
--   --   Finish putting up screen on porch
--   --   Stickers off upper window above front door and clean from outside
--   --   Add final trim piece above stucco to ceiling at screened in porch
--   --   Cracked tile near tab in basement bathroom to be fixed when Tyler comes to and stop by or backsplash
--   --   Install final shutter
--   --   handles on bathroom cupboards and one kitchen cupboard CK Expecting hardware to come in this week and Kyle will install and Coordinate with the buyer
--   --   drawer front to be replaced in kitchen Kyle Has and will coordinate with buyer
--   --   pocket door fixed between kitchen and washroom
--   --   outside plug on back patio does not work Harry will check this out
--   --   moulding needs fixing on screened porch
--   --   broken tile on downstairs bathroom floor (Joe is coming at end of month for this) Joe
--   --   threshold between storage area and hallway in basement is not attached
--   --   Repair loose trim piece Tom
--   --   Dave 540-538-5945
--   --   Charlene 540-538-3754
-- -- Building Permit (30) *       
    CREDIT- Farm House Sink  
    CREDIT- switch from White Valley Granite to Fantasy Brown Granite  
    Add plumbing for laundry sink and 20" buyer to approve  
    CREDIT- Standard Tile-  
    Pocket door master bath  
    Shower door  
    Shower- contract allowance $3600 New tile material cost with floor tile- $2400 Joe tile installation $1850- tile tear out and redo- $300  
    CREDIT- appliances  
    Appliance install charge  
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1) *       
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *        Wed, Feb 6
-- -- Framing I (9)       Begins Monday Feb 14 or so
    Extended Garage  
-- -- Order Steps (0)      
-- -- Order Tubs / Showers (0)       In process as of Mar 11
-- -- Framing II (8)      
    Screened Porch off living room 12 x 18  
-- -- Framing III (8) *       
    Gas Fireplace with raised hearth  
    Add linen closet in master bathroom  
-- -- Install Stairs (0) *        At Mongers
-- -- Windows & Doors (0) *       
-- -- House Number and Status in Window (0)      
-- -- Roofing (0) *        In process as of Mar 21
-- -- Order Cabinets (0)      
-- -- Order Appliances (0)      
-- -- Deck (0)       by 7/16
    Smaller Deck off living room 6x10  
-- -- Gutters (0)       Ready as of June 10
-- -- Driveway (0) *        pouring Tuesday, July 9
    Expanded (6x10) Concrete Patio off basement door  
-- -- Privacy Divider / Fence (0) *       
-- -- Sod / Seed / Landscaping (0)       this week 7/15
-- -- HVAC Rough In (4)       Excel, starting week of Mar 25; Done by Apr 3
-- -- Plumbing Rough In (4)       Week of Apr 1
-- -- Electric Rough In (4)      
-- -- Inspection (Rough In HVAC) (1)       Thu, Apr 11
-- -- Exterior Vinyl (0) *       
-- -- Insulation (2) *        Appears 90% complete 4/13
-- -- Inspection (Insulation) (1)       Apr 15
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)       Tom
-- -- Drywall (Hang) (4) *        In process as of Apr 22
-- -- Drywall (Tape, Block, Skim, Sand) (6) *       
-- -- Paint 1 (1)      
-- -- Garage Door (0)      
-- -- House Numbers (0)      
-- -- Cabinet Installation (2) *        Unknown timeframe. Ready as of May 29.
-- -- Granite Installation (1) *        July 5
-- -- Interior Trim - Install (3) *        95% complete 6/1
-- -- Order Plumbing / Lighting Fixtures (0)      
-- -- Luxury Vinyl Plank (3) *       
    Additional Cost for LVP in basement over contract allowance ($2600)  
    Extending Luxury Vinyl Plank into Basement Bedroom ( price over carpet)  
-- -- Luxury Vinyl Tile (0)       should finish 7/18
    Gray Summit Ceramic Tile upgraded size- 12 x 24 (includes 3 baths and laundry room)  
-- -- Paint 2 (3)      
-- -- Cover Floors (1)       Before appliance delivery on Fri, June 28
-- -- Deliver Plumbing / Lighting Fixtures (0)       Fans in laundry room 6/22
    Allowance for upgrade to farm sink  
-- -- Shoe Moulding (0)      
-- -- Shelving, Door Knobs, Fire Extinguisher (0) *        All but bathroom closets
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Set Water Meter (0) *       
-- -- Electric Trim Out (3) *        Ongoing 7/17-bathrooms not done
-- -- HVAC Trim Out (1) *       
-- -- Plumbing Trim Out (2) *        All done except kitchen faucet
-- -- Install Appliances (0) *        Buddy will do-7/19
    Amana Stainless Steel Appliances  
    Gas Range-piping and difference over standard range  
-- -- Paint 3 (2) *        Tuesday 7/9
-- -- Carpet (2)       Either Wednesday 7/10 or Thursday 7/11
    Upgraded Berbur on Stairs  
-- -- Appraiser Confirms Construction Completion (0)      
-- -- Inspection (Final Building) (2) *        7/19 afternoon
-- -- Pre Walk Through (0)      
-- -- Cleaning (1)       Kelly Tuesday 7/31
-- -- Certificate of Occupancy (1) *       
-- -- C.O. to Lender (0)      
-- -- Schedule Closing (0)       7/17
-- -- Buyer Walk Through (1) *        Hoping for Monday 7/15
-- -- Payment for Upgrades (0)       $1505
-- -- Keys to Settlement Agent (0)      
-- -- Review Settlement Statement (0)      
-- -- Jerry Signs Closing Documents (0)       West View Title
-- -- Closing (1)      
-- -- Remove Coded Lockbox (0)