Wed |
Nov 27 |
Ratified Contract? (0) |
|
|
Wed |
Nov 27 |
$2500 Deposit Received (0) |
|
|
Wed |
Nov 27 |
Association Packet Requested (0) |
|
|
Wed |
Nov 27 |
Association Packet Received (0) |
|
|
Wed |
Nov 27 |
Selections Meeting (0) |
|
|
Wed |
Nov 27 |
Selections Sheet Signed (0) |
|
|
Wed |
Nov 27 |
Amendment for Upgrades (B,S,L,T,BCP) (0) |
|
|
Wed |
Nov 27 |
Deposit For Upgrades Received (0) |
|
|
Wed |
Nov 27 |
Inspection (Concrete Wall) (1) |
|
|
Thu |
Nov 28 |
Inspection (Conduit Under Slab) (1) |
|
|
Fri |
Nov 29 |
Inspection (Drain Tile) (0) |
|
|
Fri |
Nov 29 |
Settlement Agent Confirmed (0) |
|
|
Fri |
Nov 29 |
Verify Window & Roof Structure (0) |
|
|
Fri |
Nov 29 |
Patio (0) |
|
|
Fri |
Nov 29 |
Rough In Microwave Vent (0) |
|
|
Fri |
Nov 29 |
Inspection (Rough In Plumbing) (1) |
|
|
Mon |
Dec 2 |
Inspection (Rough In Electric) (1) |
|
|
Tue |
Dec 3 |
Inspection (Deck Piers) (0) |
|
|
Tue |
Dec 3 |
Inspection (Framing) (1) |
|
|
Wed |
Dec 4 |
Exterior Stone (0) |
|
|
Wed |
Dec 4 |
Set Electric Meter (0) |
|
|
Wed |
Dec 4 |
Inspection (Main Water Line) (0) |
|
|
Wed |
Dec 4 |
Loan Approval (0) |
|
|
Wed |
Dec 4 |
Deed Preparation (0) |
|
|
Wed |
Dec 4 |
Mailbox (0) |
|
|
Wed |
Dec 4 |
Interior Trim - Paint (1) |
|
|
Thu |
Dec 5 |
Ceiling Fans (0) |
|
|
Thu |
Dec 5 |
Blower Door Test (1) |
|
|
Fri |
Dec 6 |
Inspection (Final HVAC) (1) |
|
|
Mon |
Dec 9 |
Inspection (Final Plumbing) (1) |
|
|
Tue |
Dec 10 |
Inspection (Final Electric) (1) |
|
|
Wed |
Dec 11 |
Stain Hardwood Stairs (1) |
|
|
Thu |
Dec 12 |
Request Trash Tote From POA Manager (0) |
|
|
|
-- |
-- |
Let Luke know when permit application has been submitted |
Submitted Tues, Nov 13 |
|
-- |
-- |
Pour walls |
|
|
-- |
-- |
Window not level (see pic) concern? |
Bottom has been fixed but now is top uneven? |
|
-- |
-- |
Please Add Plumbing To Laundry for Laundry SInk |
|
|
-- |
-- |
Charlene likes the fireplace in the former nodel on teh angualr wall- in looking at her floor plans- is this what she is getting? She willd ecide on eact size of raised hearth at walk through |
Kate to get abck in touch with Luke |
|
-- |
-- |
Swicth placement of shower and closet |
|
|
-- |
-- |
Swap location of shower and linen closet in master bath |
|
|
-- |
-- |
Six foot shower in master bath |
Five foot fiberglass pan, one foot seat |
|
-- |
-- |
Shrink the windows in the basement? |
Kate will chat with Charlene at some point |
|
-- |
-- |
REQUESTING ELECTRICAL WALKTHROUGH WEEK OF 3/18- DAVE TRAVELING AGAIN ON 3/25- KATE TO CONFRIM DATE ASAP |
Friday 3/22 at 1:00 PM |
|
-- |
-- |
Exterior- Stucco same as 1716, dark brown shutters, Charleston Brick |
|
|
-- |
-- |
Price |
|
|
-- |
-- |
Price out sink $130 or less we install |
|
|
-- |
-- |
One added snap, over dining light- credit for dining chandelier |
|
|
-- |
-- |
Dimmer switch on dining light |
Harry knows |
|
-- |
-- |
Fan without dining light |
|
|
-- |
-- |
Dimmer switches on eight living room snap lights |
Harry knows |
|
-- |
-- |
Snap light in hall before master bedroom |
|
|
-- |
-- |
Master bath closet- Fluorescent over door and bifold |
|
|
-- |
-- |
Pocket door into bath closet |
|
|
-- |
-- |
Plumbing g for laundry sink- ad 20” so k if less than $130.00 |
|
|
-- |
-- |
Laundry sink add from Ferguson if less than $130 |
Plumbing appears to be in 4/7 |
|
-- |
-- |
Charlene = 540-538-7354, sebastiancw2@gmail.com |
|
|
-- |
-- |
All Snap Lights in hallways |
|
|
-- |
-- |
gas line and electric stove outlet for the dual fuel stove. |
|
|
-- |
-- |
Expand master closet? |
Conversation with Jerry |
|
-- |
-- |
Brown for front door, garage door? |
Conversation with Jerry |
|
-- |
-- |
Possible master bathroom shower and closet change? |
Lower shower head? |
|
-- |
-- |
Missing part on patio door door |
astrigal |
|
-- |
-- |
Sconces above mirrors in master bathroom? |
|
|
-- |
-- |
Need to close July 17 |
|
|
-- |
-- |
Hearth tile |
Partially done 7/17 |
|
-- |
-- |
Stain handrails prior to carpet installation |
Maher- Tuesday 7/9- stain prior to carpet install |
|
-- |
-- |
Make sure Ron knows Adjusted corrected measurements for mirrors in master bathroom for appropriate Sconce height |
Discuss with Tom and Harry |
|
-- |
-- |
Open shelving in master ? |
Kate will have Charlene talk to Ron |
|
-- |
-- |
Complete cabinets wt and hardware j stall action |
|
|
-- |
-- |
Complete cabinet and hardware installation in kitchen crown and shoe |
Kyle, July 25 |
|
-- |
-- |
Install screens and patio door screens. |
JB |
|
-- |
-- |
Install PVC under deck |
JB |
|
-- |
-- |
Caulk all toilets |
JB |
|
-- |
-- |
Caulk in front of tubs and showers |
JB |
|
-- |
-- |
Install mantle at fireplace |
Tom/JB |
|
-- |
-- |
Do we have all the lights we need for here at seven? Including exterior lights? |
|
|
-- |
-- |
Stain and install shutters |
90% complete |
|
-- |
-- |
Ceiling drywall repair |
Tim- Saturday July 6- sanding Monday July 9- ready for paint Tuesday |
|
-- |
-- |
Stove on Friday |
On site 7/13 |
|
-- |
-- |
Propane company arrives July 8 or 9 |
|
|
-- |
-- |
Kitchen faucet |
|
|
-- |
-- |
gas set up tomorrow 7/16 |
|
|
-- |
-- |
Cabinet repairs by end of this week (7/15) |
|
|
-- |
-- |
Handrail needs staining 7/17 |
|
|
-- |
-- |
Drywall repair/paint basement bath |
|
|
-- |
-- |
Touch up paint needed 7/17 |
Nearly complete as of July 25 |
|
-- |
-- |
CODED LOCKBOX 7777 |
|
|
-- |
-- |
plywood pantry shelf |
tom |
|
-- |
-- |
box around heating duct |
tom |
|
-- |
-- |
Basement patio door screen |
|
|
-- |
-- |
Finish screen porch 7/20 |
July 25 |
|
-- |
-- |
Paint bathroom trim |
|
|
-- |
-- |
Basement bath and outlet covers 7/20 |
|
|
-- |
-- |
Finish hearth and baseboard |
|
|
-- |
-- |
Baseboard in master bathroom |
|
|
-- |
-- |
Birch plywood on shelf in pantry |
|
|
-- |
-- |
Set appliances |
|
|
-- |
-- |
Gas range tight counter adjustment |
|
|
-- |
-- |
Closet door adjustment upstairs bedroom |
|
|
-- |
-- |
Low-voltage cover upstairs bedroom |
Harry |
|
-- |
-- |
Powder bath install Light at vanity |
bulbs |
|
-- |
-- |
Install hall bath mirror |
VA Installations |
|
-- |
-- |
Change bulbs to the Bulbs buyer provided for bathrooms time to communicate with Harry |
|
|
-- |
-- |
Pocket door adjustment to hall bathroom |
Tom |
|
-- |
-- |
Install patio door part |
|
|
-- |
-- |
Install shutters |
|
|
-- |
-- |
Install microwave |
|
|
-- |
-- |
Sliding glass door adjustment |
|
|
-- |
-- |
Punch out kitchen cabinetry add missing doors drawers and crown molding |
|
|
-- |
-- |
Pocket door to laundry room adjustment |
Tom |
|
-- |
-- |
Finish screened in porch |
|
|
-- |
-- |
Adjust stairwell Sconce light leading to basement. Crooked. |
Tom |
|
-- |
-- |
Sand and stain post it and handrails at stairs |
|
|
-- |
-- |
Clean out storage area |
|
|
-- |
-- |
Basement be- adjust closet doors |
|
|
-- |
-- |
Basement bathroom install vanity light and mirror |
|
|
-- |
-- |
Basement bathroom install hardware |
VA Installations |
|
-- |
-- |
Reattach insulation storage area and add plastic to exposed insulation |
|
|
-- |
-- |
Address gap in laminate flooring in the downstairs closet under the stairs |
OK distressed with Eric. He was going to stop by and take a look at it |
|
-- |
-- |
Grout ceramic at fireplace |
Joe - July 25 |
|
-- |
-- |
Shower door |
Arrives July 30, Installed July 31 |
|
-- |
-- |
Window screens |
Arrive July 31 |
|
-- |
-- |
Basement patio door screen |
On site, needs to be installed |
|
-- |
-- |
Touch up caulk at vanity in powder room |
Painter or Red |
|
-- |
-- |
Finish putting up screen on porch |
|
|
-- |
-- |
Finish putting up screen on porch |
|
|
-- |
-- |
Stickers off upper window above front door and clean from outside |
|
|
-- |
-- |
Add final trim piece above stucco to ceiling at screened in porch |
|
|
-- |
-- |
Cracked tile near tab in basement bathroom to be fixed when Tyler comes to and stop by or backsplash |
|
|
-- |
-- |
Install final shutter |
|
|
-- |
-- |
handles on bathroom cupboards and one kitchen cupboard |
CK Expecting hardware to come in this week and Kyle will install and Coordinate with the buyer |
|
-- |
-- |
drawer front to be replaced in kitchen |
Kyle Has and will coordinate with buyer |
|
-- |
-- |
pocket door fixed between kitchen and washroom |
|
|
-- |
-- |
outside plug on back patio does not work |
Harry will check this out |
|
-- |
-- |
moulding needs fixing on screened porch |
|
|
-- |
-- |
broken tile on downstairs bathroom floor (Joe is coming at end of month for this) |
Joe |
|
-- |
-- |
threshold between storage area and hallway in basement is not attached |
|
|
-- |
-- |
Repair loose trim piece |
Tom |
|
-- |
-- |
Dave 540-538-5945 |
|
|
-- |
-- |
Charlene 540-538-3754 |
|
|
-- |
-- |
Building Permit (30) |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) |
|
|
-- |
-- |
Order Windows & Doors (0) |
|
|
-- |
-- |
Stake Out Home (1) |
|
|
-- |
-- |
Excavate (2) |
|
|
-- |
-- |
Inspection (Footers) (1) |
|
|
-- |
-- |
Pour Footers (1) |
|
|
-- |
-- |
Set Forms (2) |
|
|
-- |
-- |
Pour Foundation Walls (1) |
|
|
-- |
-- |
Plumb Slab (2) |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) |
|
|
-- |
-- |
Prepare Slab (1) |
|
|
-- |
-- |
Inspection (Slab) (1) |
|
|
-- |
-- |
Pour Slab (1) * |
Wed, Feb 6 |
|
-- |
-- |
Framing I (9) |
Begins Monday Feb 14 or so |
|
-- |
-- |
Order Steps (0) |
|
|
-- |
-- |
Order Tubs / Showers (0) |
In process as of Mar 11 |
|
-- |
-- |
Framing II (8) |
|
|
-- |
-- |
Framing III (8) * |
|
|
-- |
-- |
Install Stairs (0) |
At Mongers |
|
-- |
-- |
Windows & Doors (0) |
|
|
-- |
-- |
House Number and Status in Window (0) |
|
|
-- |
-- |
Roofing (0) |
In process as of Mar 21 |
|
-- |
-- |
Order Cabinets (0) |
|
|
-- |
-- |
Order Appliances (0) |
|
|
-- |
-- |
Deck (0) |
by 7/16 |
|
-- |
-- |
Gutters (0) |
Ready as of June 10 |
|
-- |
-- |
Driveway (0) |
pouring Tuesday, July 9 |
|
-- |
-- |
Privacy Divider / Fence (0) |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) |
this week 7/15 |
|
-- |
-- |
HVAC Rough In (4) |
Excel, starting week of Mar 25; Done by Apr 3 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) |
Thu, Apr 11 |
|
-- |
-- |
Plumbing Rough In (4) |
Week of Apr 1 |
|
-- |
-- |
Electric Rough In (4) |
|
|
-- |
-- |
Exterior Vinyl (0) * |
|
|
-- |
-- |
Insulation (2) |
Appears 90% complete 4/13 |
|
-- |
-- |
Inspection (Insulation) (1) |
Apr 15 |
|
-- |
-- |
Inspection (Electric Service) (0) |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) |
|
|
-- |
-- |
Order Interior Doors & Trim (0) |
Tom |
|
-- |
-- |
Drywall (Hang) (4) * |
In process as of Apr 22 |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * |
|
|
-- |
-- |
Paint 1 (1) |
|
|
-- |
-- |
Garage Door (0) |
|
|
-- |
-- |
House Numbers (0) |
|
|
-- |
-- |
Cabinet Installation (2) * |
Unknown timeframe. Ready as of May 29. |
|
-- |
-- |
Granite Installation (1) * |
July 5 |
|
-- |
-- |
Interior Trim - Install (3) |
95% complete 6/1 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * |
|
|
-- |
-- |
Luxury Vinyl Tile (0) |
should finish 7/18 |
|
-- |
-- |
Paint 2 (3) |
|
|
-- |
-- |
Cover Floors (1) |
Before appliance delivery on Fri, June 28 |
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) |
Fans in laundry room 6/22 |
|
-- |
-- |
Shoe Moulding (0) |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) |
All but bathroom closets |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) |
|
|
-- |
-- |
Set Water Meter (0) |
|
|
-- |
-- |
Electric Trim Out (3) |
Ongoing 7/17-bathrooms not done |
|
-- |
-- |
HVAC Trim Out (1) |
|
|
-- |
-- |
Plumbing Trim Out (2) |
All done except kitchen faucet |
|
-- |
-- |
Install Appliances (0) * |
Buddy will do-7/19 |
|
-- |
-- |
Paint 3 (2) * |
Tuesday 7/9 |
|
-- |
-- |
Carpet (2) |
Either Wednesday 7/10 or Thursday 7/11 |
|
-- |
-- |
Appraiser Confirms Construction Completion (0) |
|
|
-- |
-- |
Inspection (Final Building) (2) * |
7/19 afternoon |
|
-- |
-- |
Pre Walk Through (0) |
|
|
-- |
-- |
Cleaning (1) |
Kelly Tuesday 7/31 |
|
-- |
-- |
Certificate of Occupancy (1) * |
|
|
-- |
-- |
C.O. to Lender (0) |
|
|
-- |
-- |
Schedule Closing (0) |
7/17 |
|
-- |
-- |
Buyer Walk Through (1) |
Hoping for Monday 7/15 |
|
-- |
-- |
Payment for Upgrades (0) |
$1505 |
|
-- |
-- |
Keys to Settlement Agent (0) |
|
|
-- |
-- |
Review Settlement Statement (0) |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) |
West View Title |
|
-- |
-- |
Closing (1) |
|
|
-- |
-- |
Remove Coded Lockbox (0) |
|
|