Wed | Nov 27 | Ratified Contract? (0) | ||
Wed | Nov 27 | $2500 Deposit Received (0) | ||
Wed | Nov 27 | Association Packet Requested (0) | ||
Wed | Nov 27 | Association Packet Received (0) | ||
Wed | Nov 27 | Selections Meeting (0) | ||
Wed | Nov 27 | Selections Sheet Signed (0) | ||
Wed | Nov 27 | Amendment for Upgrades (B,S,L,T,BCP) (0) | ||
Wed | Nov 27 | Deposit For Upgrades Received (0) | ||
Wed | Nov 27 | Inspection (Concrete Wall) (1) | ||
Thu | Nov 28 | Inspection (Conduit Under Slab) (1) | ||
Fri | Nov 29 | Inspection (Drain Tile) (0) | ||
Fri | Nov 29 | Settlement Agent Confirmed (0) | ||
Fri | Nov 29 | Verify Window & Roof Structure (0) | ||
Fri | Nov 29 | Patio (0) | ||
Fri | Nov 29 | Rough In Microwave Vent (0) | ||
Fri | Nov 29 | Inspection (Rough In Plumbing) (1) | ||
Mon | Dec 2 | Inspection (Rough In Electric) (1) | ||
Tue | Dec 3 | Inspection (Deck Piers) (0) | ||
Tue | Dec 3 | Inspection (Framing) (1) | ||
Wed | Dec 4 | Exterior Stone (0) | ||
Wed | Dec 4 | Set Electric Meter (0) | ||
Wed | Dec 4 | Inspection (Main Water Line) (0) | ||
Wed | Dec 4 | Loan Approval (0) | ||
Wed | Dec 4 | Deed Preparation (0) | ||
Wed | Dec 4 | Mailbox (0) | ||
Wed | Dec 4 | Order Plumbing / Lighting Fixtures (0) | ||
Wed | Dec 4 | Interior Trim - Paint (1) | ||
Thu | Dec 5 | Ceiling Fans (0) | ||
Thu | Dec 5 | Blower Door Test (1) | ||
Fri | Dec 6 | Inspection (Final HVAC) (1) | ||
Mon | Dec 9 | Inspection (Final Plumbing) (1) | ||
Tue | Dec 10 | Inspection (Final Electric) (1) | ||
Wed | Dec 11 | Stain Hardwood Stairs (1) | ||
-- | -- | Replace Window | Ready to replace 9/1/2021 | |
-- | -- | Rick out of town Sept 28 - Oct 5 | ||
-- | -- | Building Permit (30) 09.01.2021 | ||
-- | -- | Order Roof & Floor Trusses (1) 09.01.2021 | ||
-- | -- | Order Windows & Doors (0) 09.01.2021 | ||
-- | -- | Stake Out Home (1) 09.01.2021 | ||
-- | -- | Excavate (2) 09.01.2021 | ||
-- | -- | Inspection (Footers) (1) 09.01.2021 | ||
-- | -- | Pour Footers (1) 09.01.2021 | ||
-- | -- | Set Forms (2) 09.01.2021 | ||
-- | -- | Pour Foundation Walls (1) 09.01.2021 | ||
-- | -- | Plumb Slab (2) 09.01.2021 | ||
-- | -- | Inspection (Plumbing Under Slab) (1) 09.01.2021 | ||
-- | -- | Prepare Slab (1) 09.01.2021 | ||
-- | -- | Inspection (Slab) (1) 09.01.2021 | ||
-- | -- | Pour Slab (1) * 09.01.2021 | ||
-- | -- | Framing I (9) 09.01.2021 | ||
-- | -- | Order Steps (0) 09.01.2021 | ||
-- | -- | Order Tubs / Showers (0) 09.01.2021 | ||
-- | -- | Framing II (8) 09.01.2021 | ||
-- | -- | Framing III (8) * 09.01.2021 | ||
-- | -- | Install Stairs (0) 09.01.2021 | ||
-- | -- | Windows & Doors (0) 09.01.2021 | ||
-- | -- | House Number and Status in Window (0) 09.01.2021 | ||
-- | -- | Roofing (0) 09.01.2021 | ||
-- | -- | Order Cabinets (0) 09.01.2021 | ||
-- | -- | Order Appliances (0) 09.01.2021 | ||
-- | -- | Deck (0) 09.01.2021 | ||
-- | -- | Gutters (0) 09.01.2021 | ||
-- | -- | Driveway (0) 09.01.2021 | ||
-- | -- | Privacy Divider / Fence (0) 09.01.2021 | ||
-- | -- | Sod / Seed / Landscaping (0) 09.01.2021 | ||
-- | -- | HVAC Rough In (4) 09.01.2021 | ||
-- | -- | Inspection (Rough In HVAC) (1) 09.01.2021 | ||
-- | -- | Plumbing Rough In (4) 09.01.2021 | ||
-- | -- | Electric Rough In (4) 09.01.2021 | ||
-- | -- | Exterior Vinyl (0) * 09.01.2021 | ||
-- | -- | Insulation (2) 09.01.2021 | ||
-- | -- | Inspection (Insulation) (1) 09.01.2021 | ||
-- | -- | Inspection (Electric Service) (0) 09.01.2021 | ||
-- | -- | Inspection (Main Sewer Line) (0) 09.01.2021 | ||
-- | -- | Order Interior Doors & Trim (0) 09.01.2021 | ||
-- | -- | Drywall (Hang) (4) * 09.01.2021 | ||
-- | -- | Drywall (Tape, Block, Skim, Sand) (6) * 09.01.2021 | ||
-- | -- | Paint 1 (1) 09.01.2021 | ||
-- | -- | Garage Door (0) 09.01.2021 | ||
-- | -- | House Numbers (0) 09.01.2021 | ||
-- | -- | Cabinet Installation (2) * 09.01.2021 | ||
-- | -- | Granite Installation (1) * 09.01.2021 | ||
-- | -- | Interior Trim - Install (3) 09.01.2021 | ||
-- | -- | Luxury Vinyl Plank (3) * 09.01.2021 | ||
-- | -- | Luxury Vinyl Tile (0) 09.01.2021 | ||
-- | -- | Paint 2 (3) 09.01.2021 | ||
-- | -- | Cover Floors (1) 09.01.2021 | ||
-- | -- | Deliver Plumbing / Lighting Fixtures (0) 09.01.2021 | ||
-- | -- | Shoe Moulding (0) 09.01.2021 | ||
-- | -- | Shelving, Door Knobs, Fire Extinguisher (0) 09.01.2021 | ||
-- | -- | Install Coded Lockbox (add extra keys) (0) 09.01.2021 | ||
-- | -- | Pay Water / Sewer Taps (0) 09.01.2021 | ||
-- | -- | Set Water Meter (0) 09.01.2021 | ||
-- | -- | Electric Trim Out (3) 09.01.2021 | ||
-- | -- | HVAC Trim Out (1) 09.01.2021 | ||
-- | -- | Plumbing Trim Out (2) 09.01.2021 | ||
-- | -- | Install Appliances (0) * 09.01.2021 | ||
-- | -- | Paint 3 (2) * 09.01.2021 | ||
-- | -- | Carpet (2) 09.01.2021 | ||
-- | -- | Appraiser Confirms Construction Completion (0) 09.01.2021 | ||
-- | -- | Inspection (Final Building) (2) * 09.01.2021 | ||
-- | -- | Pre Walk Through (0) 09.01.2021 | ||
-- | -- | Cleaning (1) 09.01.2021 | ||
-- | -- | Certificate of Occupancy (1) * 09.01.2021 | ||
-- | -- | C.O. to Lender (0) 09.01.2021 | ||
-- | -- | Schedule Closing (0) 09.01.2021 | ||
-- | -- | Buyer Walk Through (1) 09.01.2021 | ||
-- | -- | Payment for Upgrades (0) 09.01.2021 | ||
-- | -- | Keys to Settlement Agent (0) 09.01.2021 | ||
-- | -- | Review Settlement Statement (0) 09.01.2021 | ||
-- | -- | Jerry Signs Closing Documents (0) 09.01.2021 | ||
-- | -- | Request Trash Tote From POA Manager (0) 09.01.2021 | ||
-- | -- | Closing (1) 09.01.2021 | ||
-- | -- | Remove Coded Lockbox (0) 09.01.2021 | ||