- 3  ::  1780 Heritage Estates Circle
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
Wed    May 21      Ratified Contract? (0)      
Wed    May 21      $2500 Deposit Received (0)      
Wed    May 21      Association Packet Requested (0)      
Wed    May 21      Association Packet Received (0)      
Wed    May 21      Selections Meeting (0)      
Wed    May 21      Selections Sheet Signed (0)      
Wed    May 21      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Wed    May 21      Deposit For Upgrades Received (0)      
Wed    May 21      Inspection (Concrete Wall) (1)      
Thu    May 22      Inspection (Conduit Under Slab) (1)      
Fri    May 23      Inspection (Drain Tile) (0)      
Fri    May 23      Settlement Agent Confirmed (0)      
Fri    May 23      Verify Window & Roof Structure (0)      
Fri    May 23      Patio (0)      
Fri    May 23      Rough In Microwave Vent (0)      
Fri    May 23      Inspection (Rough In Plumbing) (1)      
Mon    May 26      Inspection (Rough In Electric) (1)      
Tue    May 27      Inspection (Deck Piers) (0)      
Tue    May 27      Inspection (Framing) (1) *       
Wed    May 28      Exterior Stone (0)      
Wed    May 28      Set Electric Meter (0) *       
Wed    May 28      Inspection (Main Water Line) (0)      
Wed    May 28      Loan Approval (0)      
Wed    May 28      Deed Preparation (0)      
Wed    May 28      Mailbox (0)      
Wed    May 28      Order Plumbing / Lighting Fixtures (0)      
Wed    May 28      Interior Trim - Paint (1)      
Thu    May 29      Ceiling Fans (0)      
Thu    May 29      Blower Door Test (1)      
Fri    May 30      Inspection (Final HVAC) (1)      
Mon    Jun 2      Inspection (Final Plumbing) (1)      
Tue    Jun 3      Inspection (Final Electric) (1)      
Wed    Jun 4      Stain Hardwood Stairs (1)      
--   --   Replace Window Ready to replace 9/1/2021
--   --   Rick out of town Sept 28 - Oct 5
-- -- Building Permit (30)  09.01.2021    
-- -- Order Roof & Floor Trusses (1)  09.01.2021    
-- -- Order Windows & Doors (0)  09.01.2021    
-- -- Stake Out Home (1)  09.01.2021    
-- -- Excavate (2)  09.01.2021    
-- -- Inspection (Footers) (1)  09.01.2021    
-- -- Pour Footers (1) *   09.01.2021    
-- -- Set Forms (2)  09.01.2021    
-- -- Pour Foundation Walls (1)  09.01.2021    
-- -- Plumb Slab (2)  09.01.2021    
-- -- Inspection (Plumbing Under Slab) (1)  09.01.2021    
-- -- Prepare Slab (1)  09.01.2021    
-- -- Inspection (Slab) (1)  09.01.2021    
-- -- Pour Slab (1) *   09.01.2021    
-- -- Framing I (9)  09.01.2021    
-- -- Order Steps (0)  09.01.2021    
-- -- Order Tubs / Showers (0)  09.01.2021    
-- -- Framing II (8)  09.01.2021    
-- -- Framing III (8) *   09.01.2021    
-- -- Install Stairs (0)  09.01.2021    
-- -- Windows & Doors (0) *   09.01.2021    
-- -- House Number and Status in Window (0)  09.01.2021    
-- -- Roofing (0) *   09.01.2021    
-- -- Order Cabinets (0)  09.01.2021    
-- -- Order Appliances (0)  09.01.2021    
-- -- Deck (0)  09.01.2021    
-- -- Gutters (0)  09.01.2021    
-- -- Driveway (0) *   09.01.2021    
-- -- Privacy Divider / Fence (0)  09.01.2021    
-- -- Sod / Seed / Landscaping (0)  09.01.2021    
-- -- HVAC Rough In (4)  09.01.2021    
-- -- Inspection (Rough In HVAC) (1)  09.01.2021    
-- -- Plumbing Rough In (4)  09.01.2021    
-- -- Electric Rough In (4)  09.01.2021    
-- -- Exterior Vinyl (0) *   09.01.2021    
-- -- Insulation (2) *   09.01.2021    
-- -- Inspection (Insulation) (1)  09.01.2021    
-- -- Inspection (Electric Service) (0)  09.01.2021    
-- -- Inspection (Main Sewer Line) (0)  09.01.2021    
-- -- Order Interior Doors & Trim (0)  09.01.2021    
-- -- Drywall (Hang) (4) *   09.01.2021    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   09.01.2021    
-- -- Paint 1 (1)  09.01.2021    
-- -- Garage Door (0) *   09.01.2021    
-- -- House Numbers (0)  09.01.2021    
-- -- Cabinet Installation (2) *   09.01.2021    
-- -- Granite Installation (1) *   09.01.2021    
-- -- Interior Trim - Install (3) *   09.01.2021    
-- -- Luxury Vinyl Plank (3) *   09.01.2021    
-- -- Luxury Vinyl Tile (0)  09.01.2021    
-- -- Paint 2 (3)  09.01.2021    
-- -- Cover Floors (1)  09.01.2021    
-- -- Deliver Plumbing / Lighting Fixtures (0)  09.01.2021    
-- -- Shoe Moulding (0)  09.01.2021    
-- -- Shelving, Door Knobs, Fire Extinguisher (0) *   09.01.2021    
-- -- Install Coded Lockbox (add extra keys) (0)  09.01.2021    
-- -- Pay Water / Sewer Taps (0)  09.01.2021    
-- -- Set Water Meter (0) *   09.01.2021    
-- -- Electric Trim Out (3)  09.01.2021    
-- -- HVAC Trim Out (1)  09.01.2021    
-- -- Plumbing Trim Out (2)  09.01.2021    
-- -- Install Appliances (0) *   09.01.2021    
-- -- Paint 3 (2) *   09.01.2021    
-- -- Carpet (2)  09.01.2021    
-- -- Appraiser Confirms Construction Completion (0)  09.01.2021    
-- -- Inspection (Final Building) (2) *   09.01.2021    
-- -- Pre Walk Through (0)  09.01.2021    
-- -- Cleaning (1)  09.01.2021    
-- -- Certificate of Occupancy (1) *   09.01.2021    
-- -- C.O. to Lender (0)  09.01.2021    
-- -- Schedule Closing (0)  09.01.2021    
-- -- Buyer Walk Through (1)  09.01.2021    
-- -- Payment for Upgrades (0)  09.01.2021    
-- -- Keys to Settlement Agent (0)  09.01.2021    
-- -- Review Settlement Statement (0)  09.01.2021    
-- -- Jerry Signs Closing Documents (0)  09.01.2021    
-- -- Request Trash Tote From POA Manager (0)  09.01.2021    
-- -- Closing (1)  09.01.2021    
-- -- Remove Coded Lockbox (0)  09.01.2021