ADDR
- 27 :: 1714 Sherry Lane
CRITICAL PATH
|
INSPECTIONS
|
FLOOR PLANS
|
SELECTIONS
|
SPECS
|
CHANGES
|
NHS
view photo archive
--
--
Leaking basement when it rains
At water line entry
--
--
Gordon 518-369-2440
Wed
May 21
Ratified Contract?
(0)
Wed
May 21
$2500 Deposit Received
(0)
Wed
May 21
Association Packet Requested
(0)
Wed
May 21
Association Packet Received
(0)
Wed
May 21
Selections Meeting
(0)
Wed
May 21
Selections Sheet Signed
(0)
Wed
May 21
Amendment for Upgrades (B,S,L,T,BCP)
(0)
Wed
May 21
Deposit For Upgrades Received
(0)
Wed
May 21
Inspection (Concrete Wall)
(1)
Thu
May 22
Inspection (Conduit Under Slab)
(1)
Fri
May 23
Inspection (Drain Tile)
(0)
Fri
May 23
Settlement Agent Confirmed
(0)
Fri
May 23
Verify Window & Roof Structure
(0)
Fri
May 23
Order Appliances
(0)
Fri
May 23
Patio
(0)
Fri
May 23
Rough In Microwave Vent
(0)
Fri
May 23
Inspection (Rough In Plumbing)
(1)
Mon
May 26
Inspection (Rough In Electric)
(1)
Tue
May 27
Inspection (Deck Piers)
(0)
Tue
May 27
Inspection (Framing)
(1)
*
Wed
May 28
Exterior Stone
(0)
Wed
May 28
Set Electric Meter
(0)
*
Wed
May 28
Inspection (Main Water Line)
(0)
Wed
May 28
Loan Approval
(0)
Wed
May 28
Deed Preparation
(0)
Wed
May 28
Mailbox
(0)
Wed
May 28
Order Plumbing / Lighting Fixtures
(0)
Wed
May 28
Interior Trim - Paint
(1)
Thu
May 29
Ceiling Fans
(0)
Thu
May 29
Blower Door Test
(1)
Fri
May 30
Inspection (Final HVAC)
(1)
Mon
Jun 2
Inspection (Final Plumbing)
(1)
Tue
Jun 3
Inspection (Final Electric)
(1)
Wed
Jun 4
Stain Hardwood Stairs
(1)
Thu
Jun 5
Schedule Closing
(0)
Thu
Jun 5
Keys to Settlement Agent
(0)
Thu
Jun 5
Review Settlement Statement
(0)
Thu
Jun 5
Jerry Signs Closing Documents
(0)
Thu
Jun 5
Request Trash Tote From POA Manager
(0)
Thu
Jun 5
Remove Coded Lockbox
(0)
--
--
Building Permit
(30)
--
--
Order Roof & Floor Trusses
(1)
--
--
Order Windows & Doors
(0)
--
--
Stake Out Home
(1)
--
--
Excavate
(2)
--
--
Inspection (Footers)
(1)
--
--
Pour Footers
(1)
*
--
--
Set Forms
(2)
--
--
Pour Foundation Walls
(1)
--
--
Plumb Slab
(2)
--
--
Inspection (Plumbing Under Slab)
(1)
--
--
Prepare Slab
(1)
--
--
Inspection (Slab)
(1)
--
--
Pour Slab
(1)
*
--
--
Framing I
(9)
--
--
Order Steps
(0)
--
--
Order Tubs / Showers
(0)
--
--
Framing II
(8)
--
--
Framing III
(8)
*
--
--
Install Stairs
(0)
--
--
Windows & Doors
(0)
*
--
--
House Number and Status in Window
(0)
--
--
Roofing
(0)
*
--
--
Order Cabinets
(0)
--
--
Deck
(0)
--
--
Gutters
(0)
--
--
Driveway
(0)
*
--
--
Privacy Divider / Fence
(0)
--
--
Sod / Seed / Landscaping
(0)
--
--
HVAC Rough In
(4)
--
--
Inspection (Rough In HVAC)
(1)
--
--
Plumbing Rough In
(4)
--
--
Electric Rough In
(4)
--
--
Exterior Vinyl
(0)
*
--
--
Insulation
(2)
*
--
--
Inspection (Insulation)
(1)
--
--
Inspection (Electric Service)
(0)
--
--
Inspection (Main Sewer Line)
(0)
--
--
Order Interior Doors & Trim
(0)
--
--
Drywall (Hang)
(4)
*
--
--
Drywall (Tape, Block, Skim, Sand)
(6)
*
--
--
Paint 1
(1)
--
--
Garage Door
(0)
*
--
--
House Numbers
(0)
--
--
Cabinet Installation
(2)
*
--
--
Granite Installation
(1)
*
--
--
Interior Trim - Install
(3)
*
--
--
Luxury Vinyl Plank
(3)
*
--
--
Luxury Vinyl Tile
(0)
--
--
Paint 2
(3)
--
--
Cover Floors
(1)
--
--
Deliver Plumbing / Lighting Fixtures
(0)
--
--
Shoe Moulding
(0)
--
--
Shelving, Door Knobs, Fire Extinguisher
(0)
*
--
--
Install Coded Lockbox (add extra keys)
(0)
--
--
Pay Water / Sewer Taps
(0)
--
--
Set Water Meter
(0)
*
--
--
Electric Trim Out
(3)
--
--
HVAC Trim Out
(1)
--
--
Plumbing Trim Out
(2)
--
--
Install Appliances
(0)
*
--
--
Paint 3
(2)
*
--
--
Carpet
(2)
--
--
Appraiser Confirms Construction Completion
(0)
--
--
Inspection (Final Building)
(2)
*
--
--
Pre Walk Through
(0)
--
--
Cleaning
(1)
--
--
Certificate of Occupancy
(1)
*
--
--
C.O. to Lender
(0)
--
--
Buyer Walk Through
(1)
--
--
Payment for Upgrades
(0)
--
--
Closing
(1)