ADDR
- 22 :: 1732 Heritage Estates Circle
CRITICAL PATH
|
INSPECTIONS
|
FLOOR PLANS
|
SELECTIONS
|
SPECS
|
CHANGES
|
NHS
view photo archive
--
--
Leak above main floor window
easternmost window on south side of street
Wed
Nov 27
Ratified Contract?
(0)
Wed
Nov 27
$2500 Deposit Received
(0)
Wed
Nov 27
Association Packet Requested
(0)
Wed
Nov 27
Association Packet Received
(0)
Wed
Nov 27
Selections Meeting
(0)
Wed
Nov 27
Selections Sheet Signed
(0)
Wed
Nov 27
Amendment for Upgrades (B,S,L,T,BCP)
(0)
Wed
Nov 27
Deposit For Upgrades Received
(0)
Wed
Nov 27
Inspection (Concrete Wall)
(1)
Thu
Nov 28
Inspection (Conduit Under Slab)
(1)
Fri
Nov 29
Inspection (Drain Tile)
(0)
Fri
Nov 29
Settlement Agent Confirmed
(0)
Fri
Nov 29
Verify Window & Roof Structure
(0)
Fri
Nov 29
Order Appliances
(0)
Fri
Nov 29
Patio
(0)
Fri
Nov 29
Rough In Microwave Vent
(0)
Fri
Nov 29
Inspection (Rough In Plumbing)
(1)
Mon
Dec 2
Inspection (Rough In Electric)
(1)
Tue
Dec 3
Inspection (Deck Piers)
(0)
Tue
Dec 3
Inspection (Framing)
(1)
Wed
Dec 4
Exterior Stone
(0)
Wed
Dec 4
Set Electric Meter
(0)
Wed
Dec 4
Inspection (Main Water Line)
(0)
Wed
Dec 4
Loan Approval
(0)
Wed
Dec 4
Deed Preparation
(0)
Wed
Dec 4
Mailbox
(0)
Wed
Dec 4
Interior Trim - Paint
(1)
Thu
Dec 5
Ceiling Fans
(0)
Thu
Dec 5
Blower Door Test
(1)
Fri
Dec 6
Inspection (Final HVAC)
(1)
Mon
Dec 9
Inspection (Final Plumbing)
(1)
Tue
Dec 10
Inspection (Final Electric)
(1)
Wed
Dec 11
Stain Hardwood Stairs
(1)
Thu
Dec 12
Request Trash Tote From POA Manager
(0)
--
--
Building Permit
(30)
--
--
Order Roof & Floor Trusses
(1)
--
--
Order Windows & Doors
(0)
--
--
Stake Out Home
(1)
--
--
Excavate
(2)
--
--
Inspection (Footers)
(1)
--
--
Pour Footers
(1)
--
--
Set Forms
(2)
--
--
Pour Foundation Walls
(1)
--
--
Plumb Slab
(2)
--
--
Inspection (Plumbing Under Slab)
(1)
--
--
Prepare Slab
(1)
--
--
Inspection (Slab)
(1)
--
--
Pour Slab
(1)
*
--
--
Framing I
(9)
--
--
Order Steps
(0)
--
--
Order Tubs / Showers
(0)
--
--
Framing II
(8)
--
--
Framing III
(8)
*
--
--
Install Stairs
(0)
--
--
Windows & Doors
(0)
--
--
House Number and Status in Window
(0)
--
--
Roofing
(0)
--
--
Order Cabinets
(0)
--
--
Deck
(0)
--
--
Gutters
(0)
--
--
Driveway
(0)
--
--
Privacy Divider / Fence
(0)
--
--
Sod / Seed / Landscaping
(0)
--
--
HVAC Rough In
(4)
--
--
Inspection (Rough In HVAC)
(1)
--
--
Plumbing Rough In
(4)
--
--
Electric Rough In
(4)
--
--
Exterior Vinyl
(0)
*
--
--
Insulation
(2)
--
--
Inspection (Insulation)
(1)
--
--
Inspection (Electric Service)
(0)
--
--
Inspection (Main Sewer Line)
(0)
--
--
Order Interior Doors & Trim
(0)
--
--
Drywall (Hang)
(4)
*
--
--
Drywall (Tape, Block, Skim, Sand)
(6)
*
--
--
Paint 1
(1)
--
--
Garage Door
(0)
--
--
House Numbers
(0)
--
--
Cabinet Installation
(2)
*
--
--
Granite Installation
(1)
*
--
--
Interior Trim - Install
(3)
--
--
Order Plumbing / Lighting Fixtures
(0)
--
--
Luxury Vinyl Plank
(3)
*
--
--
Luxury Vinyl Tile
(0)
--
--
Paint 2
(3)
--
--
Cover Floors
(1)
--
--
Deliver Plumbing / Lighting Fixtures
(0)
--
--
Shoe Moulding
(0)
--
--
Shelving, Door Knobs, Fire Extinguisher
(0)
--
--
Install Coded Lockbox (add extra keys)
(0)
--
--
Pay Water / Sewer Taps
(0)
--
--
Set Water Meter
(0)
--
--
Electric Trim Out
(3)
--
--
HVAC Trim Out
(1)
--
--
Plumbing Trim Out
(2)
--
--
Install Appliances
(0)
*
--
--
Paint 3
(2)
*
--
--
Carpet
(2)
--
--
Appraiser Confirms Construction Completion
(0)
--
--
Inspection (Final Building)
(2)
*
--
--
Pre Walk Through
(0)
--
--
Cleaning
(1)
--
--
Certificate of Occupancy
(1)
*
--
--
C.O. to Lender
(0)
--
--
Schedule Closing
(0)
--
--
Buyer Walk Through
(1)
--
--
Payment for Upgrades
(0)
--
--
Keys to Settlement Agent
(0)
--
--
Review Settlement Statement
(0)
--
--
Jerry Signs Closing Documents
(0)
--
--
Closing
(1)
--
--
Remove Coded Lockbox
(0)