Marianne 540-383-9872 |
|
|
Wed |
Nov 27 |
Ratified Contract? (0) |
|
|
Wed |
Nov 27 |
$2500 Deposit Received (0) |
|
|
Wed |
Nov 27 |
Association Packet Requested (0) |
|
|
Wed |
Nov 27 |
Association Packet Received (0) |
|
|
Wed |
Nov 27 |
Selections Meeting (0) |
|
|
Wed |
Nov 27 |
Selections Sheet Signed (0) |
|
|
Wed |
Nov 27 |
Amendment for Upgrades (B,S,L,T,BCP) (0) |
|
|
Wed |
Nov 27 |
Deposit For Upgrades Received (0) |
|
|
Wed |
Nov 27 |
Building Permit (30) |
|
|
Wed |
Jan 8 |
Inspection (Concrete Wall) (1) |
|
|
Thu |
Jan 9 |
Inspection (Conduit Under Slab) (1) |
|
|
Fri |
Jan 10 |
Inspection (Drain Tile) (0) |
|
|
Fri |
Jan 10 |
Settlement Agent Confirmed (0) |
|
|
Fri |
Jan 10 |
Verify Window & Roof Structure (0) |
|
|
Fri |
Jan 10 |
Patio (0) |
|
|
Fri |
Jan 10 |
Rough In Microwave Vent (0) |
|
|
Fri |
Jan 10 |
Inspection (Rough In Plumbing) (1) |
|
|
Mon |
Jan 13 |
Inspection (Rough In Electric) (1) |
|
|
Tue |
Jan 14 |
Inspection (Deck Piers) (0) |
|
|
Tue |
Jan 14 |
Inspection (Framing) (1) |
|
|
Wed |
Jan 15 |
Exterior Stone (0) |
|
|
Wed |
Jan 15 |
Set Electric Meter (0) |
|
|
Wed |
Jan 15 |
Inspection (Main Water Line) (0) |
|
|
Wed |
Jan 15 |
Loan Approval (0) |
|
|
Wed |
Jan 15 |
Deed Preparation (0) |
|
|
Wed |
Jan 15 |
Mailbox (0) |
|
|
Wed |
Jan 15 |
Interior Trim - Paint (1) |
|
|
Thu |
Jan 16 |
Ceiling Fans (0) |
|
|
Thu |
Jan 16 |
Blower Door Test (1) |
|
|
Fri |
Jan 17 |
Inspection (Final HVAC) (1) |
|
|
Mon |
Jan 20 |
Inspection (Final Plumbing) (1) |
|
|
Tue |
Jan 21 |
Inspection (Final Electric) (1) |
|
|
Wed |
Jan 22 |
Stain Hardwood Stairs (1) |
|
|
Thu |
Jan 23 |
Request Trash Tote From POA Manager (0) |
|
|
|
-- |
-- |
Check notes |
|
|
-- |
-- |
Electrical notes- |
, Dimmer switch on dining light, |
|
-- |
-- |
Electrical notes |
Porch fan and light- living room two elevated receptacles |
|
-- |
-- |
Electrical notes- two exterior lights on deck, |
|
|
-- |
-- |
Make sure fireplace has blower |
|
|
-- |
-- |
Electrical notes |
Outlet over fireplace, ceiling fan centered with 8 snaps on either side |
|
-- |
-- |
Electrical notes |
Two exterior lights on deck, electrical behind every toilet |
|
-- |
-- |
Electrical notes |
Office- 4 snaps switched 2/2, Those basement bedrooms with switched receptacle |
|
-- |
-- |
Want good wall cap for half wall going down steps |
|
|
-- |
-- |
Wal through notes |
Blower on fireplace, added ceiling fans in both down bedrooms, and ceiling fan kit in basement LR |
|
-- |
-- |
Electrical notes |
4 snaps in basement FR balanced with fan, and four more on other side of drop ceiling |
|
-- |
-- |
Walk through notes |
Basement bath cubby with wood shelves to be painted white |
|
-- |
-- |
Walk through notes- Door swing change into linen closet in basement bathroom |
|
|
-- |
-- |
rough-in venting radon to roof-cost? |
|
|
-- |
-- |
Pull down |
|
|
-- |
-- |
Pull down stairs in garage |
In process 6/17 |
|
-- |
-- |
Rough in vent to attic/roof |
|
|
-- |
-- |
Laundry room pocket door 6/14 |
|
|
-- |
-- |
Pedestal sink 6/14 |
|
|
-- |
-- |
Two speaker framed out drywall boxes- header height and 16 inches tall |
Note taped inside for harry. |
|
-- |
-- |
PAINT COLOR- BM color filtered sunshine- 2154-60, FRONT DOOR COLOR BM color HC- 182 Classic Burgundy |
Monday, October 5 |
|
-- |
-- |
STUCCO COLOR- Moonlit sand 10611. BRICK SURROUND ALL WINDOWS AND DOORS- Portsmouth brick |
|
|
-- |
-- |
Cover steps |
|
|
-- |
-- |
Outlet over fireplace 7/3 |
wires there. Harry just need to cut it out 9/17 |
|
-- |
-- |
Gas tank for fireplace and backup for furnace |
Monday, Sept 14-hole dug 9/13 |
|
-- |
-- |
(gas backup on furnace) |
|
|
-- |
-- |
Must be in home by end of September!!! |
|
|
-- |
-- |
Two missing half round windows |
Thu, Aug 27? |
|
-- |
-- |
|
|
|
-- |
-- |
Kitchen window needed 7/25 |
|
|
-- |
-- |
Richmond Mantle with black slate surround |
set to be installed Monday 10/5 GWB |
|
-- |
-- |
Kitchen island does not exactly match plans online 8/23 |
|
|
-- |
-- |
Interior trim needed in basement 8/23 |
|
|
-- |
-- |
waiting on back splash decision |
|
|
-- |
-- |
Raise kitchen window |
|
|
-- |
-- |
Cost for concrete? |
To be discussed at OPS |
|
-- |
-- |
NEED electrical upgrade list from Harry |
Greg to follow up |
|
-- |
-- |
who is installing buyer provided shower door- |
CJ to install 9/28 with appliances |
|
-- |
-- |
Check for D, E, F, G (court) Kitchen accessories 8/29 |
F,G 9/2 |
|
-- |
-- |
Trim on MB window |
Galindez to take care of it during final paint GWB |
|
-- |
-- |
Bathroom cabinets-right before ceramics installed 9/9 |
|
|
-- |
-- |
Painted wood shelves for basement linen closet |
Tom to tell trim guy |
|
-- |
-- |
Access panel under stairs for whirlpool |
|
|
-- |
-- |
Add light in attic space above garage |
|
|
-- |
-- |
Motion lights for laundry. Buyer provides??? |
|
|
-- |
-- |
|
|
|
-- |
-- |
Trim out a few windows |
|
|
-- |
-- |
Harry to finish trim out Thursday |
|
|
-- |
-- |
Sink in basement bar needs to be attached |
Tom will ask owners about missing clips |
|
-- |
-- |
Left nook shelf uneven |
|
|
-- |
-- |
Left nook shelf uneven |
|
|
-- |
-- |
Floor transition strip-sauna room to family room 9/23 |
Few missing throughout house |
|
-- |
-- |
Short on ceramic in shower in basement bath 9/23 |
On site 10/7 |
|
-- |
-- |
Trim needed basement door 9/27 |
Isaac |
|
-- |
-- |
Drain for water heater |
Hawkeye is working on it now. 10/1 GWB |
|
-- |
-- |
CODED LOCKBOX 1717 |
|
|
-- |
-- |
Dimmable light bulbs needed 9/30 |
Emailed Greg size :) |
|
-- |
-- |
Stain steps |
Needs poly 10/7 |
|
-- |
-- |
Paint attic cover |
Galindez to finish 10/5 |
|
-- |
-- |
|
|
|
-- |
-- |
Few HVAC covers missing & thermostat |
|
|
-- |
-- |
Paint touch up needed throughout |
Galindez to finish 10/5-needs touch up throughout 10/7 |
|
-- |
-- |
Electric trim out still in process 10/3 |
|
|
-- |
-- |
Discoloration in shower 10/7 |
Greg will follow up with Joe |
|
-- |
-- |
Pantry-shelving? Drywall sanding? |
Kate checking |
|
-- |
-- |
Trim around bar |
Greg will talk to Classic |
|
-- |
-- |
Water filter hookup |
|
|
-- |
-- |
Cracked master sink |
Repair |
|
-- |
-- |
Fix small kitchen cabinet |
Russell |
|
-- |
-- |
Sand and Paint trim on Kitchen window |
Galindez GWB |
|
-- |
-- |
Paint touch up in basement bath around light switch |
Galindez GWB |
|
-- |
-- |
Get pilot light started for fireplace |
Carlos to call Marianne 9/18 GWB |
|
-- |
-- |
Living room ceiling fan/light not working |
Spoke with Harry - Its a fan/remote issue not an electrical problem |
|
-- |
-- |
Missing trim on living room side door |
Galindez GWB |
|
-- |
-- |
Wash fixed frame windows |
JB |
|
-- |
-- |
Caulk/seal around furnace vent |
JB |
|
-- |
-- |
Basement door not keyed to front door |
Ron |
|
-- |
-- |
Repair sink in master bath |
Kevin Burton to repair week of 10/18 |
|
-- |
-- |
Credit for extra faucet? |
this shouldn t matter as they were never charged? GWB |
|
-- |
-- |
Mailbox numbers |
JB |
|
-- |
-- |
Appraisal and building spec for insurance |
|
|
-- |
-- |
Touch up kit for cabinets |
Tom will drop off |
|
-- |
-- |
Repair cracked sink |
or order new one? (Kate to contact Kara Marshall) |
|
-- |
-- |
Repair or replace ceiling fan |
Fanamation (Kate to send model number to Jerry, Kara) |
|
-- |
-- |
Order Roof & Floor Trusses (1) |
|
|
-- |
-- |
Order Windows & Doors (0) |
|
|
-- |
-- |
Stake Out Home (1) |
|
|
-- |
-- |
Excavate (2) |
Started 2/26 |
|
-- |
-- |
Inspection (Footers) (1) |
|
|
-- |
-- |
Pour Footers (1) |
|
|
-- |
-- |
Set Forms (2) |
|
|
-- |
-- |
Pour Foundation Walls (1) |
|
|
-- |
-- |
Plumb Slab (2) |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) |
|
|
-- |
-- |
Prepare Slab (1) |
|
|
-- |
-- |
Inspection (Slab) (1) |
|
|
-- |
-- |
Pour Slab (1) * |
|
|
-- |
-- |
Framing I (9) |
In process 4/29 |
|
-- |
-- |
Order Steps (0) |
|
|
-- |
-- |
Order Tubs / Showers (0) |
|
|
-- |
-- |
Framing II (8) |
In process 5/9 |
|
-- |
-- |
Framing III (8) * |
|
|
-- |
-- |
Install Stairs (0) |
|
|
-- |
-- |
Windows & Doors (0) |
remainder arriving 6/17 |
|
-- |
-- |
House Number and Status in Window (0) |
|
|
-- |
-- |
Roofing (0) |
|
|
-- |
-- |
Order Cabinets (0) |
|
|
-- |
-- |
Order Appliances (0) |
|
|
-- |
-- |
Deck (0) |
Band board on outside of deck (we have the material now) |
|
-- |
-- |
Gutters (0) |
Mon, Oct 5 |
|
-- |
-- |
Driveway (0) |
Patio needs poured 9/27 |
|
-- |
-- |
Privacy Divider / Fence (0) |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) |
|
|
-- |
-- |
HVAC Rough In (4) |
in process 7/4 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) |
Just need mechanical and framing |
|
-- |
-- |
Plumbing Rough In (4) |
In process 6/17 |
|
-- |
-- |
Electric Rough In (4) |
Harry has notes of changes |
|
-- |
-- |
Exterior Vinyl (0) * |
In process 9/16 |
|
-- |
-- |
Insulation (2) |
Week of July 13 |
|
-- |
-- |
Inspection (Insulation) (1) |
July 23 |
|
-- |
-- |
Inspection (Electric Service) (0) |
Should happen 9/17 |
|
-- |
-- |
Inspection (Main Sewer Line) (0) |
Paid should be set this week 9/16 GWB |
|
-- |
-- |
Order Interior Doors & Trim (0) |
On site 8/19 |
|
-- |
-- |
Drywall (Hang) (4) * |
In process 8/1 |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * |
Just needs sanding 8/12 |
|
-- |
-- |
Paint 1 (1) |
Starting today 8/17 GWB |
|
-- |
-- |
Garage Door (0) |
Door getting installed 8/18 GWB |
|
-- |
-- |
House Numbers (0) |
|
|
-- |
-- |
Cabinet Installation (2) * |
|
|
-- |
-- |
Granite Installation (1) * |
Sept 7-ish |
|
-- |
-- |
Interior Trim - Install (3) |
Galindez will finish 8/31 GWB-in process |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * |
|
|
-- |
-- |
Luxury Vinyl Tile (0) |
In process 9/19-tile needs grout/shower in process |
|
-- |
-- |
Paint 2 (3) |
Galindez to start 9/2 |
|
-- |
-- |
Cover Floors (1) |
Basement covered 9/19-up is not 9/27 |
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) |
Set to deliver plumbing 8/26 GWB Owner providing lighting -pedestals and toilets on site 8/26 |
|
-- |
-- |
Shoe Moulding (0) |
On site 9/7 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) |
|
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) |
Monday, September 14 |
|
-- |
-- |
Set Water Meter (0) |
|
|
-- |
-- |
Electric Trim Out (3) |
In process 9/30 |
|
-- |
-- |
HVAC Trim Out (1) |
Furnace arrives Monday, install thereafter-started 10/3 |
|
-- |
-- |
Plumbing Trim Out (2) |
In process 9/19 |
|
-- |
-- |
Install Appliances (0) * |
Installed 9/29 |
|
-- |
-- |
Paint 3 (2) * |
in process 9/30 |
|
-- |
-- |
Carpet (2) |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) |
|
|
-- |
-- |
Inspection (Final Building) (2) * |
Monday, October 12 |
|
-- |
-- |
Pre Walk Through (0) |
Monday 9/21 and Monday 9/28 GWB |
|
-- |
-- |
Cleaning (1) |
|
|
-- |
-- |
Certificate of Occupancy (1) * |
|
|
-- |
-- |
C.O. to Lender (0) |
|
|
-- |
-- |
Schedule Closing (0) |
|
|
-- |
-- |
Buyer Walk Through (1) |
|
|
-- |
-- |
Payment for Upgrades (0) |
$56,459 |
|
-- |
-- |
Keys to Settlement Agent (0) |
|
|
-- |
-- |
Review Settlement Statement (0) |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) |
|
|
-- |
-- |
Closing (1) |
|
|
-- |
-- |
Remove Coded Lockbox (0) |
|
|