3 32 16 14 15 39 1 24 5 30 29 17 10 40 4 27 7 22 ADDR
- 1  ::  1790 Heritage Estates Circle
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
--   --   Refrigerator door replacement After Closing
Mon    Dec 15      Ratified Contract? (0)      
Mon    Dec 15      $2500 Deposit Received (0)      
Mon    Dec 15      Association Packet Requested (0)      
Mon    Dec 15      Association Packet Received (0)      
Mon    Dec 15      Selections Meeting (0)      
Mon    Dec 15      Selections Sheet Signed (0)      
Mon    Dec 15      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Mon    Dec 15      Deposit For Upgrades Received (0)      
Mon    Dec 15      Inspection (Concrete Wall) (1)      
Tue    Dec 16      Inspection (Conduit Under Slab) (1)      
Wed    Dec 17      Inspection (Drain Tile) (0)      
Wed    Dec 17      Settlement Agent Confirmed (0)      
Wed    Dec 17      Order Tubs / Showers (0)      
Wed    Dec 17      Verify Window & Roof Structure (0)      
Wed    Dec 17      Install Stairs (0) *       
Wed    Dec 17      House Number and Status in Window (0)      
Wed    Dec 17      Order Appliances (0)      
Wed    Dec 17      Patio (0)      
Wed    Dec 17      Rough In Microwave Vent (0)      
Wed    Dec 17      Inspection (Rough In Plumbing) (1)      
Thu    Dec 18      Inspection (Rough In Electric) (1)      
Fri    Dec 19      Inspection (Framing) (1) *       
Mon    Dec 22      Inspection (Deck Piers) (0)      
Mon    Dec 22      Exterior Stone (0)      
Mon    Dec 22      Set Electric Meter (0) *       
Mon    Dec 22      Inspection (Main Water Line) (0)      
Mon    Dec 22      Loan Approval (0)      
Mon    Dec 22      Deed Preparation (0)      
Mon    Dec 22      Garage Door (0)      
Mon    Dec 22      Mailbox (0)      
Mon    Dec 22      Order Plumbing / Lighting Fixtures (0)      
Mon    Dec 22      Interior Trim - Paint (1)      
Tue    Dec 23      Cover Floors (1)      
Wed    Dec 24      Deliver Plumbing / Lighting Fixtures (0)      
Wed    Dec 24      Shoe Moulding (0)      
Wed    Dec 24      Set Water Meter (0) *       
Wed    Dec 24      Ceiling Fans (0)      
Wed    Dec 24      Blower Door Test (1)      
Thu    Dec 25      Paint 3 (2) *       
Mon    Dec 29      Appraiser Confirms Construction Completion (0)      
Mon    Dec 29      Inspection (Final HVAC) (1)      
Tue    Dec 30      Inspection (Final Plumbing) (1)      
Wed    Dec 31      Inspection (Final Electric) (1)      
Thu    Jan 1      Stain Hardwood Stairs (1) *       
Fri    Jan 2      C.O. to Lender (0)      
Fri    Jan 2      Schedule Closing (0)      
Fri    Jan 2      Payment for Upgrades (0)      
Fri    Jan 2      Keys to Settlement Agent (0)      
Fri    Jan 2      Review Settlement Statement (0)      
Fri    Jan 2      Jerry Signs Closing Documents (0)      
Fri    Jan 2      Request Trash Tote From POA Manager (0)      
Fri    Jan 2      Remove Coded Lockbox (0)      
--   --   Replace front of freezer (ding) Kate to call back service center with serial number
--   --   Resolve basement shower issue
--   --   When will we install ceramic back splash buyer would like to be present Needs thinset
--   --   Butler's pantry Del Jan 23, Install Jan 24-26
--   --   Basement vanity Timing TBD
--   --   Light fixture outside sliding door on main level
--   --   Install shower door After Closing
--   --   Remove granite backsplash
--   --   Install ceramic tile backsplash February 3rd
--   --   Install cedar siding in closet Tom to call- Mitch install Saturday
--   --   Touch up ceiling paint very splotchy Thursday, Feb 16
--   --   Downstairs Shower? 1/26 late in day
--   --   Vinyl Tues, Feb 7
--   --   Backing in shower- tom to install grab bar, or Ron? Brushed nickel- get Ron to do
--   --   Hardwood flooring issues upstairs
--   --   Remove master closet shelving
--   --   Install hardware on screen door JB
--   --   Keypad at garage door Greg
--   --   Install pull down stairs in garage
--   --   Install light above butler's pantry
--   --   Install missing under cabinet light under cabinet to left of refrigerator
--   --   Under cabinet light in Butler cabinet
--   --   TOM- PLEASE COVER RANGE TO PROTECT FROM TILE BACK SPLASH
--   --   Install grab bar (VA Installation) Ron
--   --   Mitch change out bathroom doors 2'6- put up oak handrail Change order fees.
--   --   Ceramic back splash
--   --   Fireplace in basement?
--   --   Anchor bolt in storage room wall JB
--   --   Thresholds at carpet- bedroom and office
--   --   LED lights purchased by Tom
--   --   Adding snap light over ceiling Added recently
--   --   LED lights in master bathroom?
--   --   Install and stain oak handrail Stained, just install
--   --   Install keypad for garage door Greg
--   --   Cleaning Cheryl
--   --   Basement tub repair Friday, Feb 17
--   --   Stone and caulk repairs Friday, Feb 17
--   --   Mailbox repair Thursday, Feb 16
--   --   Replace kitchen cabinet fronts
--   --   Replace damaged kitchen cabinet fronts
--   --   HVAC cleaning TBD game plan
--   --   Air handler cleaning
-- -- Building Permit (30) *       
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1) *       
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *       
-- -- Framing I (9)      
-- -- Order Steps (0)      
-- -- Framing II (8)      
-- -- Framing III (8) *        Materials have been ordered;
-- -- Windows & Doors (0) *       
-- -- Roofing (0) *       
-- -- Order Cabinets (0)      
-- -- Deck (0)      
-- -- Gutters (0)      
-- -- Driveway (0) *       
-- -- Privacy Divider / Fence (0) *       
-- -- Sod / Seed / Landscaping (0)      
-- -- HVAC Rough In (4)      
-- -- Plumbing Rough In (4)      
-- -- Electric Rough In (4)      
-- -- Inspection (Rough In HVAC) (1)       Tuesday morning 1/17
-- -- Exterior Vinyl (0) *       
-- -- Insulation (2) *       
-- -- Inspection (Insulation) (1)       Tuesday morning 1/17
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4) *        Tuesday afternoon 1/17
-- -- Drywall (Tape, Block, Skim, Sand) (6) *        In process- complete by Monday afternoon the 23rd
-- -- Paint 1 (1)       Tuesday 1/24
-- -- House Numbers (0)      
-- -- Cabinet Installation (2) *        Del- Wed 2/1; Install Thursday the 2nd; Granite install 2/6
-- -- Granite Installation (1) *       
-- -- Interior Trim - Install (3) *        Mitch, Wed 1/25- through Friday 1/27
-- -- Luxury Vinyl Plank (3) *       
-- -- Luxury Vinyl Tile (0)      
-- -- Paint 2 (3)       Saturday 28th and Sunday 29th
-- -- Shelving, Door Knobs, Fire Extinguisher (0) *        Needs to be finished
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Electric Trim Out (3) *        Now
-- -- HVAC Trim Out (1) *       
-- -- Plumbing Trim Out (2) *       
-- -- Install Appliances (0) *       
-- -- Carpet (2)       Carpet and Vinyl- Friday the 3rd
-- -- Inspection (Final Building) (2) *        Tues, Feb 7
-- -- Pre Walk Through (0)       Tuesday 2/7
-- -- Cleaning (1)       Wed, Feb 8 - start upstairs
-- -- Certificate of Occupancy (1) *       
-- -- Buyer Walk Through (1) *       
-- -- Closing (1)