- 1  ::  1790 Heritage Estates Circle
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
--   --   Refrigerator door replacement After Closing
Wed    Nov 27      Ratified Contract? (0)      
Wed    Nov 27      $2500 Deposit Received (0)      
Wed    Nov 27      Association Packet Requested (0)      
Wed    Nov 27      Association Packet Received (0)      
Wed    Nov 27      Selections Meeting (0)      
Wed    Nov 27      Selections Sheet Signed (0)      
Wed    Nov 27      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Wed    Nov 27      Deposit For Upgrades Received (0)      
Wed    Nov 27      Inspection (Concrete Wall) (1)      
Thu    Nov 28      Inspection (Conduit Under Slab) (1)      
Fri    Nov 29      Inspection (Drain Tile) (0)      
Fri    Nov 29      Settlement Agent Confirmed (0)      
Fri    Nov 29      Order Tubs / Showers (0)      
Fri    Nov 29      Verify Window & Roof Structure (0)      
Fri    Nov 29      Install Stairs (0)      
Fri    Nov 29      House Number and Status in Window (0)      
Fri    Nov 29      Order Appliances (0)      
Fri    Nov 29      Patio (0)      
Fri    Nov 29      Rough In Microwave Vent (0)      
Fri    Nov 29      Inspection (Rough In Plumbing) (1)      
Mon    Dec 2      Inspection (Rough In Electric) (1)      
Tue    Dec 3      Inspection (Deck Piers) (0)      
Tue    Dec 3      Inspection (Framing) (1)      
Wed    Dec 4      Exterior Stone (0)      
Wed    Dec 4      Set Electric Meter (0)      
Wed    Dec 4      Inspection (Main Water Line) (0)      
Wed    Dec 4      Loan Approval (0)      
Wed    Dec 4      Deed Preparation (0)      
Wed    Dec 4      Garage Door (0)      
Wed    Dec 4      Mailbox (0)      
Wed    Dec 4      Order Plumbing / Lighting Fixtures (0)      
Wed    Dec 4      Interior Trim - Paint (1)      
Thu    Dec 5      Cover Floors (1)      
Fri    Dec 6      Deliver Plumbing / Lighting Fixtures (0)      
Fri    Dec 6      Shoe Moulding (0)      
Fri    Dec 6      Set Water Meter (0)      
Fri    Dec 6      Ceiling Fans (0)      
Fri    Dec 6      Blower Door Test (1)      
Mon    Dec 9      Paint 3 (2) *       
Wed    Dec 11      Appraiser Confirms Construction Completion (0)      
Wed    Dec 11      Inspection (Final HVAC) (1)      
Thu    Dec 12      Inspection (Final Plumbing) (1)      
Fri    Dec 13      Inspection (Final Electric) (1)      
Mon    Dec 16      Stain Hardwood Stairs (1)      
Tue    Dec 17      C.O. to Lender (0)      
Tue    Dec 17      Schedule Closing (0)      
Tue    Dec 17      Payment for Upgrades (0)      
Tue    Dec 17      Keys to Settlement Agent (0)      
Tue    Dec 17      Review Settlement Statement (0)      
Tue    Dec 17      Jerry Signs Closing Documents (0)      
Tue    Dec 17      Request Trash Tote From POA Manager (0)      
Tue    Dec 17      Remove Coded Lockbox (0)      
--   --   Replace front of freezer (ding) Kate to call back service center with serial number
--   --   Resolve basement shower issue
--   --   When will we install ceramic back splash buyer would like to be present Needs thinset
--   --   Butler's pantry Del Jan 23, Install Jan 24-26
--   --   Basement vanity Timing TBD
--   --   Light fixture outside sliding door on main level
--   --   Install shower door After Closing
--   --   Remove granite backsplash
--   --   Install ceramic tile backsplash February 3rd
--   --   Install cedar siding in closet Tom to call- Mitch install Saturday
--   --   Touch up ceiling paint very splotchy Thursday, Feb 16
--   --   Downstairs Shower? 1/26 late in day
--   --   Vinyl Tues, Feb 7
--   --   Backing in shower- tom to install grab bar, or Ron? Brushed nickel- get Ron to do
--   --   Hardwood flooring issues upstairs
--   --   Remove master closet shelving
--   --   Install hardware on screen door JB
--   --   Keypad at garage door Greg
--   --   Install pull down stairs in garage
--   --   Install light above butler's pantry
--   --   Install missing under cabinet light under cabinet to left of refrigerator
--   --   Under cabinet light in Butler cabinet
--   --   TOM- PLEASE COVER RANGE TO PROTECT FROM TILE BACK SPLASH
--   --   Install grab bar (VA Installation) Ron
--   --   Mitch change out bathroom doors 2'6- put up oak handrail Change order fees.
--   --   Ceramic back splash
--   --   Fireplace in basement?
--   --   Anchor bolt in storage room wall JB
--   --   Thresholds at carpet- bedroom and office
--   --   LED lights purchased by Tom
--   --   Adding snap light over ceiling Added recently
--   --   LED lights in master bathroom?
--   --   Install and stain oak handrail Stained, just install
--   --   Install keypad for garage door Greg
--   --   Cleaning Cheryl
--   --   Basement tub repair Friday, Feb 17
--   --   Stone and caulk repairs Friday, Feb 17
--   --   Mailbox repair Thursday, Feb 16
--   --   Replace kitchen cabinet fronts
--   --   Replace damaged kitchen cabinet fronts
--   --   HVAC cleaning TBD game plan
--   --   Air handler cleaning
-- -- Building Permit (30)      
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1)      
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *       
-- -- Framing I (9)      
-- -- Order Steps (0)      
-- -- Framing II (8)      
-- -- Framing III (8) *        Materials have been ordered;
-- -- Windows & Doors (0)      
-- -- Roofing (0)      
-- -- Order Cabinets (0)      
-- -- Deck (0)      
-- -- Gutters (0)      
-- -- Driveway (0)      
-- -- Privacy Divider / Fence (0)      
-- -- Sod / Seed / Landscaping (0)      
-- -- HVAC Rough In (4)      
-- -- Inspection (Rough In HVAC) (1)       Tuesday morning 1/17
-- -- Plumbing Rough In (4)      
-- -- Electric Rough In (4)      
-- -- Exterior Vinyl (0) *       
-- -- Insulation (2)      
-- -- Inspection (Insulation) (1)       Tuesday morning 1/17
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4) *        Tuesday afternoon 1/17
-- -- Drywall (Tape, Block, Skim, Sand) (6) *        In process- complete by Monday afternoon the 23rd
-- -- Paint 1 (1)       Tuesday 1/24
-- -- House Numbers (0)      
-- -- Cabinet Installation (2) *        Del- Wed 2/1; Install Thursday the 2nd; Granite install 2/6
-- -- Granite Installation (1) *       
-- -- Interior Trim - Install (3)       Mitch, Wed 1/25- through Friday 1/27
-- -- Luxury Vinyl Plank (3) *       
-- -- Luxury Vinyl Tile (0)      
-- -- Paint 2 (3)       Saturday 28th and Sunday 29th
-- -- Shelving, Door Knobs, Fire Extinguisher (0)       Needs to be finished
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Electric Trim Out (3)       Now
-- -- HVAC Trim Out (1)      
-- -- Plumbing Trim Out (2)      
-- -- Install Appliances (0) *       
-- -- Carpet (2)       Carpet and Vinyl- Friday the 3rd
-- -- Inspection (Final Building) (2) *        Tues, Feb 7
-- -- Pre Walk Through (0)       Tuesday 2/7
-- -- Cleaning (1)       Wed, Feb 8 - start upstairs
-- -- Certificate of Occupancy (1) *       
-- -- Buyer Walk Through (1)      
-- -- Closing (1)