Wed |
Nov 27 |
Ratified Contract? (0) |
|
|
Wed |
Nov 27 |
$2500 Deposit Received (0) |
|
|
Wed |
Nov 27 |
Association Packet Requested (0) |
|
|
Wed |
Nov 27 |
Association Packet Received (0) |
|
|
Wed |
Nov 27 |
Selections Meeting (0) |
|
|
Wed |
Nov 27 |
Selections Sheet Signed (0) |
|
|
Wed |
Nov 27 |
Amendment for Upgrades (B,S,L,T,BCP) (0) |
|
|
Wed |
Nov 27 |
Deposit For Upgrades Received (0) |
|
|
Wed |
Nov 27 |
Inspection (Concrete Wall) (1) |
|
|
Thu |
Nov 28 |
Inspection (Conduit Under Slab) (1) |
|
|
Fri |
Nov 29 |
Inspection (Drain Tile) (0) |
|
|
Fri |
Nov 29 |
Settlement Agent Confirmed (0) |
|
|
Fri |
Nov 29 |
Verify Window & Roof Structure (0) |
|
|
Fri |
Nov 29 |
Patio (0) |
|
|
Fri |
Nov 29 |
Rough In Microwave Vent (0) |
|
|
Fri |
Nov 29 |
Inspection (Rough In Plumbing) (1) |
|
|
Mon |
Dec 2 |
Inspection (Rough In Electric) (1) |
|
|
Tue |
Dec 3 |
Inspection (Deck Piers) (0) |
|
|
Tue |
Dec 3 |
Inspection (Framing) (1) |
|
|
Wed |
Dec 4 |
Exterior Stone (0) |
|
|
Wed |
Dec 4 |
Set Electric Meter (0) |
|
|
Wed |
Dec 4 |
Inspection (Main Water Line) (0) |
|
|
Wed |
Dec 4 |
Loan Approval (0) |
|
|
Wed |
Dec 4 |
Deed Preparation (0) |
|
|
Wed |
Dec 4 |
Mailbox (0) |
|
|
Wed |
Dec 4 |
Interior Trim - Paint (1) |
|
|
Thu |
Dec 5 |
Ceiling Fans (0) |
|
|
Thu |
Dec 5 |
Blower Door Test (1) |
|
|
Fri |
Dec 6 |
Inspection (Final HVAC) (1) |
|
|
Mon |
Dec 9 |
Inspection (Final Plumbing) (1) |
|
|
Tue |
Dec 10 |
Inspection (Final Electric) (1) |
|
|
Wed |
Dec 11 |
Stain Hardwood Stairs (1) |
|
|
Thu |
Dec 12 |
Request Trash Tote From POA Manager (0) |
|
|
|
-- |
-- |
Waiting on a plat to submit with plans |
|
|
-- |
-- |
Verizon line to be moved |
|
|
-- |
-- |
Awning window in shop area |
|
|
-- |
-- |
Do Not Seal Garage Floor |
|
|
-- |
-- |
Buyer to paint garage floor |
Confusion here with the buyer. Garage floor has been covered |
|
-- |
-- |
Seal Garage Floor? |
|
|
-- |
-- |
Seal Garage Floor? |
Leave paper on, buyer will do after closing |
|
-- |
-- |
When should we order trim? |
Can we use some from the Townes trailer? |
|
-- |
-- |
Deck Soffit |
|
|
-- |
-- |
Soffit for house and covered porch |
8/28: Greg will check on it; |
|
-- |
-- |
Shutters |
JB - week of Mar 26 |
|
-- |
-- |
Mount Sign on side of home |
|
|
-- |
-- |
Adjust framing and drywall in front bedroom |
Double pocket door, full width, shallower closet |
|
-- |
-- |
Adjust height of garage door panel |
New door on order - arriving by Nov 23 (likely) |
|
-- |
-- |
Disconnect hose |
|
|
-- |
-- |
Hook up furnace |
|
|
-- |
-- |
We need heat! |
|
|
-- |
-- |
Vent placement by island? |
|
|
-- |
-- |
Fix hardwood at vent move |
Eric - after Glen 54 |
|
-- |
-- |
Stain wood over windows same color as shutters |
Isaac |
|
-- |
-- |
Check out and repair drywall |
Kate will remind Tim |
|
-- |
-- |
Install carpet on stairs |
Kate talked to Eric |
|
-- |
-- |
Cover basement floor with paper |
Osbaldo - red rosin paper |
|
-- |
-- |
Transition strip between kitchen and laundry tile |
Eric: this week 4/23 |
|
-- |
-- |
Store black refrigerator and black range |
|
|
-- |
-- |
Transition strips between hall bath tile and hardwood |
Eric |
|
-- |
-- |
Closet install...master??? |
Kate working VA Installations |
|
-- |
-- |
Cover appliances |
Harbor Freight - Tom |
|
-- |
-- |
Install heat registers |
Maybe done? |
|
-- |
-- |
Install missing lights |
Harry |
|
-- |
-- |
Light Delivery |
Friday 4/20 |
|
-- |
-- |
CODED LOCKBOX --- 3508 |
|
|
-- |
-- |
Paint touch up |
|
|
-- |
-- |
Move lights |
|
|
-- |
-- |
Fix mirror |
|
|
-- |
-- |
Grout tile |
|
|
-- |
-- |
Wilma = 574-536-4287 |
|
|
-- |
-- |
Flooring on lower level |
|
|
-- |
-- |
Flooring selections |
|
|
-- |
-- |
Tile - Empire 500 Surf w/ Light Gray Grout |
|
|
-- |
-- |
Carpet |
|
|
-- |
-- |
Vanity |
Install September 13, 2018 |
|
-- |
-- |
Inspection items |
|
|
-- |
-- |
Rate expires Oct 8 |
|
|
-- |
-- |
Empty basement |
|
|
-- |
-- |
Remove some or all furniture |
Handled... |
|
-- |
-- |
Home Inspection - Thursday Sept 27 at 2 PM |
|
|
-- |
-- |
HVAC filter bypass |
|
|
-- |
-- |
Closing Friday, October 5 |
|
|
-- |
-- |
Cleaning |
|
|
-- |
-- |
Paint touch up |
|
|
-- |
-- |
Stone mortar has gaps and cracks |
|
|
-- |
-- |
Letters are holding water near a garage in southside |
Gutters |
|
-- |
-- |
Air filter holder barley catches filter which may allow filter to pull inside air handler (pic attache |
|
|
-- |
-- |
few ridge shingles are raised and wind driven rain can possibly leak in through gaps (p |
|
|
-- |
-- |
5- Dirt has not been filled in where water has washed out at southeast corner. |
|
|
-- |
-- |
Install faucet in basement bathroom |
|
|
-- |
-- |
Overflow drain basement bathroom |
|
|
-- |
-- |
Escutcheon in basement bathroom |
|
|
-- |
-- |
Floor drain in master bathroom needs to be changed |
|
|
-- |
-- |
Wash out basement room |
|
|
-- |
-- |
Drywall fixes |
|
|
-- |
-- |
Carpet transitions |
|
|
-- |
-- |
Cracked the door trim double closets downstairs family room |
|
|
-- |
-- |
Cracked door trim basement bedroom closet |
|
|
-- |
-- |
Outside basement bedroom window cap block and hole |
|
|
-- |
-- |
Basement tub overflow and drain |
|
|
-- |
-- |
Filter issue |
|
|
-- |
-- |
Wash out basement floor |
|
|
-- |
-- |
Duct tape in basement room over insulation |
|
|
-- |
-- |
Shingle issue |
|
|
-- |
-- |
Outside dirt fill issue |
|
|
-- |
-- |
Mortar issue |
|
|
-- |
-- |
|
|
|
-- |
-- |
Reseed yard when seeding Heritage 4 |
|
|
-- |
-- |
Move master bathroom toilet that is too close to the wall |
|
|
-- |
-- |
Patch and paint crack on ceiling |
|
|
-- |
-- |
Power wash concrete that is stained from construction |
|
|
-- |
-- |
Check attic above master bathroom to ensure darkening area is not a roof leak |
|
|
-- |
-- |
Solution for cracks in concrete that grew from construction |
Concrete caulk - Tom will Red |
|
-- |
-- |
Provide touch up paint for deck |
|
|
-- |
-- |
Stain on the concrete, someone spilled some sort of varnish while constructing the Measell house. |
11/2/2020 - Tom will look at this |
|
-- |
-- |
Cracked drywall. I tried to contact the guy I was given, he never responded. |
11/2/2020 - Greg will call Tim McClung about this again |
|
-- |
-- |
The toilet in my master bathroom is too close to the wall. It does not have to be centered, but I would like someone to check if they can move it at all, an inch or anything would be great. |
11/2/2020 - Tom will look at this |
|
-- |
-- |
Building Permit (30) |
Waiting on the permit from the City |
|
-- |
-- |
Order Roof & Floor Trusses (1) |
Waiting on plans from John McKinney |
|
-- |
-- |
Order Windows & Doors (0) |
|
|
-- |
-- |
Stake Out Home (1) |
|
|
-- |
-- |
Excavate (2) |
|
|
-- |
-- |
Inspection (Footers) (1) |
|
|
-- |
-- |
Pour Footers (1) |
|
|
-- |
-- |
Set Forms (2) |
|
|
-- |
-- |
Pour Foundation Walls (1) |
Tuesday, March 27 |
|
-- |
-- |
Plumb Slab (2) |
Week of April 3 - 7 |
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) |
|
|
-- |
-- |
Prepare Slab (1) |
|
|
-- |
-- |
Inspection (Slab) (1) |
|
|
-- |
-- |
Pour Slab (1) * |
|
|
-- |
-- |
Framing I (9) |
Luke |
|
-- |
-- |
Order Steps (0) |
|
|
-- |
-- |
Order Tubs / Showers (0) |
|
|
-- |
-- |
Framing II (8) |
|
|
-- |
-- |
Framing III (8) * |
DINING WINDOW 6 INCHES TOWARDS KITCHEN |
|
-- |
-- |
Install Stairs (0) |
|
|
-- |
-- |
Windows & Doors (0) |
|
|
-- |
-- |
House Number and Status in Window (0) |
|
|
-- |
-- |
Roofing (0) |
|
|
-- |
-- |
Order Cabinets (0) |
Kate working on selections and estimates |
|
-- |
-- |
Order Appliances (0) |
|
|
-- |
-- |
Deck (0) |
Aug 8 |
|
-- |
-- |
Gutters (0) |
|
|
-- |
-- |
Driveway (0) |
Osbaldo to form |
|
-- |
-- |
Privacy Divider / Fence (0) |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) |
|
|
-- |
-- |
HVAC Rough In (4) |
Wed, May 17 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) |
|
|
-- |
-- |
Plumbing Rough In (4) |
Starting Mon, May 22 |
|
-- |
-- |
Electric Rough In (4) |
Complete by Jun 26 - 27 |
|
-- |
-- |
Exterior Vinyl (0) * |
|
|
-- |
-- |
Insulation (2) |
|
|
-- |
-- |
Inspection (Insulation) (1) |
|
|
-- |
-- |
Inspection (Electric Service) (0) |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) |
Buried, need to be covered |
|
-- |
-- |
Order Interior Doors & Trim (0) |
|
|
-- |
-- |
Drywall (Hang) (4) * |
On site |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * |
|
|
-- |
-- |
Paint 1 (1) |
|
|
-- |
-- |
Garage Door (0) |
|
|
-- |
-- |
House Numbers (0) |
|
|
-- |
-- |
Cabinet Installation (2) * |
Install Mon, Dec 4 |
|
-- |
-- |
Granite Installation (1) * |
|
|
-- |
-- |
Interior Trim - Install (3) |
|
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * |
|
|
-- |
-- |
Luxury Vinyl Tile (0) |
2/12- grouting today |
|
-- |
-- |
Paint 2 (3) |
First floor only - in process as of 12/28 |
|
-- |
-- |
Cover Floors (1) |
Ready now January 15 |
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Shoe Moulding (0) |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) |
Joe |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) |
|
|
-- |
-- |
Set Water Meter (0) |
|
|
-- |
-- |
Electric Trim Out (3) |
Missing lights |
|
-- |
-- |
HVAC Trim Out (1) |
|
|
-- |
-- |
Plumbing Trim Out (2) |
Master bath needs to be finished |
|
-- |
-- |
Install Appliances (0) * |
Have been delivered |
|
-- |
-- |
Paint 3 (2) * |
|
|
-- |
-- |
Carpet (2) |
This week? |
|
-- |
-- |
Appraiser Confirms Construction Completion (0) |
|
|
-- |
-- |
Inspection (Final Building) (2) * |
Re-inspect |
|
-- |
-- |
Pre Walk Through (0) |
|
|
-- |
-- |
Cleaning (1) |
|
|
-- |
-- |
Certificate of Occupancy (1) * |
|
|
-- |
-- |
C.O. to Lender (0) |
|
|
-- |
-- |
Schedule Closing (0) |
|
|
-- |
-- |
Buyer Walk Through (1) |
|
|
-- |
-- |
Payment for Upgrades (0) |
|
|
-- |
-- |
Keys to Settlement Agent (0) |
|
|
-- |
-- |
Review Settlement Statement (0) |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) |
|
|
-- |
-- |
Closing (1) |
|
|
-- |
-- |
Remove Coded Lockbox (0) |
|
|