3 32 16 14 15 39 1 24 5 30 29 17 10 40 4 27 7 22 ADDR
- 5  ::  1770 Heritage Estates Circle
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
Wed    May 21      Ratified Contract? (0)      
Wed    May 21      $2500 Deposit Received (0)      
Wed    May 21      Association Packet Requested (0)      
Wed    May 21      Association Packet Received (0)      
Wed    May 21      Selections Meeting (0)      
Wed    May 21      Selections Sheet Signed (0)      
Wed    May 21      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Wed    May 21      Deposit For Upgrades Received (0)      
Wed    May 21      Inspection (Concrete Wall) (1)      
Thu    May 22      Inspection (Conduit Under Slab) (1)      
Fri    May 23      Inspection (Drain Tile) (0)      
Fri    May 23      Settlement Agent Confirmed (0)      
Fri    May 23      Verify Window & Roof Structure (0)      
Fri    May 23      Patio (0)      
Fri    May 23      Rough In Microwave Vent (0)      
Fri    May 23      Inspection (Rough In Plumbing) (1)      
Mon    May 26      Inspection (Rough In Electric) (1)      
Tue    May 27      Inspection (Deck Piers) (0)      
Tue    May 27      Inspection (Framing) (1) *       
Wed    May 28      Exterior Stone (0)      
Wed    May 28      Set Electric Meter (0) *       
Wed    May 28      Inspection (Main Water Line) (0)      
Wed    May 28      Loan Approval (0)      
Wed    May 28      Deed Preparation (0)      
Wed    May 28      Mailbox (0)      
Wed    May 28      Interior Trim - Paint (1)      
Thu    May 29      Ceiling Fans (0)      
Thu    May 29      Blower Door Test (1)      
Fri    May 30      Inspection (Final HVAC) (1)      
Mon    Jun 2      Inspection (Final Plumbing) (1)      
Tue    Jun 3      Inspection (Final Electric) (1)      
Wed    Jun 4      Stain Hardwood Stairs (1)      
Thu    Jun 5      Request Trash Tote From POA Manager (0)      
--   --   Waiting on a plat to submit with plans
--   --   Verizon line to be moved
--   --   Awning window in shop area
--   --   Do Not Seal Garage Floor
--   --   Buyer to paint garage floor Confusion here with the buyer. Garage floor has been covered
--   --   Seal Garage Floor?
--   --   Seal Garage Floor? Leave paper on, buyer will do after closing
--   --   When should we order trim? Can we use some from the Townes trailer?
--   --   Deck Soffit
--   --   Soffit for house and covered porch 8/28: Greg will check on it;
--   --   Shutters JB - week of Mar 26
--   --   Mount Sign on side of home
--   --   Adjust framing and drywall in front bedroom Double pocket door, full width, shallower closet
--   --   Adjust height of garage door panel New door on order - arriving by Nov 23 (likely)
--   --   Disconnect hose
--   --   Hook up furnace
--   --   We need heat!
--   --   Vent placement by island?
--   --   Fix hardwood at vent move Eric - after Glen 54
--   --   Stain wood over windows same color as shutters Isaac
--   --   Check out and repair drywall Kate will remind Tim
--   --   Install carpet on stairs Kate talked to Eric
--   --   Cover basement floor with paper Osbaldo - red rosin paper
--   --   Transition strip between kitchen and laundry tile Eric: this week 4/23
--   --   Store black refrigerator and black range
--   --   Transition strips between hall bath tile and hardwood Eric
--   --   Closet install...master??? Kate working VA Installations
--   --   Cover appliances Harbor Freight - Tom
--   --   Install heat registers Maybe done?
--   --   Install missing lights Harry
--   --   Light Delivery Friday 4/20
--   --   CODED LOCKBOX --- 3508
--   --   Paint touch up
--   --   Move lights
--   --   Fix mirror
--   --   Grout tile
--   --   Wilma = 574-536-4287
--   --   Flooring on lower level
--   --   Flooring selections
--   --   Tile - Empire 500 Surf w/ Light Gray Grout
--   --   Carpet
--   --   Vanity Install September 13, 2018
--   --   Inspection items
--   --   Rate expires Oct 8
--   --   Empty basement
--   --   Remove some or all furniture Handled...
--   --   Home Inspection - Thursday Sept 27 at 2 PM
--   --   HVAC filter bypass
--   --   Closing Friday, October 5
--   --   Cleaning
--   --   Paint touch up
--   --   Stone mortar has gaps and cracks
--   --   Letters are holding water near a garage in southside Gutters
--   --   Air filter holder barley catches filter which may allow filter to pull inside air handler (pic attache
--   --   few ridge shingles are raised and wind driven rain can possibly leak in through gaps (p
--   --   5- Dirt has not been filled in where water has washed out at southeast corner.
--   --   Install faucet in basement bathroom
--   --   Overflow drain basement bathroom
--   --   Escutcheon in basement bathroom
--   --   Floor drain in master bathroom needs to be changed
--   --   Wash out basement room
--   --   Drywall fixes
--   --   Carpet transitions
--   --   Cracked the door trim double closets downstairs family room
--   --   Cracked door trim basement bedroom closet
--   --   Outside basement bedroom window cap block and hole
--   --   Basement tub overflow and drain
--   --   Filter issue
--   --   Wash out basement floor
--   --   Duct tape in basement room over insulation
--   --   Shingle issue
--   --   Outside dirt fill issue
--   --   Mortar issue
--   --  
--   --   Reseed yard when seeding Heritage 4
--   --   Move master bathroom toilet that is too close to the wall
--   --   Patch and paint crack on ceiling
--   --   Power wash concrete that is stained from construction
--   --   Check attic above master bathroom to ensure darkening area is not a roof leak
--   --   Solution for cracks in concrete that grew from construction Concrete caulk - Tom will Red
--   --   Provide touch up paint for deck
--   --   Stain on the concrete, someone spilled some sort of varnish while constructing the Measell house. 11/2/2020 - Tom will look at this
--   --   Cracked drywall. I tried to contact the guy I was given, he never responded. 11/2/2020 - Greg will call Tim McClung about this again
--   --   The toilet in my master bathroom is too close to the wall. It does not have to be centered, but I would like someone to check if they can move it at all, an inch or anything would be great. 11/2/2020 - Tom will look at this
-- -- Building Permit (30)       Waiting on the permit from the City
-- -- Order Roof & Floor Trusses (1)       Waiting on plans from John McKinney
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1) *       
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)       Tuesday, March 27
-- -- Plumb Slab (2)       Week of April 3 - 7
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *       
-- -- Framing I (9)       Luke
-- -- Order Steps (0)      
-- -- Order Tubs / Showers (0)      
-- -- Framing II (8)      
-- -- Framing III (8) *        DINING WINDOW 6 INCHES TOWARDS KITCHEN
-- -- Install Stairs (0)      
-- -- Windows & Doors (0) *       
-- -- House Number and Status in Window (0)      
-- -- Roofing (0) *       
-- -- Order Cabinets (0)       Kate working on selections and estimates
-- -- Order Appliances (0)      
-- -- Deck (0)       Aug 8
-- -- Gutters (0)      
-- -- Driveway (0) *        Osbaldo to form
-- -- Privacy Divider / Fence (0)      
-- -- Sod / Seed / Landscaping (0)      
-- -- HVAC Rough In (4)       Wed, May 17
-- -- Inspection (Rough In HVAC) (1)      
-- -- Plumbing Rough In (4)       Starting Mon, May 22
-- -- Electric Rough In (4)       Complete by Jun 26 - 27
-- -- Exterior Vinyl (0) *       
-- -- Insulation (2) *       
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)       Buried, need to be covered
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4) *        On site
-- -- Drywall (Tape, Block, Skim, Sand) (6) *       
-- -- Paint 1 (1)      
-- -- Garage Door (0) *       
-- -- House Numbers (0)      
-- -- Cabinet Installation (2) *        Install Mon, Dec 4
-- -- Granite Installation (1) *       
-- -- Interior Trim - Install (3) *       
-- -- Order Plumbing / Lighting Fixtures (0)      
-- -- Luxury Vinyl Plank (3) *       
-- -- Luxury Vinyl Tile (0)       2/12- grouting today
-- -- Paint 2 (3)       First floor only - in process as of 12/28
-- -- Cover Floors (1)       Ready now January 15
-- -- Deliver Plumbing / Lighting Fixtures (0)      
-- -- Shoe Moulding (0)      
-- -- Shelving, Door Knobs, Fire Extinguisher (0) *        Joe
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Set Water Meter (0) *       
-- -- Electric Trim Out (3)       Missing lights
-- -- HVAC Trim Out (1)      
-- -- Plumbing Trim Out (2)       Master bath needs to be finished
-- -- Install Appliances (0) *        Have been delivered
-- -- Paint 3 (2) *       
-- -- Carpet (2)       This week?
-- -- Appraiser Confirms Construction Completion (0)      
-- -- Inspection (Final Building) (2) *        Re-inspect
-- -- Pre Walk Through (0)      
-- -- Cleaning (1)      
-- -- Certificate of Occupancy (1) *       
-- -- C.O. to Lender (0)      
-- -- Schedule Closing (0)      
-- -- Buyer Walk Through (1)      
-- -- Payment for Upgrades (0)      
-- -- Keys to Settlement Agent (0)      
-- -- Review Settlement Statement (0)      
-- -- Jerry Signs Closing Documents (0)      
-- -- Closing (1)      
-- -- Remove Coded Lockbox (0)