CONGERS-2
CONGERS-3
TUSCAN
3
32
16
14
15
39
1
24
5
30
29
17
10
40
4
27
7
22
•
ADDR
- 32 ::
CRITICAL PATH
|
INSPECTIONS
|
FLOOR PLANS
|
SELECTIONS
|
SPECS
|
CHANGES
|
NHS
view photo archive
--
--
STAR: Add return and supply in crawlspace
Wed
Nov 27
Ratified Contract?
(0)
Wed
Nov 27
$2500 Deposit Received
(0)
Wed
Nov 27
Association Packet Requested
(0)
Wed
Nov 27
Association Packet Received
(0)
Wed
Nov 27
Selections Meeting
(0)
Wed
Nov 27
Selections Sheet Signed
(0)
Wed
Nov 27
Amendment for Upgrades (B,S,L,T,BCP)
(0)
Wed
Nov 27
Deposit For Upgrades Received
(0)
Wed
Nov 27
Inspection (Concrete Wall)
(1)
Thu
Nov 28
Inspection (Conduit Under Slab)
(1)
Fri
Nov 29
Inspection (Drain Tile)
(0)
Fri
Nov 29
Settlement Agent Confirmed
(0)
Fri
Nov 29
Order Tubs / Showers
(0)
Fri
Nov 29
Framing II
(8)
Wed
Dec 11
Framing III
(8)
*
Mon
Dec 23
Verify Window & Roof Structure
(0)
Mon
Dec 23
Install Stairs
(0)
Mon
Dec 23
House Number and Status in Window
(0)
Mon
Dec 23
Order Appliances
(0)
Mon
Dec 23
Patio
(0)
Mon
Dec 23
Rough In Microwave Vent
(0)
Mon
Dec 23
Inspection (Rough In Plumbing)
(1)
Tue
Dec 24
Inspection (Rough In Electric)
(1)
Wed
Dec 25
Inspection (Deck Piers)
(0)
Wed
Dec 25
Inspection (Framing)
(1)
Thu
Dec 26
Exterior Stone
(0)
Thu
Dec 26
Set Electric Meter
(0)
Thu
Dec 26
Inspection (Main Water Line)
(0)
Thu
Dec 26
Loan Approval
(0)
Thu
Dec 26
Deed Preparation
(0)
Thu
Dec 26
Garage Door
(0)
Thu
Dec 26
House Numbers
(0)
Thu
Dec 26
Mailbox
(0)
Thu
Dec 26
Order Plumbing / Lighting Fixtures
(0)
Thu
Dec 26
Interior Trim - Paint
(1)
Fri
Dec 27
Cover Floors
(1)
Mon
Dec 30
Deliver Plumbing / Lighting Fixtures
(0)
Mon
Dec 30
Shoe Moulding
(0)
Mon
Dec 30
Set Water Meter
(0)
Mon
Dec 30
Ceiling Fans
(0)
Mon
Dec 30
Blower Door Test
(1)
Tue
Dec 31
Paint 3
(2)
*
Thu
Jan 2
Appraiser Confirms Construction Completion
(0)
Thu
Jan 2
Inspection (Final HVAC)
(1)
Fri
Jan 3
Inspection (Final Plumbing)
(1)
Mon
Jan 6
Inspection (Final Electric)
(1)
Tue
Jan 7
Stain Hardwood Stairs
(1)
Wed
Jan 8
C.O. to Lender
(0)
Wed
Jan 8
Schedule Closing
(0)
Wed
Jan 8
Buyer Walk Through
(1)
Thu
Jan 9
Payment for Upgrades
(0)
Thu
Jan 9
Keys to Settlement Agent
(0)
Thu
Jan 9
Review Settlement Statement
(0)
Thu
Jan 9
Jerry Signs Closing Documents
(0)
Thu
Jan 9
Request Trash Tote From POA Manager
(0)
Thu
Jan 9
Closing
(1)
Fri
Jan 10
Remove Coded Lockbox
(0)
--
--
Pour Patio
--
--
Install Bookshelves
--
--
Home Inspection?
--
--
Install Bookshelves
--
--
Install Shower Door
--
--
Building Permit
(30)
--
--
Order Roof & Floor Trusses
(1)
--
--
Order Windows & Doors
(0)
--
--
Stake Out Home
(1)
--
--
Excavate
(2)
--
--
Inspection (Footers)
(1)
--
--
Pour Footers
(1)
--
--
Set Forms
(2)
--
--
Pour Foundation Walls
(1)
--
--
Plumb Slab
(2)
--
--
Inspection (Plumbing Under Slab)
(1)
--
--
Prepare Slab
(1)
--
--
Inspection (Slab)
(1)
--
--
Pour Slab
(1)
*
--
--
Framing I
(9)
--
--
Order Steps
(0)
--
--
Windows & Doors
(0)
--
--
Roofing
(0)
--
--
Order Cabinets
(0)
--
--
Deck
(0)
--
--
Gutters
(0)
--
--
Driveway
(0)
--
--
Privacy Divider / Fence
(0)
--
--
Sod / Seed / Landscaping
(0)
--
--
HVAC Rough In
(4)
--
--
Inspection (Rough In HVAC)
(1)
--
--
Plumbing Rough In
(4)
--
--
Electric Rough In
(4)
--
--
Exterior Vinyl
(0)
*
--
--
Insulation
(2)
--
--
Inspection (Insulation)
(1)
--
--
Inspection (Electric Service)
(0)
--
--
Inspection (Main Sewer Line)
(0)
--
--
Order Interior Doors & Trim
(0)
--
--
Drywall (Hang)
(4)
*
--
--
Drywall (Tape, Block, Skim, Sand)
(6)
*
--
--
Paint 1
(1)
--
--
Cabinet Installation
(2)
*
--
--
Granite Installation
(1)
*
--
--
Interior Trim - Install
(3)
--
--
Luxury Vinyl Plank
(3)
*
--
--
Luxury Vinyl Tile
(0)
--
--
Paint 2
(3)
--
--
Shelving, Door Knobs, Fire Extinguisher
(0)
--
--
Install Coded Lockbox (add extra keys)
(0)
--
--
Pay Water / Sewer Taps
(0)
--
--
Electric Trim Out
(3)
--
--
HVAC Trim Out
(1)
--
--
Plumbing Trim Out
(2)
All done except shower;
--
--
Install Appliances
(0)
*
--
--
Carpet
(2)
Installed April 11;
--
--
Inspection (Final Building)
(2)
*
--
--
Pre Walk Through
(0)
--
--
Cleaning
(1)
--
--
Certificate of Occupancy
(1)
*