CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
--   --   STAR: Add return and supply in crawlspace
Wed    Nov 27      Ratified Contract? (0)      
Wed    Nov 27      $2500 Deposit Received (0)      
Wed    Nov 27      Association Packet Requested (0)      
Wed    Nov 27      Association Packet Received (0)      
Wed    Nov 27      Selections Meeting (0)      
Wed    Nov 27      Selections Sheet Signed (0)      
Wed    Nov 27      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Wed    Nov 27      Deposit For Upgrades Received (0)      
Wed    Nov 27      Inspection (Concrete Wall) (1)      
Thu    Nov 28      Inspection (Conduit Under Slab) (1)      
Fri    Nov 29      Inspection (Drain Tile) (0)      
Fri    Nov 29      Settlement Agent Confirmed (0)      
Fri    Nov 29      Order Tubs / Showers (0)      
Fri    Nov 29      Framing II (8)      
Wed    Dec 11      Framing III (8) *       
Mon    Dec 23      Verify Window & Roof Structure (0)      
Mon    Dec 23      Install Stairs (0)      
Mon    Dec 23      House Number and Status in Window (0)      
Mon    Dec 23      Order Appliances (0)      
Mon    Dec 23      Patio (0)      
Mon    Dec 23      Rough In Microwave Vent (0)      
Mon    Dec 23      Inspection (Rough In Plumbing) (1)      
Tue    Dec 24      Inspection (Rough In Electric) (1)      
Wed    Dec 25      Inspection (Deck Piers) (0)      
Wed    Dec 25      Inspection (Framing) (1)      
Thu    Dec 26      Exterior Stone (0)      
Thu    Dec 26      Set Electric Meter (0)      
Thu    Dec 26      Inspection (Main Water Line) (0)      
Thu    Dec 26      Loan Approval (0)      
Thu    Dec 26      Deed Preparation (0)      
Thu    Dec 26      Garage Door (0)      
Thu    Dec 26      House Numbers (0)      
Thu    Dec 26      Mailbox (0)      
Thu    Dec 26      Order Plumbing / Lighting Fixtures (0)      
Thu    Dec 26      Interior Trim - Paint (1)      
Fri    Dec 27      Cover Floors (1)      
Mon    Dec 30      Deliver Plumbing / Lighting Fixtures (0)      
Mon    Dec 30      Shoe Moulding (0)      
Mon    Dec 30      Set Water Meter (0)      
Mon    Dec 30      Ceiling Fans (0)      
Mon    Dec 30      Blower Door Test (1)      
Tue    Dec 31      Paint 3 (2) *       
Thu    Jan 2      Appraiser Confirms Construction Completion (0)      
Thu    Jan 2      Inspection (Final HVAC) (1)      
Fri    Jan 3      Inspection (Final Plumbing) (1)      
Mon    Jan 6      Inspection (Final Electric) (1)      
Tue    Jan 7      Stain Hardwood Stairs (1)      
Wed    Jan 8      C.O. to Lender (0)      
Wed    Jan 8      Schedule Closing (0)      
Wed    Jan 8      Buyer Walk Through (1)      
Thu    Jan 9      Payment for Upgrades (0)      
Thu    Jan 9      Keys to Settlement Agent (0)      
Thu    Jan 9      Review Settlement Statement (0)      
Thu    Jan 9      Jerry Signs Closing Documents (0)      
Thu    Jan 9      Request Trash Tote From POA Manager (0)      
Thu    Jan 9      Closing (1)      
Fri    Jan 10      Remove Coded Lockbox (0)      
--   --   Pour Patio
--   --   Install Bookshelves
--   --   Home Inspection?
--   --   Install Bookshelves
--   --   Install Shower Door
-- -- Building Permit (30)      
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1)      
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *       
-- -- Framing I (9)      
-- -- Order Steps (0)      
-- -- Windows & Doors (0)      
-- -- Roofing (0)      
-- -- Order Cabinets (0)      
-- -- Deck (0)      
-- -- Gutters (0)      
-- -- Driveway (0)      
-- -- Privacy Divider / Fence (0)      
-- -- Sod / Seed / Landscaping (0)      
-- -- HVAC Rough In (4)      
-- -- Inspection (Rough In HVAC) (1)      
-- -- Plumbing Rough In (4)      
-- -- Electric Rough In (4)      
-- -- Exterior Vinyl (0) *       
-- -- Insulation (2)      
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4) *       
-- -- Drywall (Tape, Block, Skim, Sand) (6) *       
-- -- Paint 1 (1)      
-- -- Cabinet Installation (2) *       
-- -- Granite Installation (1) *       
-- -- Interior Trim - Install (3)      
-- -- Luxury Vinyl Plank (3) *       
-- -- Luxury Vinyl Tile (0)      
-- -- Paint 2 (3)      
-- -- Shelving, Door Knobs, Fire Extinguisher (0)      
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Electric Trim Out (3)      
-- -- HVAC Trim Out (1)      
-- -- Plumbing Trim Out (2)       All done except shower;
-- -- Install Appliances (0) *       
-- -- Carpet (2)       Installed April 11;
-- -- Inspection (Final Building) (2) *       
-- -- Pre Walk Through (0)      
-- -- Cleaning (1)      
-- -- Certificate of Occupancy (1) *