Further Punch Out? Tom to visit; |
Sue met with Tom in January? Still no action as of Mar 27? |
|
Wed |
Nov 27 |
Ratified Contract? (0) |
|
|
Wed |
Nov 27 |
$2500 Deposit Received (0) |
|
|
Wed |
Nov 27 |
Association Packet Requested (0) |
|
|
Wed |
Nov 27 |
Association Packet Received (0) |
|
|
Wed |
Nov 27 |
Selections Meeting (0) |
|
|
Wed |
Nov 27 |
Selections Sheet Signed (0) |
|
|
Wed |
Nov 27 |
Amendment for Upgrades (B,S,L,T,BCP) (0) |
|
|
Wed |
Nov 27 |
Deposit For Upgrades Received (0) |
|
|
Wed |
Nov 27 |
Inspection (Concrete Wall) (1) |
|
|
Thu |
Nov 28 |
Inspection (Conduit Under Slab) (1) |
|
|
Fri |
Nov 29 |
Inspection (Drain Tile) (0) |
|
|
Fri |
Nov 29 |
Settlement Agent Confirmed (0) |
|
|
Fri |
Nov 29 |
Verify Window & Roof Structure (0) |
|
|
Fri |
Nov 29 |
Order Appliances (0) |
|
|
Fri |
Nov 29 |
Patio (0) |
|
|
Fri |
Nov 29 |
Rough In Microwave Vent (0) |
|
|
Fri |
Nov 29 |
Inspection (Rough In Plumbing) (1) |
|
|
Mon |
Dec 2 |
Inspection (Rough In Electric) (1) |
|
|
Tue |
Dec 3 |
Inspection (Deck Piers) (0) |
|
|
Tue |
Dec 3 |
Inspection (Framing) (1) |
|
|
Wed |
Dec 4 |
Exterior Stone (0) |
|
|
Wed |
Dec 4 |
Set Electric Meter (0) |
|
|
Wed |
Dec 4 |
Inspection (Main Water Line) (0) |
|
|
Wed |
Dec 4 |
Loan Approval (0) |
|
|
Wed |
Dec 4 |
Deed Preparation (0) |
|
|
Wed |
Dec 4 |
Mailbox (0) |
|
|
Wed |
Dec 4 |
Interior Trim - Paint (1) |
|
|
Thu |
Dec 5 |
Ceiling Fans (0) |
|
|
Thu |
Dec 5 |
Blower Door Test (1) |
|
|
Fri |
Dec 6 |
Inspection (Final HVAC) (1) |
|
|
Mon |
Dec 9 |
Inspection (Final Plumbing) (1) |
|
|
Tue |
Dec 10 |
Inspection (Final Electric) (1) |
|
|
Wed |
Dec 11 |
Stain Hardwood Stairs (1) |
|
|
Thu |
Dec 12 |
Request Trash Tote From POA Manager (0) |
|
|
|
-- |
-- |
Review Contract in Operations Meeting |
|
|
-- |
-- |
Review master bath configuration |
|
|
-- |
-- |
Determine standard hardwood flooring with Jerry |
|
|
-- |
-- |
Gabby will mark off kitchen on Mon, Nov 20 |
|
|
-- |
-- |
Did you check with buyer on brick color? |
|
|
-- |
-- |
Need trash can on site. Needs to be cleaned up |
|
|
-- |
-- |
Valley Renovators for trim- Tom call to schedule |
|
|
-- |
-- |
Trim around garage door into house |
|
|
-- |
-- |
Who is trimming stairs |
|
|
-- |
-- |
When fireplace being installed? |
|
|
-- |
-- |
Fireplace? |
Install mantle today |
|
-- |
-- |
Check with buyer, hardwood or hearth to fireplace? |
|
|
-- |
-- |
Replace cracked hearth |
|
|
-- |
-- |
Install stove after closing (back ordered) |
|
|
-- |
-- |
Front Door & Garage Door Color |
Benjamin Moore, Bittersweet Chocolate 2114-10 |
|
-- |
-- |
Paint touch up |
Mar 6 |
|
-- |
-- |
Install bathroom accessories |
Monday 2/27 |
|
-- |
-- |
Finish installing closet shelving |
Monday 2/27 |
|
-- |
-- |
Paint and stain steps and risers |
Wednesday and Thursday, March 1 and 2 |
|
-- |
-- |
Yellow tape everywhere on floors |
Eric, Tues 2/28 |
|
-- |
-- |
Set screen doors |
|
|
-- |
-- |
Patch hole in basement ceiling |
Isaac, Wednesday, March 1 |
|
-- |
-- |
Hang bathroom mirrors |
Monday 2/27 |
|
-- |
-- |
Wrap |
|
|
-- |
-- |
Wrap posts |
|
|
-- |
-- |
Front door weatherstripping |
|
|
-- |
-- |
Sagging patio door |
|
|
-- |
-- |
Scratched glass on main level door |
On order |
|
-- |
-- |
Clean up scratch on deck boards |
Premiere Vinyl will buff it out; |
|
-- |
-- |
Straighten floor register in living room |
|
|
-- |
-- |
Straighten floor register in living room |
|
|
-- |
-- |
Drywall repairs |
pendant lights, basement, garage, tile shower |
|
-- |
-- |
Install garage door trim |
Greg will coordinate this; |
|
-- |
-- |
Install gutters at back of home |
|
|
-- |
-- |
Install outside light |
|
|
-- |
-- |
Scratch across decking boards |
|
|
-- |
-- |
Need lock box |
|
|
-- |
-- |
Cau |
|
|
-- |
-- |
Install missing fascia board on deck |
|
|
-- |
-- |
Missing trim on fireplace |
|
|
-- |
-- |
Install trim at patio door |
|
|
-- |
-- |
Install door threshold on patio door |
|
|
-- |
-- |
Install missing piece of trim at fireplace |
When doing H-24 fireplace |
|
-- |
-- |
Low voltage trim out |
Tom |
|
-- |
-- |
Carpet stain at the bottom of the stairs |
Eric |
|
-- |
-- |
Replace scratched deck boards |
Premiere Vinyl |
|
-- |
-- |
Building Permit (30) |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) |
|
|
-- |
-- |
Order Windows & Doors (0) |
|
|
-- |
-- |
Stake Out Home (1) |
|
|
-- |
-- |
Excavate (2) |
|
|
-- |
-- |
Inspection (Footers) (1) |
|
|
-- |
-- |
Pour Footers (1) |
|
|
-- |
-- |
Set Forms (2) |
|
|
-- |
-- |
Pour Foundation Walls (1) |
|
|
-- |
-- |
Plumb Slab (2) |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) |
|
|
-- |
-- |
Prepare Slab (1) |
|
|
-- |
-- |
Inspection (Slab) (1) |
|
|
-- |
-- |
Pour Slab (1) * |
Sept 6 |
|
-- |
-- |
Framing I (9) |
9/15 complete? |
|
-- |
-- |
Order Steps (0) |
|
|
-- |
-- |
Order Tubs / Showers (0) |
|
|
-- |
-- |
Framing II (8) |
10/3 |
|
-- |
-- |
Framing III (8) * |
10/10 |
|
-- |
-- |
Install Stairs (0) |
|
|
-- |
-- |
Windows & Doors (0) |
|
|
-- |
-- |
House Number and Status in Window (0) |
|
|
-- |
-- |
Roofing (0) |
|
|
-- |
-- |
Order Cabinets (0) |
|
|
-- |
-- |
Deck (0) |
Finished by 2/20/2017; |
|
-- |
-- |
Gutters (0) |
Waiting on deck |
|
-- |
-- |
Driveway (0) |
Jan 30 - Patio |
|
-- |
-- |
Privacy Divider / Fence (0) |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) |
2/20/2017 |
|
-- |
-- |
HVAC Rough In (4) |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1) |
|
|
-- |
-- |
Plumbing Rough In (4) |
11/14 - starting |
|
-- |
-- |
Electric Rough In (4) |
|
|
-- |
-- |
Exterior Vinyl (0) * |
11/10: Stucco starting soon |
|
-- |
-- |
Insulation (2) |
|
|
-- |
-- |
Inspection (Insulation) (1) |
|
|
-- |
-- |
Inspection (Electric Service) (0) |
Line is buried, waiting on connection from HEC; |
|
-- |
-- |
Inspection (Main Sewer Line) (0) |
Need to dig a ditch |
|
-- |
-- |
Order Interior Doors & Trim (0) |
|
|
-- |
-- |
Drywall (Hang) (4) * |
12/8 materials on site |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * |
12/19 nearly complete |
|
-- |
-- |
Paint 1 (1) |
|
|
-- |
-- |
Garage Door (0) |
|
|
-- |
-- |
House Numbers (0) |
|
|
-- |
-- |
Cabinet Installation (2) * |
Delivered Jan 10; Installed Jan 10-13; |
|
-- |
-- |
Granite Installation (1) * |
Tues, Feb 14 |
|
-- |
-- |
Interior Trim - Install (3) |
One days work- after flooring |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * |
|
|
-- |
-- |
Luxury Vinyl Tile (0) |
Will be complete by 2/2 |
|
-- |
-- |
Paint 2 (3) |
Nearly complete |
|
-- |
-- |
Cover Floors (1) |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Shoe Moulding (0) |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) |
Wednesday Feb 1 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) |
Ben is getting a check to the City |
|
-- |
-- |
Set Water Meter (0) |
|
|
-- |
-- |
Electric Trim Out (3) |
2/27- nearly complete |
|
-- |
-- |
HVAC Trim Out (1) |
Need to set outside unit |
|
-- |
-- |
Plumbing Trim Out (2) |
Done 2/20/2017 |
|
-- |
-- |
Install Appliances (0) * |
Install Feb 17 |
|
-- |
-- |
Paint 3 (2) * |
|
|
-- |
-- |
Carpet (2) |
Tues, Feb 14 |
|
-- |
-- |
Appraiser Confirms Construction Completion (0) |
|
|
-- |
-- |
Inspection (Final Building) (2) * |
Mon, Feb 27 |
|
-- |
-- |
Pre Walk Through (0) |
|
|
-- |
-- |
Cleaning (1) |
|
|
-- |
-- |
Certificate of Occupancy (1) * |
|
|
-- |
-- |
C.O. to Lender (0) |
|
|
-- |
-- |
Schedule Closing (0) |
|
|
-- |
-- |
Buyer Walk Through (1) |
Thursday, March 30, 11:00 AM |
|
-- |
-- |
Payment for Upgrades (0) |
|
|
-- |
-- |
Keys to Settlement Agent (0) |
|
|
-- |
-- |
Review Settlement Statement (0) |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) |
|
|
-- |
-- |
Closing (1) |
|
|
-- |
-- |
Remove Coded Lockbox (0) |
|
|