| Mon | Dec 15 | Ratified Contract? (0) | ||
| Mon | Dec 15 | $2500 Deposit Received (0) | ||
| Mon | Dec 15 | Association Packet Requested (0) | ||
| Mon | Dec 15 | Association Packet Received (0) | ||
| Mon | Dec 15 | Selections Meeting (0) | ||
| Mon | Dec 15 | Selections Sheet Signed (0) | ||
| Mon | Dec 15 | Amendment for Upgrades (B,S,L,T,BCP) (0) | ||
| Mon | Dec 15 | Deposit For Upgrades Received (0) | ||
| Mon | Dec 15 | Inspection (Concrete Wall) (1) | ||
| Tue | Dec 16 | Inspection (Conduit Under Slab) (1) | ||
| Wed | Dec 17 | Inspection (Drain Tile) (0) | ||
| Wed | Dec 17 | Settlement Agent Confirmed (0) | ||
| Wed | Dec 17 | Verify Window & Roof Structure (0) | ||
| Wed | Dec 17 | Patio (0) | ||
| Wed | Dec 17 | Rough In Microwave Vent (0) | ||
| Wed | Dec 17 | Inspection (Rough In Plumbing) (1) | ||
| Thu | Dec 18 | Inspection (Rough In Electric) (1) | ||
| Fri | Dec 19 | Inspection (Framing) (1) * | ||
| Mon | Dec 22 | Inspection (Deck Piers) (0) | ||
| Mon | Dec 22 | Exterior Stone (0) | ||
| Mon | Dec 22 | Set Electric Meter (0) * | ||
| Mon | Dec 22 | Inspection (Main Water Line) (0) | ||
| Mon | Dec 22 | Loan Approval (0) | ||
| Mon | Dec 22 | Deed Preparation (0) | ||
| Mon | Dec 22 | Mailbox (0) | ||
| Mon | Dec 22 | Interior Trim - Paint (1) | ||
| Tue | Dec 23 | Ceiling Fans (0) | ||
| Tue | Dec 23 | Blower Door Test (1) | ||
| Wed | Dec 24 | Inspection (Final HVAC) (1) | ||
| Thu | Dec 25 | Inspection (Final Plumbing) (1) | ||
| Fri | Dec 26 | Inspection (Final Electric) (1) | ||
| Mon | Dec 29 | Stain Hardwood Stairs (1) * | ||
| Tue | Dec 30 | Request Trash Tote From POA Manager (0) | ||
| -- | -- | Discuss Existing Conduit Layout | ||
| -- | -- | Shingle color? Same? | ||
| -- | -- | Shingle color? Same? | ||
| -- | -- | |||
| -- | -- | Busted back pillar 6/24 | Wrap with white PVC board | |
| -- | -- | Photo of framed opening: https://bit.ly/2PojUVs | ||
| -- | -- | Electric trim out before remaining drywall goes up 8/19 | ||
| -- | -- | Kate - Can the buyer pick the LVP color? | ||
| -- | -- | Kate - Can the buyer extend LBP to the bedrooms? | ||
| -- | -- | Kate - The buyer is ready to pick the granite color. | ||
| -- | -- | Bathroom floors-arriving 10/29 | Eric to install 11/6in process 11/7 | |
| -- | -- | CODED LOCKBOX 0101 | ||
| -- | -- | Anchor dishwasher 11/29 | ||
| -- | -- | Drywall repairs needed | ||
| -- | -- | Door lock broken 12/16 | ||
| -- | -- | Door lock broken 12/16 | ||
| -- | -- | |||
| -- | -- | Window framing repairs needed in MB 1/3 | Painter | |
| -- | -- | Light bulbs needed throughout 1/6 | Greg to order and put in GWB | |
| -- | -- | Paint touch up needed throughout | ||
| -- | -- | Transition strip to laundry needed 1/20 | Greg to get from lowes 1/21 Eric to install | |
| -- | -- | Microwave needed | Maybe on order? | |
| -- | -- | Cabinet trim needed in hallway bath 2/3 | ||
| -- | -- | Clean again | is it going to need it again?? 2/14 | |
| -- | -- | Paint door trim 2/6 | Needs completing 2/24 | |
| -- | -- | Door handle to patio door needed 2/6 | ||
| -- | -- | Bathroom outlet covers needed 2/10 | after paint touch up 2/14 | |
| -- | -- | Check deadbolt | Broken 2/17 | |
| -- | -- | Landscaping repairs 3/3 | Tom scheduling landscaping 3/18 | |
| -- | -- | Loose door handle | Kate talked to Ron- | |
| -- | -- | Deadbolt is difficult to operate | WD40-worked better 3/31 | |
| -- | -- | Touch up paint | ||
| -- | -- | Paint front door | ||
| -- | -- | Pressure wash siding | ||
| -- | -- | Finish cable panel | Tom will take a look | |
| -- | -- | Final clean | ||
| -- | -- | Building Permit (30) * | ||
| -- | -- | Order Roof & Floor Trusses (1) | ||
| -- | -- | Order Windows & Doors (0) | ||
| -- | -- | Stake Out Home (1) | ||
| -- | -- | Excavate (2) | ||
| -- | -- | Inspection (Footers) (1) | ||
| -- | -- | Pour Footers (1) * | ||
| -- | -- | Set Forms (2) | ||
| -- | -- | Pour Foundation Walls (1) | ||
| -- | -- | Plumb Slab (2) | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) | Jan 6 or 7 | |
| -- | -- | Prepare Slab (1) | ||
| -- | -- | Inspection (Slab) (1) | ||
| -- | -- | Pour Slab (1) * | ||
| -- | -- | Framing I (9) | in process 2/8 | |
| -- | -- | Order Steps (0) | ||
| -- | -- | Order Tubs / Showers (0) | ||
| -- | -- | Framing II (8) | ||
| -- | -- | Framing III (8) * | Roof in process 3/29 | |
| -- | -- | Install Stairs (0) * | ||
| -- | -- | Windows & Doors (0) * | ||
| -- | -- | House Number and Status in Window (0) | ||
| -- | -- | Roofing (0) * | ||
| -- | -- | Order Cabinets (0) | ||
| -- | -- | Order Appliances (0) | ||
| -- | -- | Deck (0) | in process 4/4 | |
| -- | -- | Gutters (0) | ||
| -- | -- | Driveway (0) * | ||
| -- | -- | Privacy Divider / Fence (0) * | ||
| -- | -- | Sod / Seed / Landscaping (0) | ||
| -- | -- | HVAC Rough In (4) | in process 4/29 | |
| -- | -- | Plumbing Rough In (4) | ||
| -- | -- | Electric Rough In (4) | Almost complete 6/14 | |
| -- | -- | Inspection (Rough In HVAC) (1) | ||
| -- | -- | Exterior Vinyl (0) * | ||
| -- | -- | Insulation (2) * | ||
| -- | -- | Inspection (Insulation) (1) | ||
| -- | -- | Inspection (Electric Service) (0) | ||
| -- | -- | Inspection (Main Sewer Line) (0) | ||
| -- | -- | Order Interior Doors & Trim (0) | Doors ordered. Trim to be ordered 9/28 GWB | |
| -- | -- | Drywall (Hang) (4) * | Almost complete 9/2 | |
| -- | -- | Drywall (Tape, Block, Skim, Sand) (6) * | In process 9/19- almost completed | |
| -- | -- | Paint 1 (1) | Set to start 9/22 GWB | |
| -- | -- | Garage Door (0) | ||
| -- | -- | House Numbers (0) | ||
| -- | -- | Cabinet Installation (2) * | ||
| -- | -- | Granite Installation (1) * | Thursday, 11/11 | |
| -- | -- | Interior Trim - Install (3) * | in process 10/14 | |
| -- | -- | Order Plumbing / Lighting Fixtures (0) | ||
| -- | -- | Luxury Vinyl Plank (3) * | Waiting on arrival date for that flooring. | |
| -- | -- | Luxury Vinyl Tile (0) | ||
| -- | -- | Paint 2 (3) | Galindez on site 11/5 should be finished | |
| -- | -- | Cover Floors (1) | ||
| -- | -- | Deliver Plumbing / Lighting Fixtures (0) | ||
| -- | -- | Shoe Moulding (0) | In process 11/7 | |
| -- | -- | Shelving, Door Knobs, Fire Extinguisher (0) * | ||
| -- | -- | Install Coded Lockbox (add extra keys) (0) | ||
| -- | -- | Pay Water / Sewer Taps (0) | ||
| -- | -- | Set Water Meter (0) * | ||
| -- | -- | Electric Trim Out (3) * | In process 1/3 | |
| -- | -- | HVAC Trim Out (1) * | ||
| -- | -- | Plumbing Trim Out (2) * | ||
| -- | -- | Install Appliances (0) * | CJ to install pending date | |
| -- | -- | Paint 3 (2) * | ||
| -- | -- | Carpet (2) | ||
| -- | -- | Appraiser Confirms Construction Completion (0) | ||
| -- | -- | Inspection (Final Building) (2) * | ||
| -- | -- | Pre Walk Through (0) | 1.22 GWB | |
| -- | -- | Cleaning (1) | ||
| -- | -- | Certificate of Occupancy (1) * | ||
| -- | -- | C.O. to Lender (0) | ||
| -- | -- | Schedule Closing (0) | ||
| -- | -- | Buyer Walk Through (1) * | Tuesday, 4/20 at 11AM | |
| -- | -- | Payment for Upgrades (0) | ||
| -- | -- | Keys to Settlement Agent (0) | ||
| -- | -- | Review Settlement Statement (0) | ||
| -- | -- | Jerry Signs Closing Documents (0) | Wed, 4/21 at 4:00 PM | |
| -- | -- | Closing (1) | Wed, 4/21 at 4:30 PM | |
| -- | -- | Remove Coded Lockbox (0) | ||