CODED LOCKBOX --- 9593 |
Or 9074 |
|
-- |
-- |
Broken window |
|
|
-- |
-- |
Cleaning |
|
|
Tue |
Apr 29 |
Ratified Contract? (0) |
|
|
Tue |
Apr 29 |
$2500 Deposit Received (0) |
|
|
Tue |
Apr 29 |
Association Packet Requested (0) |
|
|
Tue |
Apr 29 |
Association Packet Received (0) |
|
|
Tue |
Apr 29 |
Selections Meeting (0) |
|
|
Tue |
Apr 29 |
Selections Sheet Signed (0) |
|
|
Tue |
Apr 29 |
Amendment for Upgrades (B,S,L,T,BCP) (0) |
|
|
Tue |
Apr 29 |
Deposit For Upgrades Received (0) |
|
|
Tue |
Apr 29 |
Inspection (Concrete Wall) (1) |
|
|
Wed |
Apr 30 |
Inspection (Conduit Under Slab) (1) |
|
|
Thu |
May 1 |
Inspection (Drain Tile) (0) |
|
|
Thu |
May 1 |
Settlement Agent Confirmed (0) |
|
|
Thu |
May 1 |
Verify Window & Roof Structure (0) |
|
|
Thu |
May 1 |
Order Appliances (0) |
|
|
Thu |
May 1 |
Patio (0) |
|
|
Thu |
May 1 |
Rough In Microwave Vent (0) |
|
|
Thu |
May 1 |
Inspection (Rough In Plumbing) (1) |
|
|
Fri |
May 2 |
Inspection (Rough In Electric) (1) |
|
|
Mon |
May 5 |
Inspection (Deck Piers) (0) |
|
|
Mon |
May 5 |
Inspection (Framing) (1) * |
|
|
Tue |
May 6 |
Exterior Stone (0) |
|
|
Tue |
May 6 |
Set Electric Meter (0) * |
|
|
Tue |
May 6 |
Inspection (Main Water Line) (0) |
|
|
Tue |
May 6 |
Loan Approval (0) |
|
|
Tue |
May 6 |
Deed Preparation (0) |
|
|
Tue |
May 6 |
Mailbox (0) |
|
|
Tue |
May 6 |
Order Plumbing / Lighting Fixtures (0) |
|
|
Tue |
May 6 |
Interior Trim - Paint (1) |
|
|
Wed |
May 7 |
Set Water Meter (0) * |
|
|
Wed |
May 7 |
Ceiling Fans (0) |
|
|
Wed |
May 7 |
Blower Door Test (1) |
|
|
Thu |
May 8 |
Inspection (Final HVAC) (1) |
|
|
Fri |
May 9 |
Inspection (Final Plumbing) (1) |
|
|
Mon |
May 12 |
Inspection (Final Electric) (1) |
|
|
Tue |
May 13 |
Stain Hardwood Stairs (1) |
|
|
Wed |
May 14 |
Schedule Closing (0) |
|
|
Wed |
May 14 |
Keys to Settlement Agent (0) |
|
|
Wed |
May 14 |
Review Settlement Statement (0) |
|
|
Wed |
May 14 |
Jerry Signs Closing Documents (0) |
|
|
Wed |
May 14 |
Request Trash Tote From POA Manager (0) |
|
|
Wed |
May 14 |
Closing (1) |
|
|
Thu |
May 15 |
Remove Coded Lockbox (0) |
|
|
|
-- |
-- |
Remove furniture, etc. |
|
|
-- |
-- |
Install all heat registers |
|
|
-- |
-- |
Move clock and table to Townes 105 |
|
|
-- |
-- |
Move clock to Jerry's house, table to Townes 105 |
|
|
-- |
-- |
Trim guy confused on a Cole of doors |
|
|
-- |
-- |
Trim guy confused on a couple of doors |
|
|
-- |
-- |
Remove stuff |
Kate will coordinate with Tom ASAP |
|
-- |
-- |
Patch drywall on ceiling |
Interior Finishing |
|
-- |
-- |
Touch up paint |
Isaac |
|
-- |
-- |
Install bathroom vanity |
Alex |
|
-- |
-- |
Repair sliding glass door |
Osbaldo |
|
-- |
-- |
Repair master bedroom window |
Osbaldo |
|
-- |
-- |
Check temperature at master bathroom shower |
Osbaldo - check on it |
|
-- |
-- |
Install weather stripping at front door |
Osbaldo |
|
-- |
-- |
Remove ladder |
Osbaldo |
|
-- |
-- |
Fix four way light switch |
Alex |
|
-- |
-- |
Install side splash |
|
|
-- |
-- |
Add receptacle for microwave |
Tom |
|
-- |
-- |
Move pillows to storage container |
Osbaldo |
|
-- |
-- |
Install bed skirt on master bed |
Osbaldo |
|
-- |
-- |
Install screens |
Tom will pick up and install |
|
-- |
-- |
Move furniture to Heritage 5 |
Tues, Apr 3 |
|
-- |
-- |
Extend downspouts away from building |
Tom |
|
-- |
-- |
Install filter in the plenum at the furnace |
|
|
-- |
-- |
Make auxiliary heat work at the thermostat |
Ronnie is thinking about it |
|
-- |
-- |
Flip laundry connection box right side up and swap hot/cold indicators |
?????? |
|
-- |
-- |
Adjust bathroom vanity top installation with gaps between wall |
Osbaldo - caulk |
|
-- |
-- |
Install missing vent fan cover in bathroom |
Ronnie |
|
-- |
-- |
Repair exterior vent where grill is missing and flapper is stuck open. |
A bird was flying in/out - Tom |
|
-- |
-- |
Adjust main entry strike plate so that the door will lock properly |
Dead bolt |
|
-- |
-- |
Repair or replace master bedroom window - tilt lock mechanism not working properly |
Has arrived |
|
-- |
-- |
Install missing shoe molding behind the toilet and between tub and vanity |
Tom |
|
-- |
-- |
Touch up paint |
Kate will touch base with Isaac |
|
-- |
-- |
Alert Suzanne that (when) all repairs are complete |
On order from Mongers |
|
-- |
-- |
Building Permit (30) |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) |
|
|
-- |
-- |
Order Windows & Doors (0) |
|
|
-- |
-- |
Stake Out Home (1) |
|
|
-- |
-- |
Excavate (2) |
|
|
-- |
-- |
Inspection (Footers) (1) |
|
|
-- |
-- |
Pour Footers (1) * |
|
|
-- |
-- |
Set Forms (2) |
|
|
-- |
-- |
Pour Foundation Walls (1) |
|
|
-- |
-- |
Plumb Slab (2) |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) |
|
|
-- |
-- |
Prepare Slab (1) |
|
|
-- |
-- |
Inspection (Slab) (1) |
|
|
-- |
-- |
Pour Slab (1) * |
|
|
-- |
-- |
Framing I (9) |
|
|
-- |
-- |
Order Steps (0) |
|
|
-- |
-- |
Order Tubs / Showers (0) |
|
|
-- |
-- |
Framing II (8) |
|
|
-- |
-- |
Framing III (8) * |
|
|
-- |
-- |
Install Stairs (0) |
|
|
-- |
-- |
Windows & Doors (0) * |
|
|
-- |
-- |
House Number and Status in Window (0) |
|
|
-- |
-- |
Roofing (0) * |
|
|
-- |
-- |
Order Cabinets (0) |
|
|
-- |
-- |
Deck (0) |
|
|
-- |
-- |
Gutters (0) |
|
|
-- |
-- |
Driveway (0) * |
|
|
-- |
-- |
Privacy Divider / Fence (0) |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) |
|
|
-- |
-- |
HVAC Rough In (4) |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1) |
|
|
-- |
-- |
Plumbing Rough In (4) |
|
|
-- |
-- |
Electric Rough In (4) |
|
|
-- |
-- |
Exterior Vinyl (0) * |
|
|
-- |
-- |
Insulation (2) * |
|
|
-- |
-- |
Inspection (Insulation) (1) |
|
|
-- |
-- |
Inspection (Electric Service) (0) |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) |
|
|
-- |
-- |
Order Interior Doors & Trim (0) |
|
|
-- |
-- |
Drywall (Hang) (4) * |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * |
|
|
-- |
-- |
Paint 1 (1) |
|
|
-- |
-- |
Garage Door (0) * |
|
|
-- |
-- |
House Numbers (0) |
|
|
-- |
-- |
Cabinet Installation (2) * |
Delivery Dec 2, Installation Dec 5 |
|
-- |
-- |
Granite Installation (1) * |
Thurs Dec 15 |
|
-- |
-- |
Interior Trim - Install (3) * |
11/28 will be complete today. |
|
-- |
-- |
Luxury Vinyl Plank (3) * |
|
|
-- |
-- |
Luxury Vinyl Tile (0) |
In process |
|
-- |
-- |
Paint 2 (3) |
|
|
-- |
-- |
Cover Floors (1) |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Shoe Moulding (0) |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) * |
|
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) |
|
|
-- |
-- |
Electric Trim Out (3) |
|
|
-- |
-- |
HVAC Trim Out (1) |
|
|
-- |
-- |
Plumbing Trim Out (2) |
|
|
-- |
-- |
Install Appliances (0) * |
|
|
-- |
-- |
Paint 3 (2) * |
|
|
-- |
-- |
Carpet (2) |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) |
|
|
-- |
-- |
Inspection (Final Building) (2) * |
|
|
-- |
-- |
Pre Walk Through (0) |
|
|
-- |
-- |
Cleaning (1) |
|
|
-- |
-- |
Certificate of Occupancy (1) * |
|
|
-- |
-- |
C.O. to Lender (0) |
|
|
-- |
-- |
Buyer Walk Through (1) |
Tomorrow 4/24 at 10am |
|
-- |
-- |
Payment for Upgrades (0) |
|
|