- 201  ::  1270 Constitution Court #201
[ BUILD: 1805-0144 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
Tue    Apr 29      Ratified Contract? (0)      
Tue    Apr 29      $2500 Deposit Received (0)      
Tue    Apr 29      Association Packet Requested (0)      
Tue    Apr 29      Association Packet Received (0)      
Tue    Apr 29      Selections Meeting (0)      
Tue    Apr 29      Selections Sheet Signed (0)      
Tue    Apr 29      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Tue    Apr 29      Deposit For Upgrades Received (0)      
Tue    Apr 29      Inspection (Concrete Wall) (1)      
Wed    Apr 30      Inspection (Conduit Under Slab) (1)      
Thu    May 1      Inspection (Drain Tile) (0)      
Thu    May 1      Settlement Agent Confirmed (0)      
Thu    May 1      Verify Window & Roof Structure (0)      
Thu    May 1      Patio (0)      
Thu    May 1      Rough In Microwave Vent (0)      
Thu    May 1      Inspection (Rough In Plumbing) (1)      
Fri    May 2      Inspection (Rough In Electric) (1)      
Mon    May 5      Inspection (Deck Piers) (0)      
Mon    May 5      Inspection (Framing) (1) *       
Tue    May 6      Exterior Stone (0)      
Tue    May 6      Set Electric Meter (0) *       
Tue    May 6      Inspection (Main Water Line) (0)      
Tue    May 6      Loan Approval (0)      
Tue    May 6      Deed Preparation (0)      
Tue    May 6      Mailbox (0)      
Tue    May 6      Interior Trim - Paint (1)      
Wed    May 7      Ceiling Fans (0)      
Wed    May 7      Blower Door Test (1)      
Thu    May 8      Inspection (Final HVAC) (1)      
Fri    May 9      Inspection (Final Plumbing) (1)      
Mon    May 12      Inspection (Final Electric) (1)      
Tue    May 13      Stain Hardwood Stairs (1)      
Wed    May 14      Request Trash Tote From POA Manager (0)      
--   --   Electric trim out before final drywall 8/19
--   --   Kitchen needs painted 10/17
--   --   Flooring transition strips needed 10/17
--   --   Redo floor in Bath/laundry Eagle to lay 10/26 GWB
--   --   Cabinet hardware Midsouth Scheduling/ waiting on confirmed date
--   --   Drywall repairs 10/28 Tim to finish by 11/7
--   --   Bathroom trim needs installing 10/29
--   --   Pain door/trim 10/31
--   --   CODED LOCKBOX 0201
--   --  
--   --   Hook up water heater Harry Knows
--   --   Finish bathroom fan Harry knows
--   --   Screens
--   --   Final clean Kelly over weekend of 11/7 GWB
--   --   Paint over drywall patch Mahar set to come Monday 11/9
--   --   Remove orange sprinkler head in MB sprinkler people - Tom will contact
--   --   Outside light does not stay on
--   --   Patch drywall at sprinkler head
--   --   Remove items in living room
--   --   Condo unit outdoor lights Harry has the lights and needs to install them
--   --   LIght bulb needed in MB bathroom - Greg
--   --   Electric outlet-MB wiring exposed-cable? needs blank cover - Greg
--   --   Final test on sprinkler
--   --   Get heat up and running in all units Still need to set three more units
--   --  
--   --   Molding in closet needed Quarter round - Greg will talk to Majer
--   --   Toilet paper holder/clean completed 12/2
--   --   Protective film needs to be removed on deck white board trim completed
--   --   black paper sticking out underneath the patio door Kenny said he was fixing 2/3
--   --   Carpet/Trash on Deck completed
--   --   remove yellow caps off smoke detectors Greg will try to get this
--   --   nail down deck board/nails on front walkway Rick
--   --   remove housewrap from front windows Davenport
--   --   patch drywall around sprinkers Greg will talk to Majer
--   --   final touch up paint Blue taped and Mahar knows.
--   --   Fill nail holes at trim around windows set in rock Davenport
--   --   Drywall patch behind toilet in MB Galindez to touch up this week GWB
--   --   Caulk from tile/tub
--   --   gutter repairs
--   --  
--   --   Eagle-small piece missing flooring near patio 12/13
--   --   Front door handle is loose 12/13
--   --   Remove old sign posts 12/13
--   --  
--   --  
--   --   Cover on sprinkler head in MB
--   --   Crack/line in LR wall 1/13 Greg to blue tape
--   --   Front door handle loose 1/13 Ron to fix when he installs the next unit
--   --   Kelly reclean condo before walkthrough
--   --   Kelly to clean condo before walkthrough
--   --   Touch up paint Court has blue taped issues 1/23
--   --   Bill Tolbert, Lumos, 540-437-1206
--   --   Remove plastic from window 2/6
--   --   Dumpster
--   --   Fence by dumpster In process 2/17
--   --   MOVING MODEL TODAY AND CLEANING OVER WEEKEND
--   --   Paint touch up
--   --   Remove protective film from outside band board
--   --   Combo lock-repair? Replace?
--   --   Manuals needed 2/14
--   --   Patch and paint holes from wall hangings
--   --   Paint touch ups throughout pay special attention to areas at front door inside that need caulk and touch up Painter
--   --   Adjust master bath door Tom - does not lock
--   --   Cabinet drawer in hall bath needs adjusting
--   --   Left front bedroom window addressed drop lock on the right Lock to be adjusted
--   --   Order new fixed panel drawer at kitchen sink scratches that paint touch up doesn’t fix On site, ready for Tom to install
--   --   Drill hole through side of island....Tom how to fix? Back out screw a bit
--   --   Paint front door and trim
--   --   aanita0417@gmail.com 540 421 6486
--   --   Front door lock problem
--   --   One window does not lock Tom
-- -- Building Permit (30)      
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1) *       
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *       
-- -- Framing I (9)      
-- -- Order Steps (0)      
-- -- Order Tubs / Showers (0)      
-- -- Framing II (8)      
-- -- Framing III (8) *       
-- -- Install Stairs (0)      
-- -- Windows & Doors (0) *       
-- -- House Number and Status in Window (0)      
-- -- Roofing (0) *       
-- -- Order Cabinets (0)      
-- -- Order Appliances (0)      
-- -- Deck (0)      
-- -- Gutters (0)      
-- -- Driveway (0) *       
-- -- Privacy Divider / Fence (0)      
-- -- Sod / Seed / Landscaping (0)      
-- -- HVAC Rough In (4)      
-- -- Inspection (Rough In HVAC) (1)      
-- -- Plumbing Rough In (4)      
-- -- Electric Rough In (4)       Almost complete 6/14
-- -- Exterior Vinyl (0) *       
-- -- Insulation (2) *       
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)       Doors ordered. trim set to deliver 9/23 GWB
-- -- Drywall (Hang) (4) *        In process 9/2
-- -- Drywall (Tape, Block, Skim, Sand) (6) *        In process 9/13
-- -- Paint 1 (1)       Set to start 9/21 GWB
-- -- Garage Door (0) *       
-- -- House Numbers (0)      
-- -- Cabinet Installation (2) *       
-- -- Granite Installation (1) *        Set for 10/2 GWB
-- -- Interior Trim - Install (3) *        in process 9/30
-- -- Order Plumbing / Lighting Fixtures (0)       On site 10/28
-- -- Luxury Vinyl Plank (3) *        To start on Oct 1-in process 10/3
-- -- Luxury Vinyl Tile (0)      
-- -- Paint 2 (3)      
-- -- Cover Floors (1)      
-- -- Deliver Plumbing / Lighting Fixtures (0)      
-- -- Shoe Moulding (0)       On site 10/10
-- -- Shelving, Door Knobs, Fire Extinguisher (0) *        Need mirrors 11/4
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Set Water Meter (0) *        Main sprinkler valve connected. City to come 11/5 to turn on water
-- -- Electric Trim Out (3)       almost complete 10/29
-- -- HVAC Trim Out (1)      
-- -- Plumbing Trim Out (2)       Plumbers on site and installing 11/4
-- -- Install Appliances (0) *       
-- -- Paint 3 (2) *        Scheduled for 10/26 GWB
-- -- Carpet (2)      
-- -- Appraiser Confirms Construction Completion (0)      
-- -- Inspection (Final Building) (2) *        Waiting on sprinkler guy to connect with fire marshall
-- -- Pre Walk Through (0)      
-- -- Cleaning (1)      
-- -- Certificate of Occupancy (1) *       
-- -- C.O. to Lender (0)      
-- -- Schedule Closing (0)      
-- -- Buyer Walk Through (1)       Friday, Feb 26 at 1:00 PM;
-- -- Payment for Upgrades (0)      
-- -- Keys to Settlement Agent (0)      
-- -- Review Settlement Statement (0)      
-- -- Jerry Signs Closing Documents (0)       Stewart Title
-- -- Closing (1)       Mar 3 at 10:00 AM;
-- -- Remove Coded Lockbox (0)