| Mon | Dec 15 | Ratified Contract? (0) | ||
| Mon | Dec 15 | $2500 Deposit Received (0) | ||
| Mon | Dec 15 | Association Packet Requested (0) | ||
| Mon | Dec 15 | Association Packet Received (0) | ||
| Mon | Dec 15 | Selections Meeting (0) | ||
| Mon | Dec 15 | Selections Sheet Signed (0) | ||
| Mon | Dec 15 | Amendment for Upgrades (B,S,L,T,BCP) (0) | ||
| Mon | Dec 15 | Deposit For Upgrades Received (0) | ||
| Mon | Dec 15 | Inspection (Concrete Wall) (1) | ||
| Tue | Dec 16 | Inspection (Conduit Under Slab) (1) | ||
| Wed | Dec 17 | Inspection (Drain Tile) (0) | ||
| Wed | Dec 17 | Settlement Agent Confirmed (0) | ||
| Wed | Dec 17 | Verify Window & Roof Structure (0) | ||
| Wed | Dec 17 | Patio (0) | ||
| Wed | Dec 17 | Rough In Microwave Vent (0) | ||
| Wed | Dec 17 | Inspection (Rough In Plumbing) (1) | ||
| Thu | Dec 18 | Inspection (Rough In Electric) (1) | ||
| Fri | Dec 19 | Inspection (Framing) (1) * | ||
| Mon | Dec 22 | Inspection (Deck Piers) (0) | ||
| Mon | Dec 22 | Exterior Stone (0) | ||
| Mon | Dec 22 | Set Electric Meter (0) * | ||
| Mon | Dec 22 | Inspection (Main Water Line) (0) | ||
| Mon | Dec 22 | Loan Approval (0) | ||
| Mon | Dec 22 | Deed Preparation (0) | ||
| Mon | Dec 22 | Mailbox (0) | ||
| Mon | Dec 22 | Interior Trim - Paint (1) | ||
| Tue | Dec 23 | Ceiling Fans (0) | ||
| Tue | Dec 23 | Blower Door Test (1) | ||
| Wed | Dec 24 | Inspection (Final HVAC) (1) | ||
| Thu | Dec 25 | Inspection (Final Plumbing) (1) | ||
| Fri | Dec 26 | Inspection (Final Electric) (1) | ||
| Mon | Dec 29 | Stain Hardwood Stairs (1) * | ||
| Tue | Dec 30 | Request Trash Tote From POA Manager (0) | ||
| -- | -- | Electric trim out before final drywall 8/19 | ||
| -- | -- | Kitchen needs painted 10/17 | ||
| -- | -- | Flooring transition strips needed 10/17 | ||
| -- | -- | Redo floor in Bath/laundry | Eagle to lay 10/26 GWB | |
| -- | -- | Cabinet hardware | Midsouth Scheduling/ waiting on confirmed date | |
| -- | -- | Drywall repairs 10/28 | Tim to finish by 11/7 | |
| -- | -- | Bathroom trim needs installing 10/29 | ||
| -- | -- | Pain door/trim 10/31 | ||
| -- | -- | CODED LOCKBOX 0201 | ||
| -- | -- | |||
| -- | -- | Hook up water heater | Harry Knows | |
| -- | -- | Finish bathroom fan | Harry knows | |
| -- | -- | Screens | ||
| -- | -- | Final clean | Kelly over weekend of 11/7 GWB | |
| -- | -- | Paint over drywall patch | Mahar set to come Monday 11/9 | |
| -- | -- | Remove orange sprinkler head in MB | sprinkler people - Tom will contact | |
| -- | -- | Outside light does not stay on | ||
| -- | -- | Patch drywall at sprinkler head | ||
| -- | -- | Remove items in living room | ||
| -- | -- | Condo unit outdoor lights | Harry has the lights and needs to install them | |
| -- | -- | LIght bulb needed in MB | bathroom - Greg | |
| -- | -- | Electric outlet-MB wiring exposed-cable? | needs blank cover - Greg | |
| -- | -- | Final test on sprinkler | ||
| -- | -- | Get heat up and running in all units | Still need to set three more units | |
| -- | -- | |||
| -- | -- | Molding in closet needed | Quarter round - Greg will talk to Majer | |
| -- | -- | Toilet paper holder/clean | completed 12/2 | |
| -- | -- | Protective film needs to be removed on deck white board trim | completed | |
| -- | -- | black paper sticking out underneath the patio door | Kenny said he was fixing 2/3 | |
| -- | -- | Carpet/Trash on Deck | completed | |
| -- | -- | remove yellow caps off smoke detectors | Greg will try to get this | |
| -- | -- | nail down deck board/nails on front walkway | Rick | |
| -- | -- | remove housewrap from front windows | Davenport | |
| -- | -- | patch drywall around sprinkers | Greg will talk to Majer | |
| -- | -- | final touch up paint | Blue taped and Mahar knows. | |
| -- | -- | Fill nail holes at trim around windows set in rock | Davenport | |
| -- | -- | Drywall patch behind toilet in MB | Galindez to touch up this week GWB | |
| -- | -- | Caulk from tile/tub | ||
| -- | -- | gutter repairs | ||
| -- | -- | |||
| -- | -- | Eagle-small piece missing flooring near patio 12/13 | ||
| -- | -- | Front door handle is loose 12/13 | ||
| -- | -- | Remove old sign posts 12/13 | ||
| -- | -- | |||
| -- | -- | |||
| -- | -- | Cover on sprinkler head in MB | ||
| -- | -- | Crack/line in LR wall 1/13 | Greg to blue tape | |
| -- | -- | Front door handle loose 1/13 | Ron to fix when he installs the next unit | |
| -- | -- | Kelly reclean condo before walkthrough | ||
| -- | -- | Kelly to clean condo before walkthrough | ||
| -- | -- | Touch up paint | Court has blue taped issues 1/23 | |
| -- | -- | Bill Tolbert, Lumos, 540-437-1206 | ||
| -- | -- | Remove plastic from window 2/6 | ||
| -- | -- | Dumpster | ||
| -- | -- | Fence by dumpster | In process 2/17 | |
| -- | -- | MOVING MODEL TODAY AND CLEANING OVER WEEKEND | ||
| -- | -- | Paint touch up | ||
| -- | -- | Remove protective film from outside band board | ||
| -- | -- | Combo lock-repair? | Replace? | |
| -- | -- | Manuals needed 2/14 | ||
| -- | -- | Patch and paint holes from wall hangings | ||
| -- | -- | Paint touch ups throughout pay special attention to areas at front door inside that need caulk and touch up | Painter | |
| -- | -- | Adjust master bath door | Tom - does not lock | |
| -- | -- | Cabinet drawer in hall bath needs adjusting | ||
| -- | -- | Left front bedroom window addressed drop lock on the right | Lock to be adjusted | |
| -- | -- | Order new fixed panel drawer at kitchen sink scratches that paint touch up doesn’t fix | On site, ready for Tom to install | |
| -- | -- | Drill hole through side of island....Tom how to fix? | Back out screw a bit | |
| -- | -- | Paint front door and trim | ||
| -- | -- | aanita0417@gmail.com 540 421 6486 | ||
| -- | -- | Front door lock problem | ||
| -- | -- | One window does not lock | Tom | |
| -- | -- | Building Permit (30) * | ||
| -- | -- | Order Roof & Floor Trusses (1) | ||
| -- | -- | Order Windows & Doors (0) | ||
| -- | -- | Stake Out Home (1) | ||
| -- | -- | Excavate (2) | ||
| -- | -- | Inspection (Footers) (1) | ||
| -- | -- | Pour Footers (1) * | ||
| -- | -- | Set Forms (2) | ||
| -- | -- | Pour Foundation Walls (1) | ||
| -- | -- | Plumb Slab (2) | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) | ||
| -- | -- | Prepare Slab (1) | ||
| -- | -- | Inspection (Slab) (1) | ||
| -- | -- | Pour Slab (1) * | ||
| -- | -- | Framing I (9) | ||
| -- | -- | Order Steps (0) | ||
| -- | -- | Order Tubs / Showers (0) | ||
| -- | -- | Framing II (8) | ||
| -- | -- | Framing III (8) * | ||
| -- | -- | Install Stairs (0) * | ||
| -- | -- | Windows & Doors (0) * | ||
| -- | -- | House Number and Status in Window (0) | ||
| -- | -- | Roofing (0) * | ||
| -- | -- | Order Cabinets (0) | ||
| -- | -- | Order Appliances (0) | ||
| -- | -- | Deck (0) | ||
| -- | -- | Gutters (0) | ||
| -- | -- | Driveway (0) * | ||
| -- | -- | Privacy Divider / Fence (0) * | ||
| -- | -- | Sod / Seed / Landscaping (0) | ||
| -- | -- | HVAC Rough In (4) | ||
| -- | -- | Plumbing Rough In (4) | ||
| -- | -- | Electric Rough In (4) | Almost complete 6/14 | |
| -- | -- | Inspection (Rough In HVAC) (1) | ||
| -- | -- | Exterior Vinyl (0) * | ||
| -- | -- | Insulation (2) * | ||
| -- | -- | Inspection (Insulation) (1) | ||
| -- | -- | Inspection (Electric Service) (0) | ||
| -- | -- | Inspection (Main Sewer Line) (0) | ||
| -- | -- | Order Interior Doors & Trim (0) | Doors ordered. trim set to deliver 9/23 GWB | |
| -- | -- | Drywall (Hang) (4) * | In process 9/2 | |
| -- | -- | Drywall (Tape, Block, Skim, Sand) (6) * | In process 9/13 | |
| -- | -- | Paint 1 (1) | Set to start 9/21 GWB | |
| -- | -- | Garage Door (0) | ||
| -- | -- | House Numbers (0) | ||
| -- | -- | Cabinet Installation (2) * | ||
| -- | -- | Granite Installation (1) * | Set for 10/2 GWB | |
| -- | -- | Interior Trim - Install (3) * | in process 9/30 | |
| -- | -- | Order Plumbing / Lighting Fixtures (0) | On site 10/28 | |
| -- | -- | Luxury Vinyl Plank (3) * | To start on Oct 1-in process 10/3 | |
| -- | -- | Luxury Vinyl Tile (0) | ||
| -- | -- | Paint 2 (3) | ||
| -- | -- | Cover Floors (1) | ||
| -- | -- | Deliver Plumbing / Lighting Fixtures (0) | ||
| -- | -- | Shoe Moulding (0) | On site 10/10 | |
| -- | -- | Shelving, Door Knobs, Fire Extinguisher (0) * | Need mirrors 11/4 | |
| -- | -- | Install Coded Lockbox (add extra keys) (0) | ||
| -- | -- | Pay Water / Sewer Taps (0) | ||
| -- | -- | Set Water Meter (0) * | Main sprinkler valve connected. City to come 11/5 to turn on water | |
| -- | -- | Electric Trim Out (3) * | almost complete 10/29 | |
| -- | -- | HVAC Trim Out (1) * | ||
| -- | -- | Plumbing Trim Out (2) * | Plumbers on site and installing 11/4 | |
| -- | -- | Install Appliances (0) * | ||
| -- | -- | Paint 3 (2) * | Scheduled for 10/26 GWB | |
| -- | -- | Carpet (2) | ||
| -- | -- | Appraiser Confirms Construction Completion (0) | ||
| -- | -- | Inspection (Final Building) (2) * | Waiting on sprinkler guy to connect with fire marshall | |
| -- | -- | Pre Walk Through (0) | ||
| -- | -- | Cleaning (1) | ||
| -- | -- | Certificate of Occupancy (1) * | ||
| -- | -- | C.O. to Lender (0) | ||
| -- | -- | Schedule Closing (0) | ||
| -- | -- | Buyer Walk Through (1) * | Friday, Feb 26 at 1:00 PM; | |
| -- | -- | Payment for Upgrades (0) | ||
| -- | -- | Keys to Settlement Agent (0) | ||
| -- | -- | Review Settlement Statement (0) | ||
| -- | -- | Jerry Signs Closing Documents (0) | Stewart Title | |
| -- | -- | Closing (1) | Mar 3 at 10:00 AM; | |
| -- | -- | Remove Coded Lockbox (0) | ||