Tue |
Apr 29 |
Ratified Contract? (0) |
|
|
Tue |
Apr 29 |
$2500 Deposit Received (0) |
|
|
Tue |
Apr 29 |
Association Packet Requested (0) |
|
|
Tue |
Apr 29 |
Association Packet Received (0) |
|
|
Tue |
Apr 29 |
Selections Meeting (0) |
|
|
Tue |
Apr 29 |
Selections Sheet Signed (0) |
|
|
Tue |
Apr 29 |
Amendment for Upgrades (B,S,L,T,BCP) (0) |
|
|
Tue |
Apr 29 |
Deposit For Upgrades Received (0) |
|
|
Tue |
Apr 29 |
Inspection (Concrete Wall) (1) |
|
|
Wed |
Apr 30 |
Inspection (Conduit Under Slab) (1) |
|
|
Thu |
May 1 |
Inspection (Drain Tile) (0) |
|
|
Thu |
May 1 |
Settlement Agent Confirmed (0) |
|
|
Thu |
May 1 |
Verify Window & Roof Structure (0) |
|
|
Thu |
May 1 |
Patio (0) |
|
|
Thu |
May 1 |
Rough In Microwave Vent (0) |
|
|
Thu |
May 1 |
Inspection (Rough In Plumbing) (1) |
|
|
Fri |
May 2 |
Inspection (Rough In Electric) (1) |
|
|
Mon |
May 5 |
Inspection (Deck Piers) (0) |
|
|
Mon |
May 5 |
Inspection (Framing) (1) * |
|
|
Tue |
May 6 |
Exterior Stone (0) |
|
|
Tue |
May 6 |
Set Electric Meter (0) * |
|
|
Tue |
May 6 |
Inspection (Main Water Line) (0) |
|
|
Tue |
May 6 |
Loan Approval (0) |
|
|
Tue |
May 6 |
Deed Preparation (0) |
|
|
Tue |
May 6 |
Mailbox (0) |
|
|
Tue |
May 6 |
Interior Trim - Paint (1) |
|
|
Wed |
May 7 |
Ceiling Fans (0) |
|
|
Wed |
May 7 |
Blower Door Test (1) |
|
|
Thu |
May 8 |
Inspection (Final HVAC) (1) |
|
|
Fri |
May 9 |
Inspection (Final Plumbing) (1) |
|
|
Mon |
May 12 |
Inspection (Final Electric) (1) |
|
|
Tue |
May 13 |
Stain Hardwood Stairs (1) |
|
|
Wed |
May 14 |
Request Trash Tote From POA Manager (0) |
|
|
|
-- |
-- |
Electric trim out before final drywall 8/19 |
|
|
-- |
-- |
Kitchen needs painted 10/17 |
|
|
-- |
-- |
Flooring transition strips needed 10/17 |
|
|
-- |
-- |
Redo floor in Bath/laundry |
Eagle to lay 10/26 GWB |
|
-- |
-- |
Cabinet hardware |
Midsouth Scheduling/ waiting on confirmed date |
|
-- |
-- |
Drywall repairs 10/28 |
Tim to finish by 11/7 |
|
-- |
-- |
Bathroom trim needs installing 10/29 |
|
|
-- |
-- |
Pain door/trim 10/31 |
|
|
-- |
-- |
CODED LOCKBOX 0201 |
|
|
-- |
-- |
|
|
|
-- |
-- |
Hook up water heater |
Harry Knows |
|
-- |
-- |
Finish bathroom fan |
Harry knows |
|
-- |
-- |
Screens |
|
|
-- |
-- |
Final clean |
Kelly over weekend of 11/7 GWB |
|
-- |
-- |
Paint over drywall patch |
Mahar set to come Monday 11/9 |
|
-- |
-- |
Remove orange sprinkler head in MB |
sprinkler people - Tom will contact |
|
-- |
-- |
Outside light does not stay on |
|
|
-- |
-- |
Patch drywall at sprinkler head |
|
|
-- |
-- |
Remove items in living room |
|
|
-- |
-- |
Condo unit outdoor lights |
Harry has the lights and needs to install them |
|
-- |
-- |
LIght bulb needed in MB |
bathroom - Greg |
|
-- |
-- |
Electric outlet-MB wiring exposed-cable? |
needs blank cover - Greg |
|
-- |
-- |
Final test on sprinkler |
|
|
-- |
-- |
Get heat up and running in all units |
Still need to set three more units |
|
-- |
-- |
|
|
|
-- |
-- |
Molding in closet needed |
Quarter round - Greg will talk to Majer |
|
-- |
-- |
Toilet paper holder/clean |
completed 12/2 |
|
-- |
-- |
Protective film needs to be removed on deck white board trim |
completed |
|
-- |
-- |
black paper sticking out underneath the patio door |
Kenny said he was fixing 2/3 |
|
-- |
-- |
Carpet/Trash on Deck |
completed |
|
-- |
-- |
remove yellow caps off smoke detectors |
Greg will try to get this |
|
-- |
-- |
nail down deck board/nails on front walkway |
Rick |
|
-- |
-- |
remove housewrap from front windows |
Davenport |
|
-- |
-- |
patch drywall around sprinkers |
Greg will talk to Majer |
|
-- |
-- |
final touch up paint |
Blue taped and Mahar knows. |
|
-- |
-- |
Fill nail holes at trim around windows set in rock |
Davenport |
|
-- |
-- |
Drywall patch behind toilet in MB |
Galindez to touch up this week GWB |
|
-- |
-- |
Caulk from tile/tub |
|
|
-- |
-- |
gutter repairs |
|
|
-- |
-- |
|
|
|
-- |
-- |
Eagle-small piece missing flooring near patio 12/13 |
|
|
-- |
-- |
Front door handle is loose 12/13 |
|
|
-- |
-- |
Remove old sign posts 12/13 |
|
|
-- |
-- |
|
|
|
-- |
-- |
|
|
|
-- |
-- |
Cover on sprinkler head in MB |
|
|
-- |
-- |
Crack/line in LR wall 1/13 |
Greg to blue tape |
|
-- |
-- |
Front door handle loose 1/13 |
Ron to fix when he installs the next unit |
|
-- |
-- |
Kelly reclean condo before walkthrough |
|
|
-- |
-- |
Kelly to clean condo before walkthrough |
|
|
-- |
-- |
Touch up paint |
Court has blue taped issues 1/23 |
|
-- |
-- |
Bill Tolbert, Lumos, 540-437-1206 |
|
|
-- |
-- |
Remove plastic from window 2/6 |
|
|
-- |
-- |
Dumpster |
|
|
-- |
-- |
Fence by dumpster |
In process 2/17 |
|
-- |
-- |
MOVING MODEL TODAY AND CLEANING OVER WEEKEND |
|
|
-- |
-- |
Paint touch up |
|
|
-- |
-- |
Remove protective film from outside band board |
|
|
-- |
-- |
Combo lock-repair? |
Replace? |
|
-- |
-- |
Manuals needed 2/14 |
|
|
-- |
-- |
Patch and paint holes from wall hangings |
|
|
-- |
-- |
Paint touch ups throughout pay special attention to areas at front door inside that need caulk and touch up |
Painter |
|
-- |
-- |
Adjust master bath door |
Tom - does not lock |
|
-- |
-- |
Cabinet drawer in hall bath needs adjusting |
|
|
-- |
-- |
Left front bedroom window addressed drop lock on the right |
Lock to be adjusted |
|
-- |
-- |
Order new fixed panel drawer at kitchen sink scratches that paint touch up doesn’t fix |
On site, ready for Tom to install |
|
-- |
-- |
Drill hole through side of island....Tom how to fix? |
Back out screw a bit |
|
-- |
-- |
Paint front door and trim |
|
|
-- |
-- |
aanita0417@gmail.com 540 421 6486 |
|
|
-- |
-- |
Front door lock problem |
|
|
-- |
-- |
One window does not lock |
Tom |
|
-- |
-- |
Building Permit (30) |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) |
|
|
-- |
-- |
Order Windows & Doors (0) |
|
|
-- |
-- |
Stake Out Home (1) |
|
|
-- |
-- |
Excavate (2) |
|
|
-- |
-- |
Inspection (Footers) (1) |
|
|
-- |
-- |
Pour Footers (1) * |
|
|
-- |
-- |
Set Forms (2) |
|
|
-- |
-- |
Pour Foundation Walls (1) |
|
|
-- |
-- |
Plumb Slab (2) |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) |
|
|
-- |
-- |
Prepare Slab (1) |
|
|
-- |
-- |
Inspection (Slab) (1) |
|
|
-- |
-- |
Pour Slab (1) * |
|
|
-- |
-- |
Framing I (9) |
|
|
-- |
-- |
Order Steps (0) |
|
|
-- |
-- |
Order Tubs / Showers (0) |
|
|
-- |
-- |
Framing II (8) |
|
|
-- |
-- |
Framing III (8) * |
|
|
-- |
-- |
Install Stairs (0) |
|
|
-- |
-- |
Windows & Doors (0) * |
|
|
-- |
-- |
House Number and Status in Window (0) |
|
|
-- |
-- |
Roofing (0) * |
|
|
-- |
-- |
Order Cabinets (0) |
|
|
-- |
-- |
Order Appliances (0) |
|
|
-- |
-- |
Deck (0) |
|
|
-- |
-- |
Gutters (0) |
|
|
-- |
-- |
Driveway (0) * |
|
|
-- |
-- |
Privacy Divider / Fence (0) |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) |
|
|
-- |
-- |
HVAC Rough In (4) |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1) |
|
|
-- |
-- |
Plumbing Rough In (4) |
|
|
-- |
-- |
Electric Rough In (4) |
Almost complete 6/14 |
|
-- |
-- |
Exterior Vinyl (0) * |
|
|
-- |
-- |
Insulation (2) * |
|
|
-- |
-- |
Inspection (Insulation) (1) |
|
|
-- |
-- |
Inspection (Electric Service) (0) |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) |
|
|
-- |
-- |
Order Interior Doors & Trim (0) |
Doors ordered. trim set to deliver 9/23 GWB |
|
-- |
-- |
Drywall (Hang) (4) * |
In process 9/2 |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * |
In process 9/13 |
|
-- |
-- |
Paint 1 (1) |
Set to start 9/21 GWB |
|
-- |
-- |
Garage Door (0) * |
|
|
-- |
-- |
House Numbers (0) |
|
|
-- |
-- |
Cabinet Installation (2) * |
|
|
-- |
-- |
Granite Installation (1) * |
Set for 10/2 GWB |
|
-- |
-- |
Interior Trim - Install (3) * |
in process 9/30 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) |
On site 10/28 |
|
-- |
-- |
Luxury Vinyl Plank (3) * |
To start on Oct 1-in process 10/3 |
|
-- |
-- |
Luxury Vinyl Tile (0) |
|
|
-- |
-- |
Paint 2 (3) |
|
|
-- |
-- |
Cover Floors (1) |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Shoe Moulding (0) |
On site 10/10 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) * |
Need mirrors 11/4 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) |
|
|
-- |
-- |
Set Water Meter (0) * |
Main sprinkler valve connected. City to come 11/5 to turn on water |
|
-- |
-- |
Electric Trim Out (3) |
almost complete 10/29 |
|
-- |
-- |
HVAC Trim Out (1) |
|
|
-- |
-- |
Plumbing Trim Out (2) |
Plumbers on site and installing 11/4 |
|
-- |
-- |
Install Appliances (0) * |
|
|
-- |
-- |
Paint 3 (2) * |
Scheduled for 10/26 GWB |
|
-- |
-- |
Carpet (2) |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) |
|
|
-- |
-- |
Inspection (Final Building) (2) * |
Waiting on sprinkler guy to connect with fire marshall |
|
-- |
-- |
Pre Walk Through (0) |
|
|
-- |
-- |
Cleaning (1) |
|
|
-- |
-- |
Certificate of Occupancy (1) * |
|
|
-- |
-- |
C.O. to Lender (0) |
|
|
-- |
-- |
Schedule Closing (0) |
|
|
-- |
-- |
Buyer Walk Through (1) |
Friday, Feb 26 at 1:00 PM; |
|
-- |
-- |
Payment for Upgrades (0) |
|
|
-- |
-- |
Keys to Settlement Agent (0) |
|
|
-- |
-- |
Review Settlement Statement (0) |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) |
Stewart Title |
|
-- |
-- |
Closing (1) |
Mar 3 at 10:00 AM; |
|
-- |
-- |
Remove Coded Lockbox (0) |
|
|