Tue |
Apr 29 |
Ratified Contract? (0) |
|
|
Tue |
Apr 29 |
$2500 Deposit Received (0) |
|
|
Tue |
Apr 29 |
Association Packet Requested (0) |
|
|
Tue |
Apr 29 |
Association Packet Received (0) |
|
|
Tue |
Apr 29 |
Selections Meeting (0) |
|
|
Tue |
Apr 29 |
Selections Sheet Signed (0) |
|
|
Tue |
Apr 29 |
Amendment for Upgrades (B,S,L,T,BCP) (0) |
|
|
Tue |
Apr 29 |
Deposit For Upgrades Received (0) |
|
|
Tue |
Apr 29 |
Inspection (Concrete Wall) (1) |
|
|
Wed |
Apr 30 |
Inspection (Conduit Under Slab) (1) |
|
|
Thu |
May 1 |
Inspection (Drain Tile) (0) |
|
|
Thu |
May 1 |
Settlement Agent Confirmed (0) |
|
|
Thu |
May 1 |
Verify Window & Roof Structure (0) |
|
|
Thu |
May 1 |
Patio (0) |
|
|
Thu |
May 1 |
Rough In Microwave Vent (0) |
|
|
Thu |
May 1 |
Inspection (Rough In Plumbing) (1) |
|
|
Fri |
May 2 |
Inspection (Rough In Electric) (1) |
|
|
Mon |
May 5 |
Inspection (Deck Piers) (0) |
|
|
Mon |
May 5 |
Inspection (Framing) (1) * |
|
|
Tue |
May 6 |
Exterior Stone (0) |
|
|
Tue |
May 6 |
Set Electric Meter (0) * |
|
|
Tue |
May 6 |
Inspection (Main Water Line) (0) |
|
|
Tue |
May 6 |
Loan Approval (0) |
|
|
Tue |
May 6 |
Deed Preparation (0) |
|
|
Tue |
May 6 |
Mailbox (0) |
|
|
Tue |
May 6 |
Interior Trim - Paint (1) |
|
|
Wed |
May 7 |
Ceiling Fans (0) |
|
|
Wed |
May 7 |
Blower Door Test (1) |
|
|
Thu |
May 8 |
Inspection (Final HVAC) (1) |
|
|
Fri |
May 9 |
Inspection (Final Plumbing) (1) |
|
|
Mon |
May 12 |
Inspection (Final Electric) (1) |
|
|
Tue |
May 13 |
Stain Hardwood Stairs (1) |
|
|
Wed |
May 14 |
Request Trash Tote From POA Manager (0) |
|
|
|
-- |
-- |
Electric trim out (final) before remaining drywall 8/19 |
|
|
-- |
-- |
5 3/4 from vent to bottom of wide molding |
21 1/2 width |
|
-- |
-- |
Crack in ceiling drywall 10/14 |
|
|
-- |
-- |
Ceiling hole? 10/21 |
|
|
-- |
-- |
CODED LOCKBOX 0301 |
|
|
-- |
-- |
Bathroom floors-first week of January |
|
|
-- |
-- |
Buyer is providing the kitchen sink |
Should arrive to Tom on 1/5 |
|
-- |
-- |
Buyer would like to swap granite for CM in bathrooms. Can we reuse CM in 303? |
|
|
-- |
-- |
Move cultured marble bathroom tops to 303 |
(Kate will confirm) |
|
-- |
-- |
Re-paint ceiling |
Galindez touch up 1/27. GWB Blue taped whole condo as well. |
|
-- |
-- |
Electric trim out should be done 1/6 |
Almost done. Vanity lights after plumbers. 1/13 |
|
-- |
-- |
Trim in bath needed 1/5 |
Galindez to finish when they come paint GWB |
|
-- |
-- |
Transfer strips at LVT |
Eric does not stock. Greg will get from lowes 1/21and have Eric install GWB |
|
-- |
-- |
sprinkler head needed near front door? 1/13 |
|
|
-- |
-- |
Replace siding piece above door where there is no sprinkler |
|
|
-- |
-- |
install microwave 1/16 |
On site 1/20 |
|
-- |
-- |
repair hole n siding by front door 1/16 |
|
|
-- |
-- |
Kitchen sink faucet is partially in 1/23 |
|
|
-- |
-- |
Screens |
In process 2/3 |
|
-- |
-- |
Weather stripping at door 1/23 |
|
|
-- |
-- |
Cabinet trim 2/3 |
Needed in bathrooms at vanities. Not done 2/6 |
|
-- |
-- |
2 more screen doors-at CC? |
Tom-needs one 2/17 |
|
-- |
-- |
Shower rod-4 in condo 2/3 |
|
|
-- |
-- |
Chunk missing from bottom edge of upper kitchen cabinet |
Jill will talk to the painter about patching this |
|
-- |
-- |
Add bass shoe molding in master bathroom and hall bathroom |
|
|
-- |
-- |
Paint touch ups throughout |
|
|
-- |
-- |
Replace two ripped screens in master bedroom |
|
|
-- |
-- |
Replace return air grill in living room |
Ronnie, 2/15 |
|
-- |
-- |
Replace cool light bulb with warm lightbulb in pendant light |
Jill, 2/15 |
|
-- |
-- |
Final touch up clean |
|
|
-- |
-- |
Add snap light over shower |
|
|
-- |
-- |
Freezer broken? Leaking water? 2/10 |
Looks cleaned up-but dripping a little 2/14 |
|
-- |
-- |
Screws are missing at the low voltage box |
Tom |
|
-- |
-- |
Loose flooring transition strip |
Tom |
|
-- |
-- |
Sand and repaint in living room |
Isaac |
|
-- |
-- |
Clean again after sanding and repainting |
Kelly |
|
-- |
-- |
Caulk at the door frame by low voltage panel |
Isaac |
|
-- |
-- |
Building Permit (30) |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) |
|
|
-- |
-- |
Order Windows & Doors (0) |
|
|
-- |
-- |
Stake Out Home (1) |
|
|
-- |
-- |
Excavate (2) |
|
|
-- |
-- |
Inspection (Footers) (1) |
|
|
-- |
-- |
Pour Footers (1) * |
|
|
-- |
-- |
Set Forms (2) |
|
|
-- |
-- |
Pour Foundation Walls (1) |
|
|
-- |
-- |
Plumb Slab (2) |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) |
|
|
-- |
-- |
Prepare Slab (1) |
|
|
-- |
-- |
Inspection (Slab) (1) |
|
|
-- |
-- |
Pour Slab (1) * |
|
|
-- |
-- |
Framing I (9) |
|
|
-- |
-- |
Order Steps (0) |
|
|
-- |
-- |
Order Tubs / Showers (0) |
|
|
-- |
-- |
Framing II (8) |
|
|
-- |
-- |
Framing III (8) * |
|
|
-- |
-- |
Install Stairs (0) |
|
|
-- |
-- |
Windows & Doors (0) * |
|
|
-- |
-- |
House Number and Status in Window (0) |
|
|
-- |
-- |
Roofing (0) * |
|
|
-- |
-- |
Order Cabinets (0) |
|
|
-- |
-- |
Order Appliances (0) |
|
|
-- |
-- |
Deck (0) |
|
|
-- |
-- |
Gutters (0) |
|
|
-- |
-- |
Driveway (0) * |
|
|
-- |
-- |
Privacy Divider / Fence (0) |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) |
|
|
-- |
-- |
HVAC Rough In (4) |
Almost complete 5/25 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) |
|
|
-- |
-- |
Plumbing Rough In (4) |
|
|
-- |
-- |
Electric Rough In (4) |
|
|
-- |
-- |
Exterior Vinyl (0) * |
|
|
-- |
-- |
Insulation (2) * |
|
|
-- |
-- |
Inspection (Insulation) (1) |
|
|
-- |
-- |
Inspection (Electric Service) (0) |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) |
|
|
-- |
-- |
Order Interior Doors & Trim (0) |
|
|
-- |
-- |
Drywall (Hang) (4) * |
In process 9/2 |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * |
Set to finish 9/22 GWB |
|
-- |
-- |
Paint 1 (1) |
set to start 10/2 - they are finished 201 then 101 first GWB |
|
-- |
-- |
Garage Door (0) * |
|
|
-- |
-- |
House Numbers (0) |
|
|
-- |
-- |
Cabinet Installation (2) * |
|
|
-- |
-- |
Granite Installation (1) * |
Set to install 1/12 GWB |
|
-- |
-- |
Interior Trim - Install (3) * |
Almost complete 10/10 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * |
Set to start Oct. 1 GWB-in process 10/14 |
|
-- |
-- |
Luxury Vinyl Tile (0) |
Installed. Just need transfer strips GWB |
|
-- |
-- |
Paint 2 (3) |
|
|
-- |
-- |
Cover Floors (1) |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) |
Plumbing delivered 10/28 |
|
-- |
-- |
Shoe Moulding (0) |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) * |
In process 10/24 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) |
|
|
-- |
-- |
Set Water Meter (0) * |
|
|
-- |
-- |
Electric Trim Out (3) |
In process 12/6, 12/28 |
|
-- |
-- |
HVAC Trim Out (1) |
|
|
-- |
-- |
Plumbing Trim Out (2) |
Completed except kitchen sink 1/20 Counter getting fixed 1/21 GWB |
|
-- |
-- |
Install Appliances (0) * |
Waiting on tops. Appliances stored I n unit 202 GWB |
|
-- |
-- |
Paint 3 (2) * |
scheduled for later this week 1/21 GWB |
|
-- |
-- |
Carpet (2) |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) |
|
|
-- |
-- |
Inspection (Final Building) (2) * |
Waiting on re-inspect |
|
-- |
-- |
Pre Walk Through (0) |
|
|
-- |
-- |
Cleaning (1) |
In process 1/27, Kelly |
|
-- |
-- |
Certificate of Occupancy (1) * |
|
|
-- |
-- |
C.O. to Lender (0) |
|
|
-- |
-- |
Schedule Closing (0) |
|
|
-- |
-- |
Buyer Walk Through (1) |
Wednesday, 2/10/2021 @ 9:00 AM? |
|
-- |
-- |
Payment for Upgrades (0) |
|
|
-- |
-- |
Keys to Settlement Agent (0) |
|
|
-- |
-- |
Review Settlement Statement (0) |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) |
|
|
-- |
-- |
Closing (1) |
Friday, Feb 17 at 10:30 AM at WVT; |
|
-- |
-- |
Remove Coded Lockbox (0) |
Courtney to remove 2/27 |
|