- 2  ::  1280 Constitution Court #301
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
--   --   Paint stair railing; fill and paint holes near handle attachment Isaac
--   --   Install air filter and inspect coil (low airflow) Osbaldo or Ronnie?
--   --   Final cleaning Tuesday 6/20
Mon    Dec 15      Ratified Contract? (0)      
Mon    Dec 15      $2500 Deposit Received (0)      
Mon    Dec 15      Association Packet Requested (0)      
Mon    Dec 15      Association Packet Received (0)      
Mon    Dec 15      Selections Meeting (0)      
Mon    Dec 15      Selections Sheet Signed (0)      
Mon    Dec 15      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Mon    Dec 15      Deposit For Upgrades Received (0)      
Mon    Dec 15      Inspection (Concrete Wall) (1)      
Tue    Dec 16      Inspection (Conduit Under Slab) (1)      
Wed    Dec 17      Inspection (Drain Tile) (0)      
Wed    Dec 17      Settlement Agent Confirmed (0)      
Wed    Dec 17      Order Tubs / Showers (0)      
Wed    Dec 17      Verify Window & Roof Structure (0)      
Wed    Dec 17      Install Stairs (0) *       
Wed    Dec 17      House Number and Status in Window (0)      
Wed    Dec 17      Order Appliances (0)      
Wed    Dec 17      Patio (0)      
Wed    Dec 17      Rough In Microwave Vent (0)      
Wed    Dec 17      Inspection (Rough In Plumbing) (1)      
Thu    Dec 18      Inspection (Rough In Electric) (1)      
Fri    Dec 19      Inspection (Framing) (1) *       
Mon    Dec 22      Inspection (Deck Piers) (0)      
Mon    Dec 22      Exterior Stone (0)      
Mon    Dec 22      Set Electric Meter (0) *       
Mon    Dec 22      Inspection (Main Water Line) (0)      
Mon    Dec 22      Loan Approval (0)      
Mon    Dec 22      Deed Preparation (0)      
Mon    Dec 22      Garage Door (0)      
Mon    Dec 22      Mailbox (0)      
Mon    Dec 22      Order Plumbing / Lighting Fixtures (0)      
Mon    Dec 22      Interior Trim - Paint (1)      
Tue    Dec 23      Deliver Plumbing / Lighting Fixtures (0)      
Tue    Dec 23      Shoe Moulding (0)      
Tue    Dec 23      Install Coded Lockbox (add extra keys) (0)      
Tue    Dec 23      Set Water Meter (0) *       
Tue    Dec 23      Ceiling Fans (0)      
Tue    Dec 23      Blower Door Test (1)      
Wed    Dec 24      Paint 3 (2) *       
Fri    Dec 26      Appraiser Confirms Construction Completion (0)      
Fri    Dec 26      Inspection (Final HVAC) (1)      
Mon    Dec 29      Inspection (Final Plumbing) (1)      
Tue    Dec 30      Inspection (Final Electric) (1)      
Wed    Dec 31      Stain Hardwood Stairs (1) *       
Thu    Jan 1      C.O. to Lender (0)      
Thu    Jan 1      Schedule Closing (0)      
Thu    Jan 1      Buyer Walk Through (1) *        June 26
Fri    Jan 2      Payment for Upgrades (0)      
Fri    Jan 2      Keys to Settlement Agent (0)      
Fri    Jan 2      Review Settlement Statement (0)      
Fri    Jan 2      Jerry Signs Closing Documents (0)      
Fri    Jan 2      Request Trash Tote From POA Manager (0)      
Fri    Jan 2      Closing (1)      
Mon    Jan 5      Remove Coded Lockbox (0)      
--   --   Finalize Selections; Kate will finalize;
--   --   Repaint in wish. Leave hall bath and laundry soft leather
--   --   Missing track light 7/25:K: there- needs to be installed
--   --   Finish installing lights 7/25:K: kitchen pendant
--   --   Trim in baths and laundry
--   --   Missing cabinet piece
--   --   Clean up outside front door
--   --   Shoe mold in kitchen and living room
--   --   Few odds and ends
--   --   Install track light above kitchen
--   --   Install missing heat register in closet
--   --   Remove furnishings
--   --   Repair chipped fascia on cabinet under sink Gabby
--   --   Finish screwing in cabinet to wall Osbaldo
--   --   Connect and test ice maker Osbaldo
--   --   Adjust upper cabinet that does not close properly Gabby
--   --   Paint stair railing
--   --   Fill and paint holes in trim and cap trim at top of stairs
--   --   Cap trim at top of stairwell Osbaldo
--   --   Install GFCI outlet in the master bathroom Osbaldo
--   --   Adjust back sliding glass door to latch properly Osbaldo
--   --   Install drain for overflow pan for washing machine Osbaldo
--   --   Touch up paint throughout Isaac
--   --   Move belongings in on June 29?
-- -- Building Permit (30) *       
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1) *       
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *       
-- -- Framing I (9)      
-- -- Order Steps (0)      
-- -- Framing II (8)      
-- -- Framing III (8) *       
-- -- Windows & Doors (0) *       
-- -- Roofing (0) *       
-- -- Order Cabinets (0)      
-- -- Deck (0)      
-- -- Gutters (0)      
-- -- Driveway (0) *       
-- -- Privacy Divider / Fence (0) *       
-- -- Sod / Seed / Landscaping (0)      
-- -- HVAC Rough In (4)      
-- -- Plumbing Rough In (4)      
-- -- Electric Rough In (4)      
-- -- Inspection (Rough In HVAC) (1)      
-- -- Exterior Vinyl (0) *       
-- -- Insulation (2) *       
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4) *       
-- -- Drywall (Tape, Block, Skim, Sand) (6) *       
-- -- Paint 1 (1)      
-- -- House Numbers (0)      
-- -- Cabinet Installation (2) *        Deliver May 13, Install May 16
-- -- Granite Installation (1) *        June 8
-- -- Interior Trim - Install (3) *       
-- -- Luxury Vinyl Plank (3) *       
-- -- Luxury Vinyl Tile (0)       K: 7/4 in process (not using spacers/crooked)?
-- -- Paint 2 (3)      
-- -- Cover Floors (1)      
-- -- Shelving, Door Knobs, Fire Extinguisher (0) *        In process
-- -- Pay Water / Sewer Taps (0)      
-- -- Electric Trim Out (3) *       
-- -- HVAC Trim Out (1) *       
-- -- Plumbing Trim Out (2) *        7/25: plumbing still needs to be installed
-- -- Install Appliances (0) *       
-- -- Carpet (2)      
-- -- Inspection (Final Building) (2) *        Mindy will check
-- -- Pre Walk Through (0)      
-- -- Cleaning (1)      
-- -- Certificate of Occupancy (1) *        Obtain copy