| Mon | Dec 15 | Ratified Contract? (0) | ||
| Mon | Dec 15 | $2500 Deposit Received (0) | ||
| Mon | Dec 15 | Association Packet Requested (0) | ||
| Mon | Dec 15 | Association Packet Received (0) | ||
| Mon | Dec 15 | Selections Meeting (0) | ||
| Mon | Dec 15 | Selections Sheet Signed (0) | ||
| Mon | Dec 15 | Amendment for Upgrades (B,S,L,T,BCP) (0) | ||
| Mon | Dec 15 | Deposit For Upgrades Received (0) | ||
| Mon | Dec 15 | Inspection (Concrete Wall) (1) | ||
| Tue | Dec 16 | Inspection (Conduit Under Slab) (1) | ||
| Wed | Dec 17 | Inspection (Drain Tile) (0) | ||
| Wed | Dec 17 | Settlement Agent Confirmed (0) | ||
| Wed | Dec 17 | Verify Window & Roof Structure (0) | ||
| Wed | Dec 17 | Patio (0) | ||
| Wed | Dec 17 | Rough In Microwave Vent (0) | ||
| Wed | Dec 17 | Inspection (Rough In Plumbing) (1) | ||
| Thu | Dec 18 | Inspection (Rough In Electric) (1) | ||
| Fri | Dec 19 | Inspection (Framing) (1) * | ||
| Mon | Dec 22 | Inspection (Deck Piers) (0) | ||
| Mon | Dec 22 | Exterior Stone (0) | ||
| Mon | Dec 22 | Set Electric Meter (0) * | ||
| Mon | Dec 22 | Inspection (Main Water Line) (0) | ||
| Mon | Dec 22 | Loan Approval (0) | ||
| Mon | Dec 22 | Deed Preparation (0) | ||
| Mon | Dec 22 | Mailbox (0) | ||
| Mon | Dec 22 | Interior Trim - Paint (1) | ||
| Tue | Dec 23 | Ceiling Fans (0) | ||
| Tue | Dec 23 | Blower Door Test (1) | ||
| Wed | Dec 24 | Inspection (Final HVAC) (1) | ||
| Thu | Dec 25 | Inspection (Final Plumbing) (1) | ||
| Fri | Dec 26 | Inspection (Final Electric) (1) | ||
| Mon | Dec 29 | Stain Hardwood Stairs (1) * | ||
| Tue | Dec 30 | Request Trash Tote From POA Manager (0) | ||
| -- | -- | Framing issue? 8/30 | ||
| -- | -- | CODED LOCKBOX 0303 | ||
| -- | -- | Gray vinyl plank flooring | ||
| -- | -- | small square to fill before flooring | Tom | |
| -- | -- | Hole in white trim above front door | Sprinkler? | |
| -- | -- | Rate lock expires 2/10 | ||
| -- | -- | Sprinkler inspection | Waiting on re-inspect by fire marshal on Feb 17 | |
| -- | -- | Paint 3 does not look completed 2/6 | ||
| -- | -- | Mixed metal bath fixtures 2/6 | ||
| -- | -- | Cabinet trim needed 2/6 | Painter | |
| -- | -- | Bath cabinet trim needed 2/6 | Painter | |
| -- | -- | Paint door 2/6 | Trim - Painter. Not done 2/17 | |
| -- | -- | More keys? 2/6 | ||
| -- | -- | Need black shower rods | just one | |
| -- | -- | Need black towel rings | Towel bar, towel ring, toilet paper holder | |
| -- | -- | Cable outlet covers needed 2/10 | ||
| -- | -- | Paint and caulk angle between ceiling and wall | ||
| -- | -- | Fridge seems to be abnormally loud 2/14 | ||
| -- | -- | Fridge seems to be abnormally loud 2/14 | ||
| -- | -- | For Kimberly Dash missing handle cabinet under sink also new cabinet correct size and scratch on drawer panel in half bath | ||
| -- | -- | Paint exterior door and trim | ||
| -- | -- | Sand and paint area next to Arch going into the living room | ||
| -- | -- | Replacement door front, cabinet door and drawer pull | On order, then Tom will install | |
| -- | -- | Drywall repair at ceilings | Mon, Feb 22 | |
| -- | -- | Send Isaac Hull an update on timing | hullisaac@gmail.com | |
| -- | -- | Sand drywall repairs | ||
| -- | -- | Paint drywall repairs | ||
| -- | -- | Building Permit (30) * | ||
| -- | -- | Order Roof & Floor Trusses (1) | ||
| Gray vinyl plank flooring | ||||
| Silver Cloud granite | ||||
| Gray cabinets (cost included in contract price) | ||||
| -- | -- | Order Windows & Doors (0) | ||
| -- | -- | Stake Out Home (1) | ||
| -- | -- | Excavate (2) | ||
| -- | -- | Inspection (Footers) (1) | ||
| -- | -- | Pour Footers (1) * | ||
| -- | -- | Set Forms (2) | ||
| -- | -- | Pour Foundation Walls (1) | ||
| -- | -- | Plumb Slab (2) | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) | ||
| -- | -- | Prepare Slab (1) | ||
| -- | -- | Inspection (Slab) (1) | ||
| -- | -- | Pour Slab (1) * | ||
| -- | -- | Framing I (9) | ||
| -- | -- | Order Steps (0) | ||
| -- | -- | Order Tubs / Showers (0) | ||
| -- | -- | Framing II (8) | ||
| -- | -- | Framing III (8) * | ||
| -- | -- | Install Stairs (0) * | ||
| -- | -- | Windows & Doors (0) * | ||
| -- | -- | House Number and Status in Window (0) | ||
| -- | -- | Roofing (0) * | ||
| -- | -- | Order Cabinets (0) | ||
| -- | -- | Order Appliances (0) | ||
| -- | -- | Deck (0) | ||
| -- | -- | Gutters (0) | ||
| -- | -- | Driveway (0) * | ||
| -- | -- | Privacy Divider / Fence (0) * | ||
| -- | -- | Sod / Seed / Landscaping (0) | ||
| -- | -- | HVAC Rough In (4) | ||
| -- | -- | Plumbing Rough In (4) | ||
| -- | -- | Electric Rough In (4) | In process 7/8 | |
| -- | -- | Inspection (Rough In HVAC) (1) | ||
| -- | -- | Exterior Vinyl (0) * | ||
| -- | -- | Insulation (2) * | ||
| -- | -- | Inspection (Insulation) (1) | ||
| -- | -- | Inspection (Electric Service) (0) | ||
| -- | -- | Inspection (Main Sewer Line) (0) | ||
| -- | -- | Order Interior Doors & Trim (0) | ||
| -- | -- | Drywall (Hang) (4) * | Stocked 9/19 | |
| -- | -- | Drywall (Tape, Block, Skim, Sand) (6) * | Needs final sanding 11/4 | |
| -- | -- | Paint 1 (1) | ||
| -- | -- | Garage Door (0) | ||
| -- | -- | House Numbers (0) | ||
| -- | -- | Cabinet Installation (2) * | 1/28 delivery, 1/29 install | |
| -- | -- | Granite Installation (1) * | Set for 2/1 GWB | |
| -- | -- | Interior Trim - Install (3) * | Needs painting 1/9 | |
| -- | -- | Order Plumbing / Lighting Fixtures (0) | ||
| -- | -- | Luxury Vinyl Plank (3) * | Mon, Feb 1 - Tue, Feb 2 | |
| -- | -- | Luxury Vinyl Tile (0) | Mon, Feb 1 - Tue, Feb 2 on site GWB | |
| -- | -- | Paint 2 (3) | ||
| -- | -- | Cover Floors (1) | ||
| -- | -- | Deliver Plumbing / Lighting Fixtures (0) | ||
| -- | -- | Shoe Moulding (0) | 2/4 | |
| -- | -- | Shelving, Door Knobs, Fire Extinguisher (0) * | Wed, Feb 3 | |
| -- | -- | Install Coded Lockbox (add extra keys) (0) | ||
| -- | -- | Pay Water / Sewer Taps (0) | ||
| -- | -- | Set Water Meter (0) * | ||
| -- | -- | Electric Trim Out (3) * | Needs panel - 2/4 | |
| -- | -- | HVAC Trim Out (1) * | ||
| -- | -- | Plumbing Trim Out (2) * | 2/4 hopefully | |
| -- | -- | Install Appliances (0) * | CJ - 2/4 hopefully | |
| -- | -- | Paint 3 (2) * | Galindez set to finish 2/4 GWB | |
| -- | -- | Carpet (2) | Padding down 2/3 | |
| -- | -- | Appraiser Confirms Construction Completion (0) | ||
| -- | -- | Inspection (Final Building) (2) * | 2/5 | |
| -- | -- | Pre Walk Through (0) | ||
| -- | -- | Cleaning (1) | Jill will talk to Kelly, 2/11 | |
| -- | -- | Certificate of Occupancy (1) * | ||
| -- | -- | C.O. to Lender (0) | ||
| -- | -- | Schedule Closing (0) | ||
| -- | -- | Buyer Walk Through (1) * | Mon, Feb 15? | |
| -- | -- | Payment for Upgrades (0) | ||
| -- | -- | Keys to Settlement Agent (0) | ||
| -- | -- | Review Settlement Statement (0) | ||
| -- | -- | Jerry Signs Closing Documents (0) | West View Title, Mon, Feb 22 @ 12:30 PM | |
| -- | -- | Closing (1) | West View Title, Mon, Feb 22 @ 10:00 AM | |
| -- | -- | Remove Coded Lockbox (0) | ||