| Mon | Dec 15 | Ratified Contract? (0) | ||
| Mon | Dec 15 | $2500 Deposit Received (0) | ||
| Mon | Dec 15 | Association Packet Requested (0) | ||
| Mon | Dec 15 | Association Packet Received (0) | ||
| Mon | Dec 15 | Selections Meeting (0) | ||
| Mon | Dec 15 | Selections Sheet Signed (0) | ||
| Mon | Dec 15 | Amendment for Upgrades (B,S,L,T,BCP) (0) | ||
| Mon | Dec 15 | Deposit For Upgrades Received (0) | ||
| Mon | Dec 15 | Inspection (Concrete Wall) (1) | ||
| Tue | Dec 16 | Inspection (Conduit Under Slab) (1) | ||
| Wed | Dec 17 | Inspection (Drain Tile) (0) | ||
| Wed | Dec 17 | Settlement Agent Confirmed (0) | ||
| Wed | Dec 17 | Verify Window & Roof Structure (0) | ||
| Wed | Dec 17 | Patio (0) | ||
| Wed | Dec 17 | Rough In Microwave Vent (0) | ||
| Wed | Dec 17 | Inspection (Rough In Plumbing) (1) | ||
| Thu | Dec 18 | Inspection (Rough In Electric) (1) | ||
| Fri | Dec 19 | Inspection (Framing) (1) * | ||
| Mon | Dec 22 | Inspection (Deck Piers) (0) | ||
| Mon | Dec 22 | Exterior Stone (0) | ||
| Mon | Dec 22 | Set Electric Meter (0) * | ||
| Mon | Dec 22 | Inspection (Main Water Line) (0) | ||
| Mon | Dec 22 | Loan Approval (0) | ||
| Mon | Dec 22 | Deed Preparation (0) | ||
| Mon | Dec 22 | Mailbox (0) | ||
| Mon | Dec 22 | Interior Trim - Paint (1) | ||
| Tue | Dec 23 | Ceiling Fans (0) | ||
| Tue | Dec 23 | Blower Door Test (1) | ||
| Wed | Dec 24 | Inspection (Final HVAC) (1) | ||
| Thu | Dec 25 | Inspection (Final Plumbing) (1) | ||
| Fri | Dec 26 | Inspection (Final Electric) (1) | ||
| Mon | Dec 29 | Stain Hardwood Stairs (1) * | ||
| -- | -- | Electric rough in -final 8/30 | ||
| -- | -- | CODED LOCKBOX 0202 | ||
| -- | -- | Loose screws on decking boards on 2nd and 3rd towers | ||
| -- | -- | Whole house chantilly? | ||
| -- | -- | Silver bedroom light ok? Rest is black. | Not completed 5/15 | |
| -- | -- | Remove old sign posts | ||
| -- | -- | New dumpster | ||
| -- | -- | Remove protective film from outside band board | ||
| -- | -- | Ceiling drywall repairs 3/24 | ||
| -- | -- | Fridge handles? | ||
| -- | -- | Paint front door | ||
| -- | -- | Caulk in front of tubs | Jill has lined up for Monday 6/21 | |
| -- | -- | Touch up paint throughout 5/5 | ||
| -- | -- | Drywallers arriving 6/17 | ||
| -- | -- | Touch up needed M bath ceiling 6/23 | ||
| -- | -- | Drywall touch up, paint touch up | Monday, June 28 | |
| -- | -- | Drywall touch up/ paint indicated by blue tape | ||
| -- | -- | Fix showerhead escutcheon to wall | ||
| -- | -- | swap out the current front door lock system with a new system so that we start out with my daughter able to be fully safe | ||
| -- | -- | Raise front door light 18 inches | ||
| -- | -- | Building Permit (30) * | ||
| -- | -- | Order Roof & Floor Trusses (1) | ||
| Gray Shaker Kitchen Cabinets (cost included in contract price) | ||||
| White Shaker Bathroom Cabinets (cost included in contract price) | ||||
| Level III Quartz Countertops (cost included in contract price) | ||||
| Farmhouse Style Plumbing Package (cost included in contract price) | ||||
| Luxury Vinyl Plank in Both Bedrooms (cost included in contract price) | ||||
| -- | -- | Order Windows & Doors (0) | ||
| -- | -- | Stake Out Home (1) | ||
| -- | -- | Excavate (2) | ||
| -- | -- | Inspection (Footers) (1) | ||
| -- | -- | Pour Footers (1) * | ||
| -- | -- | Set Forms (2) | ||
| -- | -- | Pour Foundation Walls (1) | ||
| -- | -- | Plumb Slab (2) | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) | ||
| -- | -- | Prepare Slab (1) | ||
| -- | -- | Inspection (Slab) (1) | ||
| -- | -- | Pour Slab (1) * | ||
| -- | -- | Framing I (9) | ||
| -- | -- | Order Steps (0) | ||
| -- | -- | Order Tubs / Showers (0) | ||
| -- | -- | Framing II (8) | ||
| -- | -- | Framing III (8) * | ||
| -- | -- | Install Stairs (0) * | ||
| -- | -- | Windows & Doors (0) * | ||
| -- | -- | House Number and Status in Window (0) | ||
| -- | -- | Roofing (0) * | ||
| -- | -- | Order Cabinets (0) | ||
| -- | -- | Order Appliances (0) | Ordered and set to deliver 1/21 | |
| -- | -- | Deck (0) | ||
| -- | -- | Gutters (0) | ||
| -- | -- | Driveway (0) * | ||
| -- | -- | Privacy Divider / Fence (0) * | ||
| -- | -- | Sod / Seed / Landscaping (0) | ||
| -- | -- | HVAC Rough In (4) | ||
| -- | -- | Plumbing Rough In (4) | In process 5/25 | |
| -- | -- | Electric Rough In (4) | In process 6/17 | |
| -- | -- | Inspection (Rough In HVAC) (1) | ||
| -- | -- | Exterior Vinyl (0) * | ||
| -- | -- | Insulation (2) * | ||
| -- | -- | Inspection (Insulation) (1) | ||
| -- | -- | Inspection (Electric Service) (0) | ||
| -- | -- | Inspection (Main Sewer Line) (0) | ||
| -- | -- | Order Interior Doors & Trim (0) | ||
| -- | -- | Drywall (Hang) (4) * | Stocked 9/19 | |
| -- | -- | Drywall (Tape, Block, Skim, Sand) (6) * | Sanding 10/7 | |
| -- | -- | Paint 1 (1) | ||
| -- | -- | Garage Door (0) | ||
| -- | -- | House Numbers (0) | ||
| -- | -- | Cabinet Installation (2) * | Dec 29th From Kimberly GWB | |
| -- | -- | Granite Installation (1) * | Feb 8 | |
| -- | -- | Interior Trim - Install (3) * | In process 11/11 | |
| -- | -- | Order Plumbing / Lighting Fixtures (0) | ||
| -- | -- | Luxury Vinyl Plank (3) * | In process 2/10 | |
| -- | -- | Luxury Vinyl Tile (0) | On site | |
| -- | -- | Paint 2 (3) | Ready for this anytime | |
| -- | -- | Cover Floors (1) | ||
| -- | -- | Deliver Plumbing / Lighting Fixtures (0) | ||
| -- | -- | Shoe Moulding (0) | In process 3/3 | |
| -- | -- | Shelving, Door Knobs, Fire Extinguisher (0) * | In process 3/24. | |
| -- | -- | Install Coded Lockbox (add extra keys) (0) | ||
| -- | -- | Pay Water / Sewer Taps (0) | ||
| -- | -- | Set Water Meter (0) * | ||
| -- | -- | Electric Trim Out (3) * | Bathroom vanities not completed/outlet covers needed | |
| -- | -- | HVAC Trim Out (1) * | ||
| -- | -- | Plumbing Trim Out (2) * | Supplies on site 3/3 | |
| -- | -- | Install Appliances (0) * | 5/6? | |
| -- | -- | Paint 3 (2) * | ||
| -- | -- | Carpet (2) | NO Carpet | |
| -- | -- | Appraiser Confirms Construction Completion (0) | ||
| -- | -- | Inspection (Final Building) (2) * | ||
| -- | -- | Pre Walk Through (0) | Kate setting this up for the middle of next week | |
| -- | -- | Cleaning (1) | ||
| -- | -- | Certificate of Occupancy (1) * | ||
| -- | -- | C.O. to Lender (0) | ||
| -- | -- | Schedule Closing (0) | ||
| -- | -- | Buyer Walk Through (1) * | Friday 25th at 1:00 PM | |
| -- | -- | Payment for Upgrades (0) | ||
| -- | -- | Keys to Settlement Agent (0) | ||
| -- | -- | Review Settlement Statement (0) | ||
| -- | -- | Jerry Signs Closing Documents (0) | 6/28/2021 @ 11:30 AM | |
| -- | -- | Request Trash Tote From POA Manager (0) | ||
| -- | -- | Closing (1) | June 30 | |
| -- | -- | Remove Coded Lockbox (0) | ||