- 103  ::  1270 Constitution Court #103
[ BUILD: 1805-0143 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
Mon    Dec 15      Ratified Contract? (0)      
Mon    Dec 15      $2500 Deposit Received (0)      
Mon    Dec 15      Association Packet Requested (0)      
Mon    Dec 15      Association Packet Received (0)      
Mon    Dec 15      Selections Meeting (0)      
Mon    Dec 15      Selections Sheet Signed (0)      
Mon    Dec 15      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Mon    Dec 15      Deposit For Upgrades Received (0)      
Mon    Dec 15      Inspection (Concrete Wall) (1)      
Tue    Dec 16      Inspection (Conduit Under Slab) (1)      
Wed    Dec 17      Inspection (Drain Tile) (0)      
Wed    Dec 17      Settlement Agent Confirmed (0)      
Wed    Dec 17      Verify Window & Roof Structure (0)      
Wed    Dec 17      Patio (0)      
Wed    Dec 17      Rough In Microwave Vent (0)      
Wed    Dec 17      Inspection (Rough In Plumbing) (1)      
Thu    Dec 18      Inspection (Rough In Electric) (1)      
Fri    Dec 19      Inspection (Framing) (1) *       
Mon    Dec 22      Inspection (Deck Piers) (0)      
Mon    Dec 22      Exterior Stone (0)      
Mon    Dec 22      Set Electric Meter (0) *       
Mon    Dec 22      Inspection (Main Water Line) (0)      
Mon    Dec 22      Loan Approval (0)      
Mon    Dec 22      Deed Preparation (0)      
Mon    Dec 22      Mailbox (0)      
Mon    Dec 22      Interior Trim - Paint (1)      
Tue    Dec 23      Ceiling Fans (0)      
Tue    Dec 23      Blower Door Test (1)      
Wed    Dec 24      Inspection (Final HVAC) (1)      
Thu    Dec 25      Inspection (Final Plumbing) (1)      
Fri    Dec 26      Inspection (Final Electric) (1)      
Mon    Dec 29      Stain Hardwood Stairs (1) *       
--   --   Exposed black area on back corner of home-landscaping repair? 10/14
--   --   CODED LOCKBOX 0103
--   --   Molding needed in archway 12/16
--   --   Trim/doors need painting 1/6
--   --   Drywall repair laundry room 2/27 In process 3/10
--   --   Need side sliding door keys
--   --   Leak at air handler? Alex will take care of it
--   --   Finish rear of the building landscaping?
--   --   Stove plug needed
--   --   Side splash incorrect hall bath?
--   --   Final drywall finishing needed in laundry room
--   --   Fridge w missing handles is located here
--   --   Dead landscaping 5/19 Tom will tell them
--   --   Master bath countertops needed
--   --   Patch holes in closet In process
--   --   Touch up paint
--   --   Lightbulbs Jill
--   --   Covers for MB light Jill
--   --   Cable
--   --   Cable cover on wall Jill will contact Lumos
--   --   shower rod in master bath needs installed~missing one end piece Jill
--   --   take robe hook off the wall outside shower~owner does not want it Jill will tell Majer
--   --   put ring around the sprinkler in the laundry room ceiling Tom-ring is on top of laundry shelving. Just needs installed 6/5
--   --   garbage disposal is not wired Jill will remind Harry- seems to work ok 6/5
--   --   caulk around the sprinkler in living room ceiling Jill will tell Majer
--   --   splash block outside under the master bedroom window is tilted the wrong way~need to build it up a little in the back still needs to be adjusted as of 6/9
--   --   caulk around the pipes going in the ceiling in the mechanical room Jill will tell Majer
--   --  
--   --   Touch up paint at area where robe hook was located as of 6/9
--   --   Repair loud garbage disposal as of 6/9
--   --   Sweep or mop floors as of 6/9
-- -- Building Permit (30) *       
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1) *       
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *       
-- -- Framing I (9)      
-- -- Order Steps (0)      
-- -- Order Tubs / Showers (0)      
-- -- Framing II (8)      
-- -- Framing III (8) *       
-- -- Install Stairs (0) *       
-- -- Windows & Doors (0) *       
-- -- House Number and Status in Window (0)      
-- -- Roofing (0) *       
-- -- Order Cabinets (0)      
-- -- Order Appliances (0)       One full set on site 3/10
-- -- Deck (0)      
-- -- Gutters (0)      
-- -- Driveway (0) *       
-- -- Privacy Divider / Fence (0) *       
-- -- Sod / Seed / Landscaping (0)      
-- -- HVAC Rough In (4)       in process 4/29
-- -- Plumbing Rough In (4)      
-- -- Electric Rough In (4)       In process 7/15
-- -- Inspection (Rough In HVAC) (1)      
-- -- Exterior Vinyl (0) *       
-- -- Insulation (2) *       
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4) *        Stocked 9/19
-- -- Drywall (Tape, Block, Skim, Sand) (6) *        in process 10/31
-- -- Paint 1 (1)      
-- -- Garage Door (0)      
-- -- House Numbers (0)      
-- -- Cabinet Installation (2) *        Installation May 13
-- -- Granite Installation (1) *        Partially complete 5/15
-- -- Interior Trim - Install (3) *       
-- -- Order Plumbing / Lighting Fixtures (0)      
-- -- Luxury Vinyl Plank (3) *        Mon, May 17
-- -- Luxury Vinyl Tile (0)      
-- -- Paint 2 (3)      
-- -- Cover Floors (1)       Jill will take care of it
-- -- Deliver Plumbing / Lighting Fixtures (0)      
-- -- Shoe Moulding (0)      
-- -- Shelving, Door Knobs, Fire Extinguisher (0) *        Wed, May 19?
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Set Water Meter (0) *       
-- -- Electric Trim Out (3) *        Partially complete 5/31
-- -- HVAC Trim Out (1) *       
-- -- Plumbing Trim Out (2) *       
-- -- Install Appliances (0) *        All on site 5/15
-- -- Paint 3 (2) *       
-- -- Carpet (2)      
-- -- Appraiser Confirms Construction Completion (0)      
-- -- Inspection (Final Building) (2) *        6/1 afternoon
-- -- Pre Walk Through (0)      
-- -- Cleaning (1)      
-- -- Certificate of Occupancy (1) *       
-- -- C.O. to Lender (0)      
-- -- Schedule Closing (0)       June 11th at 11AM
-- -- Buyer Walk Through (1) *        Wed, June 2
-- -- Payment for Upgrades (0)      
-- -- Keys to Settlement Agent (0)      
-- -- Review Settlement Statement (0)      
-- -- Jerry Signs Closing Documents (0)      
-- -- Request Trash Tote From POA Manager (0)      
-- -- Closing (1)       June 11th at 11AM
-- -- Remove Coded Lockbox (0)