Tue |
Apr 29 |
Ratified Contract? (0) |
|
|
Tue |
Apr 29 |
$2500 Deposit Received (0) |
|
|
Tue |
Apr 29 |
Association Packet Requested (0) |
|
|
Tue |
Apr 29 |
Association Packet Received (0) |
|
|
Tue |
Apr 29 |
Selections Meeting (0) |
|
|
Tue |
Apr 29 |
Selections Sheet Signed (0) |
|
|
Tue |
Apr 29 |
Amendment for Upgrades (B,S,L,T,BCP) (0) |
|
|
Tue |
Apr 29 |
Deposit For Upgrades Received (0) |
|
|
Tue |
Apr 29 |
Inspection (Concrete Wall) (1) |
|
|
Wed |
Apr 30 |
Inspection (Conduit Under Slab) (1) |
|
|
Thu |
May 1 |
Inspection (Drain Tile) (0) |
|
|
Thu |
May 1 |
Settlement Agent Confirmed (0) |
|
|
Thu |
May 1 |
Verify Window & Roof Structure (0) |
|
|
Thu |
May 1 |
Patio (0) |
|
|
Thu |
May 1 |
Rough In Microwave Vent (0) |
|
|
Thu |
May 1 |
Inspection (Rough In Plumbing) (1) |
|
|
Fri |
May 2 |
Inspection (Rough In Electric) (1) |
|
|
Mon |
May 5 |
Inspection (Deck Piers) (0) |
|
|
Mon |
May 5 |
Inspection (Framing) (1) * |
|
|
Tue |
May 6 |
Exterior Stone (0) |
|
|
Tue |
May 6 |
Set Electric Meter (0) * |
|
|
Tue |
May 6 |
Inspection (Main Water Line) (0) |
|
|
Tue |
May 6 |
Loan Approval (0) |
|
|
Tue |
May 6 |
Deed Preparation (0) |
|
|
Tue |
May 6 |
Mailbox (0) |
|
|
Tue |
May 6 |
Interior Trim - Paint (1) |
|
|
Wed |
May 7 |
Ceiling Fans (0) |
|
|
Wed |
May 7 |
Blower Door Test (1) |
|
|
Thu |
May 8 |
Inspection (Final HVAC) (1) |
|
|
Fri |
May 9 |
Inspection (Final Plumbing) (1) |
|
|
Mon |
May 12 |
Inspection (Final Electric) (1) |
|
|
Tue |
May 13 |
Stain Hardwood Stairs (1) |
|
|
|
-- |
-- |
Pipe/ceiling issue? Drywall removed 10/21 |
|
|
-- |
-- |
CODED LOCKBOX 0302 |
|
|
-- |
-- |
Selections meeting Sunday 17th at 3:00 |
|
|
-- |
-- |
Luxury Vinyl Tile |
on site GWB |
|
-- |
-- |
Number is wrong on condo-switch with 203. |
|
|
-- |
-- |
Dent in fridge (not installed) 2/20 |
new fridge doors are on order |
|
-- |
-- |
Bathroom tops needed 2/24 |
installing 3/11 |
|
-- |
-- |
Needs oven and new fridge (dishwasher/micro on site) 3/3 |
Just needs fridge 3/10 |
|
-- |
-- |
MB vanity backsplash needed 3/13 |
installing 3/18 |
|
-- |
-- |
Think outlets needed for micro and stove (harry) |
|
|
-- |
-- |
Trim in kitchen needed 3/28 |
|
|
-- |
-- |
Missing cabinet handle |
|
|
-- |
-- |
Home Inspection - 4/28 @ 9:00 AM |
|
|
-- |
-- |
Paint front door |
Jill will remind the painters |
|
-- |
-- |
Needs grey outlet cover in kitchen |
Jill remind Harry |
|
-- |
-- |
Repair siding at back deck at sprinkler hole |
|
|
-- |
-- |
Fix upside down receptacle on deck |
Jill remind John |
|
-- |
-- |
Nail pops in LR |
Jill to follow up with painter |
|
-- |
-- |
Weatherstripping needed |
|
|
-- |
-- |
Arc fault breaker in the main panel does not trip when tested |
|
|
-- |
-- |
Refrigerator replaced; water line connected |
|
|
-- |
-- |
Scratch in MB right side faucet needs repair |
Tom |
|
-- |
-- |
Touch up paint: Casement needs attention, baseboard needs sanded & repainted, MB closet needs to be sanded and touched up around the trim & door |
|
|
-- |
-- |
The light switch by the back door has a hole needing to be filled and painted |
Jill will remind the painters |
|
-- |
-- |
Ceiling has nail holes |
Jill will remind the painters |
|
-- |
-- |
Weather stripping repairs at door |
Jill |
|
-- |
-- |
Repair broken truss |
Tom |
|
-- |
-- |
Dents in front door panels |
Some done 5/5 |
|
-- |
-- |
Secure trim on bottom of island |
Tom |
|
-- |
-- |
Cabinet -far left-has Knick in bottom of it. Others need smoothed out at seams |
|
|
-- |
-- |
Both bathtub/showers have scratches in need of repairs |
|
|
-- |
-- |
Both bathtub/showers have scratches in need of repairs |
|
|
-- |
-- |
Moving in full time June 4 |
|
|
-- |
-- |
Dents in the front door |
|
|
-- |
-- |
Scratches on freezer door |
|
|
-- |
-- |
Building Permit (30) |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) |
|
|
-- |
-- |
Order Windows & Doors (0) |
|
|
-- |
-- |
Stake Out Home (1) |
|
|
-- |
-- |
Excavate (2) |
|
|
-- |
-- |
Inspection (Footers) (1) |
|
|
-- |
-- |
Pour Footers (1) * |
|
|
-- |
-- |
Set Forms (2) |
|
|
-- |
-- |
Pour Foundation Walls (1) |
|
|
-- |
-- |
Plumb Slab (2) |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) |
|
|
-- |
-- |
Prepare Slab (1) |
|
|
-- |
-- |
Inspection (Slab) (1) |
|
|
-- |
-- |
Pour Slab (1) * |
|
|
-- |
-- |
Framing I (9) |
|
|
-- |
-- |
Order Steps (0) |
|
|
-- |
-- |
Order Tubs / Showers (0) |
|
|
-- |
-- |
Framing II (8) |
|
|
-- |
-- |
Framing III (8) * |
|
|
-- |
-- |
Install Stairs (0) |
|
|
-- |
-- |
Windows & Doors (0) * |
|
|
-- |
-- |
House Number and Status in Window (0) |
|
|
-- |
-- |
Roofing (0) * |
|
|
-- |
-- |
Order Cabinets (0) |
To be ordered week of Jan 11 |
|
-- |
-- |
Order Appliances (0) |
|
|
-- |
-- |
Deck (0) |
|
|
-- |
-- |
Gutters (0) |
|
|
-- |
-- |
Driveway (0) * |
|
|
-- |
-- |
Privacy Divider / Fence (0) |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) |
|
|
-- |
-- |
HVAC Rough In (4) |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1) |
|
|
-- |
-- |
Plumbing Rough In (4) |
In process 5/30 |
|
-- |
-- |
Electric Rough In (4) |
In process 6/21 |
|
-- |
-- |
Exterior Vinyl (0) * |
|
|
-- |
-- |
Insulation (2) * |
|
|
-- |
-- |
Inspection (Insulation) (1) |
|
|
-- |
-- |
Inspection (Electric Service) (0) |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) |
|
|
-- |
-- |
Order Interior Doors & Trim (0) |
|
|
-- |
-- |
Drywall (Hang) (4) * |
Stocked 9/19 |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * |
Sanding 10/7 |
|
-- |
-- |
Paint 1 (1) |
|
|
-- |
-- |
Garage Door (0) * |
|
|
-- |
-- |
House Numbers (0) |
|
|
-- |
-- |
Cabinet Installation (2) * |
Delivery Feb 15, install set for 2/16 GWB |
|
-- |
-- |
Granite Installation (1) * |
Scheduled for Feb 17 |
|
-- |
-- |
Interior Trim - Install (3) * |
In process 11/7 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * |
In process 3/13 |
|
-- |
-- |
Luxury Vinyl Tile (0) |
|
|
-- |
-- |
Paint 2 (3) |
|
|
-- |
-- |
Cover Floors (1) |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Shoe Moulding (0) |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) * |
In process 3/28 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) |
|
|
-- |
-- |
Set Water Meter (0) * |
|
|
-- |
-- |
Electric Trim Out (3) |
Vanity lights needed 3/28-few items left |
|
-- |
-- |
HVAC Trim Out (1) |
|
|
-- |
-- |
Plumbing Trim Out (2) |
|
|
-- |
-- |
Install Appliances (0) * |
Dishwasher is in 3/17 |
|
-- |
-- |
Paint 3 (2) * |
Jill will schedule |
|
-- |
-- |
Carpet (2) |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) |
|
|
-- |
-- |
Inspection (Final Building) (2) * |
|
|
-- |
-- |
Pre Walk Through (0) |
|
|
-- |
-- |
Cleaning (1) |
|
|
-- |
-- |
Certificate of Occupancy (1) * |
|
|
-- |
-- |
C.O. to Lender (0) |
|
|
-- |
-- |
Schedule Closing (0) |
|
|
-- |
-- |
Buyer Walk Through (1) |
|
|
-- |
-- |
Payment for Upgrades (0) |
|
|
-- |
-- |
Keys to Settlement Agent (0) |
|
|
-- |
-- |
Review Settlement Statement (0) |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) |
|
|
-- |
-- |
Closing (1) |
West View Title |
|
-- |
-- |
Remove Coded Lockbox (0) |
after repairs |
|