- 102  ::  1270 Constitution Court #102
[ BUILD: 1805-0142 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
Fri    Dec 19      Inspection (Concrete Wall) (1)      
Mon    Dec 22      Inspection (Conduit Under Slab) (1)      
Tue    Dec 23      Inspection (Drain Tile) (0)      
Tue    Dec 23      Inspection (Rough In Plumbing) (1)      
Wed    Dec 24      Inspection (Rough In Electric) (1)      
Thu    Dec 25      Inspection (Framing) (1) *       
Fri    Dec 26      Inspection (Deck Piers) (0)      
Fri    Dec 26      Inspection (Main Water Line) (0)      
Fri    Dec 26      Inspection (Final HVAC) (1)      
Mon    Dec 29      Inspection (Final Plumbing) (1)      
Tue    Dec 30      Inspection (Final Electric) (1)      
-- -- Inspection (Footers) (1)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Inspection (Slab) (1)      
-- -- Inspection (Rough In HVAC) (1)      
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Inspection (Final Building) (2) *        After Harry finishes