Tue    Apr 29      Inspection (Footers) (1)      
Wed    Apr 30      Inspection (Concrete Wall) (1)      
Thu    May 1      Inspection (Plumbing Under Slab) (1)      
Fri    May 2      Inspection (Conduit Under Slab) (1)      
Mon    May 5      Inspection (Slab) (1)      
Tue    May 6      Inspection (Drain Tile) (0)      
Tue    May 6      Inspection (Rough In HVAC) (1)      
Wed    May 7      Inspection (Rough In Plumbing) (1)      
Thu    May 8      Inspection (Rough In Electric) (1)      
Fri    May 9      Inspection (Deck Piers) (0)      
Fri    May 9      Inspection (Framing) (1) *       
Mon    May 12      Inspection (Insulation) (1)      
Tue    May 13      Inspection (Electric Service) (0)      
Tue    May 13      Inspection (Main Sewer Line) (0)      
Tue    May 13      Inspection (Main Water Line) (0)      
Tue    May 13      Inspection (Final HVAC) (1)      
Wed    May 14      Inspection (Final Plumbing) (1)      
Thu    May 15      Inspection (Final Electric) (1)      
Fri    May 16      Inspection (Final Building) (2) *