CONGERS-2
CONGERS-3
TUSCAN
38
39
40
41
•
42
43
44
45
•
22
23
24
25
26
27
•
37
36
35
34
•
ADDR
Driveway
Patio
Deck
Bonus Room
Bath Accessories
Electric Trim
Fans
Plumbing Trim
Appliances
Ratified Contract?
$2500 Deposit Received
Association Packet Requested
Association Packet Received
Selections Meeting
Selections Sheet Signed
Amendment for Upgrades (B,S,L,T,BCP)
Deposit For Upgrades Received
Building Permit
Order Roof & Floor Trusses
Order Windows & Doors
Stake Out Home
Excavate
Inspection (Footers)
Inspection (Concrete Wall)
Pour Footers
Set Forms
Pour Foundation Walls
Plumb Slab
Inspection (Plumbing Under Slab)
Inspection (Conduit Under Slab)
Prepare Slab
Inspection (Slab)
Inspection (Drain Tile)
Pour Slab
Settlement Agent Confirmed
Framing I
Order Steps
Order Tubs / Showers
Framing II
Framing III
Verify Window & Roof Structure
Install Stairs
Windows & Doors
House Number and Status in Window
Roofing
Order Cabinets
Order Appliances
Deck
Gutters
Driveway
Patio
Privacy Divider / Fence
Sod / Seed / Landscaping
HVAC Rough In
Inspection (Rough In HVAC)
Rough In Microwave Vent
Plumbing Rough In
Inspection (Rough In Plumbing)
Electric Rough In
Inspection (Rough In Electric)
Inspection (Deck Piers)
Inspection (Framing)
Exterior Vinyl
Exterior Stone
Insulation
Inspection (Insulation)
Inspection (Electric Service)
Set Electric Meter
Inspection (Main Sewer Line)
Inspection (Main Water Line)
Order Interior Doors & Trim
Drywall (Hang)
Loan Approval
Deed Preparation
Drywall (Tape, Block, Skim, Sand)
Paint 1
Garage Door
House Numbers
Mailbox
Cabinet Installation
Granite Installation
Interior Trim - Install
Order Plumbing / Lighting Fixtures
Interior Trim - Paint
Luxury Vinyl Plank
Luxury Vinyl Tile
Paint 2
Cover Floors
Deliver Plumbing / Lighting Fixtures
Shoe Moulding
Shelving, Door Knobs, Fire Extinguisher
Install Coded Lockbox (add extra keys)
Pay Water / Sewer Taps
Set Water Meter
Electric Trim Out
Ceiling Fans
HVAC Trim Out
Blower Door Test
Plumbing Trim Out
Install Appliances
Paint 3
Carpet
Appraiser Confirms Construction Completion
Inspection (Final HVAC)
Inspection (Final Plumbing)
Inspection (Final Electric)
Inspection (Final Building)
Pre Walk Through
Stain Hardwood Stairs
Cleaning
Certificate of Occupancy
C.O. to Lender
Schedule Closing
Buyer Walk Through
Payment for Upgrades
Keys to Settlement Agent
Review Settlement Statement
Jerry Signs Closing Documents
Request Trash Tote From POA Manager
Closing
Remove Coded Lockbox
Lot 38
Lot 39
Lot 40
Lot 41
Lot 42
Lot 43
Lot 44
Lot 45
Lot 22
Lot 23
Lot 24
Lot 25
Lot 26
Lot 27
Lot 37
Lot 36
Lot 35
Lot 34