| Single 18 foot door (instead of single 16 foot door) |
| Pull down stairs to attic over garage; room over garage trusses, approx 8x14 floored with 3/4 inch OSB; light; |
| Final Deck Configuration (6 feet deep, to corner of porch) |
| Run four inch radon pipe up through roof and cap it |
| Digging hole for propane tank (Buyer will purchase tank, Blossman will set tank) |
| Twin pocket doors centered on future office wall in basement (instead of barn doors) |
| Adding 2ft x 6ft to right end of deck (March 15) |
| Increase Kitchen Window from 3 ft to 5 ft. |
| Stairs will be carpet covered pine treads as per standard spec |
| Allowance for sliding door(s) to deck and sliding door to porch |
| Add 3rd Window to the northside of great room |
| Credit for patio door to porch |
| Cathedral ceiling in master bath, move window higher |
| Increase Arched Window master bedroom |
| Windows and sliders on back (east) of home and north of home - no grills |
| Windows on arrival and south side of home - with grills |
| Lam beam to remove post at bottom of stairs (as per plans - wall will be built where wall is illustrated, pickets and newel post where no wall is illustrated) |
| $1400 shower allowance per original contract |
| $500 allowance for master bathroom tub (includes faucet) |
| Credit for removing two windows in living room |
| ALL ITEMS LISTED ABOVE ARE DOCUMENTED ON CHANGE ORDER 1 |
| Extend radon pipe through roof |
| Additional 3030 DH window in basement office |
| Cost of reversing direction of basement tub/shower |
| Credit for standard water heater - buyer to buy and pay for tankless water heater |
| Gas piping to gas range |
| Builder to install bracing/backing for grab bars on all tubs and showers (buyer to select grab bars from Inner Finishes and pay for grab bars and installation) |
| ALL ITEMS LISTED ABOVE ARE DOCUMENTED ON CHANGE ORDER 2 |
| Passage way under stairs from family room to hallway with stair stringer partially exposed |
| 2 foot 8 inch door with lock in safe room in basement bathroom |
| Buyer may change door swing direction at electrical walk through |
| ALL ITEMS LISTED ABOVE ARE DOCUMENTED ON CHANGE ORDER 3 |
| Additional Deposit of $10,000 |
| Additional Deposit of $4,806.86 (for fireplace) |
| Upgrading to biscuit color for one garden tub and two tub/showers |
| Recessed Can lights (upgrade cost over the cost of snap lights - includes credit for snap lights) |
| Brick accent on 6 windows- 5 upstairs/1 in basement ($95 each) and garage door ($150) |
| Framing Changes to 2nd Bedroom closet and 2nd bathroom |
| Arch/cubby at foyer |
| Ferguson Appliance Upgrade Cost |
| CREDIT- Standard Stainless Steel Appliances |
| Appliance install cost (original quote) |
| Garden tub- cost over $500 allowance (cost for deckmount faucet not yet determined) |
| Set and install Purchasers Tank- does not include gas line |
| Original quote for fireplace |
| Additional fireplace cost for roof vent instead of wall vent |
| Cap for fireplace |
| Additional Deposit of $10,000 |
| OSB around fireplace to prepare for rock |
| Deposit with Change Order 1 |
| Credit for fireplace allowance |
| Vent microwave to outside |
| Credit for change from pocket doors to swing doors on basement office |
| Change in house size based on foundation wall change (24x50, 14x20) |
| Gas piping to fireplace, water heater, furnace and grill (not including pipe from tank to house) |
| Additional deck expansion to bedroom bump out (8 x 6) |
| ALL ITEMS LISTED ABOVE ARE DOCUMENTED ON CHANGE ORDER 4 |
| Shanks plumbing fixture upgrades - costs over standard ($5,791.96 - $2,591.55) not including tub/shower overages |
| Ferguson total plumbing and lighting |
| CREDIT- Standard toilet cost $250 (3) |
| CREDIT- pendant lights $25 (2) |
| CREDIT- vanity lights $50 (4) |
| Plumbing change from single to double sink at vanity |
| Additional appliance installation cost (Ferguson) |
| Credit for earlier $200 upgrade for tub and shower color |
| Credit for earlier $100 upgrade for garden tub overage |
| Additional Deposit of $5,000 |
| ALL ITEMS LISTED ABOVE ARE DOCUMENTED ON CHANGE ORDER 5 |
| Solid door with dead bolt on safe room door (adding deadbolt) |
| Kitchen upgrade costs ($12K allowance for cabinets, tops, hardware, install) (actual cost of $19,280.92 for cabinets and install but not tops or hardware) |
| Rinnai RU180iP Sensei Super High-Efficiency Tankless Water Heater, 10 GPM (cost plus tax, venting labor) |
| Rockingham Petroleum to provide and set tank |
| Cabinet hardware |
| Expand 3x6 basement patio to 7x8 @ $15/SF |
| Flooring upgrade costs from Eagle Carpet (over standard hardwood and carpet flooring cost) |
| Credit for two standard ceiling fans |
| Additional phone line locations |
| Dimmer for under cabinet lighting |
| Drywall hung in office (taped, mudded, finished) |
| Motion Activated Exterior Garage Floodlight on southwest corner of garage (price TBD) |
| Cost for assembling and installing owner supplied fan lights (above credit for flush mount lights) in dining room, family room, owner suite, basement family room, basement office, porch) |
| Seven Solid Core Doors ($140 each) Five red dots plus basement bedroom and safe room |
| Larger master bathroom window |
| Credit for no double doors on basement office |
| Tile (supplies) from Ital |
| Master bathroom - installation of cement, membrane, shluter, thinset, grout, tile |
| Tile installation on two other bathrooms |
| Credit for standard shower enclosure |
| Credit for master bath shower allowance |
| Credit for standard tile (materials and labor) not used from Eagle Carpet |
| ALL ITEMS LISTED ABOVE ARE DOCUMENTED ON CHANGE ORDER 6 |
| Additional Deposit of $30,000 |
| Countertops for kitchens and bathrooms - buyer to pay directly to Ital |
| Iron balusters |
| Tile installation for laundry room |
| Additional handrail on stairs |
| Lowes light order |
| Electrical upgrades - Labor and materials from Harry |
| Additional cabinetry |
| Credit for difference in final bill ($3502.55) and original bill ($3505.75) for tile |
| Bathroom accessories from Shanks |
| Credit for standard bathroom accessories |
| Garbage disposal upgrade |
| Connecting gas range |
| Installation of bath accessories |
| Installation of grab bars |
| Closet shelving upgrades |
| Door hardware upgrades |
| Shower door upgrade |
| 55 construction changes at $100 per change * |
| Mantle installation |
| Gas regulator upgrade, firing up system |
| Sanding and staining the stairs to prep for and install custom stair runner (includes change order fee and credit for carpet not used) |
| Credit for fuel bill |
| Credit reduced tile bill from Ital |
| Credit for standard bathroom sinks (not used) |
| Door between family room and slab area in basement |
| Floor drain in closet in basement bathroom |
| Sliding Barn Door in Basement (drywall opening) (allowance for door) |
| 5x14 deck |
| What size is window above front door? |
| Person door on side of garage (price TBD) |
| Credit for windows at deck |
| Sliding door to deck (by allowance) |
| Light switch and fixture at deck |
| Expanded deck area to connect to porch |
| Screened door between porch and deck |
| Bay window in the master bedroom |
| Linear drain in master bathroom shower (if needed) |
| Master Bath- Allowance for standard specs (five foot soaking tub and four foot shower enclosure) |
| 5x14 Deck with light switch and sliding door(by allowance $1500) (price includes $800 credit for removing two windows) |
| Add decking north end of porch (includes screen door $260) |
| Increase decking (30 sqft) to left end of deck |
| Add 60 68 slider from kitchen dining to porch |
| Finish Slab room below up kitchen dining |
| Front Deck- Quoted three parts (credit two windows) |
| Double pocket doors centered on basement office wall (price TBD) |
| Three pane or four panel slider at family room (decision, price TBD) |
| Linen closet in basement a few inches smaller to give toilet cubicle (price TBD) |
| Master bedroom east window enlarged to be like Blade window (price TBD) |
| Fireplace centered on wall? |
| Additional 3030 DH window in basement office |
| Cost of reversing direction of basement tub/shower |
| Credit for standard water heater - buyer to buy and pay for tankless water heater |
| Gas piping to gas range |
| Builder to install bracing/backing for grab bars on all tubs and showers (buyer to select grab bars from Inner Finishes and pay for grab bars and installation) |
| Six inch flex ducts from all bathroom vents |
| Additional electrical outlet in attic for possible future radon fan |
| Three upgraded bathroom exhaust fans (Panasonic FV15VQ5) |
| Credit for three standard bathroom exhaust fans |
| Six inch flex ducts from all bathroom vents |
| Additional electrical outlet in attic for possible future radon fan |
| Three upgraded bathroom exhaust fans (Panasonic FV15VQ5) |
| Credit for three standard bathroom exhaust fans |
| Garden tub- cost over $500 allowance (cost for deckmount faucet not yet determined) |
| Kate - final price of fireplace needs to be added here |
| Solid door with dead bolt on safe room door (price TBD - already charged $150) |
| Deck Expansion (42 sqft at $35.00 per sqft) |
| Fully tiled master shower (cost over $1400 contract allowance - do not forget about credit for shower pan that was not used) |
| Electrical upgrades- Labor materials from Harry |
| Kitchen upgrade costs (cost over $12,000- which includes cabinetry cabinets and install) |
| Plumbing Upgrade Costs |
| Rinnai RU180iP Sensei Super High-Efficiency Tankless Water Heater, 10 GPM (price TBD) |
| Stone for fireplace (price TBD) |
| Credit for $3,000 fireplace allowance |
| Shanks plumbing fixture upgrades- costs over standard-(not including tub/shower overages) |
| Ferguson total plumbing and lighting |
| CREDIT- Standard toilet cost $250 (3) |
| CREDIT- pendant lights $25 (2) |
| CREDIT- vanity lights $50 (4) |
| Ferguson Appliance Installation |
| Plumbing change from single to double sink at vanity |
| Additional appliance installation cost (Ferguson) |
| Solid door with dead bolt on safe room door (price TBD - already charged $150) |
| Fully tiled master shower (cost over $1400 contract allowance - do not forget about credit for shower pan that was not used) |
| Electrical upgrades - Labor and materials from Harry - price TBD |
| Kitchen upgrade costs (cost over $12,000- which includes cabinetry cabinets and install) |
| Plumbing Upgrade Costs |
| Rinnai RU180iP Sensei Super High-Efficiency Tankless Water Heater, 10 GPM (price TBD) |
| Stone for fireplace (price TBD) |
| Additional Shanks upgrade (Roman tub extended hose) |
| Heated Master Bathroom Floor System - price TBD |
| Rockingham Petroleum to provide and set tank - price TBD |
| Fully tiled master shower (cost over $1400 contract allowance - do not forget about credit for shower pan that was not used) |
| Electrical upgrades - Labor and materials from Harry - price TBD |
| Plumbing Upgrade Costs |
| Stone for fireplace (price TBD) |
| Heated Master Bathroom Floor System - price TBD |
| Countertops for kitchens and bathrooms - price TBD |
| Iron balusters |
| Tile installation for laundry room |
| Heated Master Bathroom Floor System - price TBD |
| Shelving upgrades - pricing TBD |