CONGERS-2 - 3  ::  1260 Cottage Lane
[ BUILD: 0273 ]       [ ELEC: 95996 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
Thu    Nov 28      Ratified Contract? (0)      
Thu    Nov 28      $2500 Deposit Received (0)      
Thu    Nov 28      Association Packet Requested (0)      
Thu    Nov 28      Association Packet Received (0)      
Thu    Nov 28      Selections Meeting (0)      
Thu    Nov 28      Selections Sheet Signed (0)      
Thu    Nov 28      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Thu    Nov 28      Deposit For Upgrades Received (0)      
Thu    Nov 28      Inspection (Concrete Wall) (1)      
Fri    Nov 29      Inspection (Conduit Under Slab) (1)      
Mon    Dec 2      Inspection (Drain Tile) (0)      
Mon    Dec 2      Settlement Agent Confirmed (0)      
Mon    Dec 2      Verify Window & Roof Structure (0)      
Mon    Dec 2      Order Appliances (0)      
Mon    Dec 2      Patio (0)      
Mon    Dec 2      Rough In Microwave Vent (0)      
Mon    Dec 2      Inspection (Rough In Plumbing) (1)      
Tue    Dec 3      Inspection (Rough In Electric) (1)      
Wed    Dec 4      Inspection (Deck Piers) (0)      
Wed    Dec 4      Inspection (Framing) (1)      
Thu    Dec 5      Exterior Stone (0)      
Thu    Dec 5      Set Electric Meter (0)      
Thu    Dec 5      Inspection (Main Water Line) (0)      
Thu    Dec 5      Loan Approval (0)      
Thu    Dec 5      Deed Preparation (0)      
Thu    Dec 5      Mailbox (0)      
Thu    Dec 5      Order Plumbing / Lighting Fixtures (0)      
Thu    Dec 5      Interior Trim - Paint (1)      
Fri    Dec 6      Ceiling Fans (0)      
Fri    Dec 6      Blower Door Test (1)      
Mon    Dec 9      Inspection (Final HVAC) (1)      
Tue    Dec 10      Inspection (Final Plumbing) (1)      
Wed    Dec 11      Inspection (Final Electric) (1)      
Thu    Dec 12      Stain Hardwood Stairs (1)      
Fri    Dec 13      Schedule Closing (0)      
Fri    Dec 13      Keys to Settlement Agent (0)      
Fri    Dec 13      Review Settlement Statement (0)      
Fri    Dec 13      Jerry Signs Closing Documents (0)      
Fri    Dec 13      Request Trash Tote From POA Manager (0)      
Fri    Dec 13      Remove Coded Lockbox (0)      
--   --   Install Steps
--   --   Order four foot corner tub from Lowe's Kate has ordered
--   --   Add missing windows and doors
--   --   Tile above corner tub Need to grout
--   --   Trim around arched window
--   --   Hardwood laminate and front two bedrooms incorrect. Cane Hickory. See selection sheet. Kate will talk to buyers; Eric offering $300 credit.
--   --   Six crown in kitchen
--   --   Fix cabinet crown in kitchen Hopefully tomorrow
--   --   Select and paint front door
--   --   Is master bath backsplash seaside beige? Looks darker than floor tile
--   --   Finish grouting tile backsplash in master bathroom
--   --   Paint touch up
--   --   Tom thank you for covering granite
--   --   Half the lights don't work. Call Harry
--   --   Electrical trim out
--   --   Touch up paint
--   --   Final cleaning....touch up
--   --   Bonus room vent cover
--   --   Address white trim boards above windows on first floor
--   --   Landscape?
--   --   Replace front door Osbaldo
-- -- Building Permit (30)      
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)       Happening April 11;
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)       Waiting on dry weather
-- -- Pour Footers (1)      
-- -- Set Forms (2)       Pin footers May 24;
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)       Gravel May 26, plumbing May 27
-- -- Inspection (Plumbing Under Slab) (1)       June 1
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)       June 6
-- -- Pour Slab (1) *        June 10
-- -- Framing I (9)      
-- -- Order Steps (0)      
-- -- Order Tubs / Showers (0)      
-- -- Framing II (8)      
-- -- Framing III (8) *       
-- -- Install Stairs (0)      
-- -- Windows & Doors (0)      
-- -- House Number and Status in Window (0)      
-- -- Roofing (0)      
-- -- Order Cabinets (0)      
-- -- Deck (0)      
-- -- Gutters (0)      
-- -- Driveway (0)      
-- -- Privacy Divider / Fence (0)      
-- -- Sod / Seed / Landscaping (0)      
-- -- HVAC Rough In (4)      
-- -- Inspection (Rough In HVAC) (1)       August 8
-- -- Plumbing Rough In (4)       Install tub
-- -- Electric Rough In (4)       Starting July 27
-- -- Exterior Vinyl (0) *        K: in process
-- -- Insulation (2)      
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)       Soon
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4) *       
-- -- Drywall (Tape, Block, Skim, Sand) (6) *       
-- -- Paint 1 (1)       Start painting Aug 25
-- -- Garage Door (0)      
-- -- House Numbers (0)      
-- -- Cabinet Installation (2) *        Deliver 9/5, install 9/5
-- -- Granite Installation (1) *        9/23
-- -- Interior Trim - Install (3)       In process
-- -- Luxury Vinyl Plank (3) *        Sept 27
-- -- Luxury Vinyl Tile (0)       In progress (Marcus)
-- -- Paint 2 (3)       In process complete by 9/17
-- -- Cover Floors (1)      
-- -- Deliver Plumbing / Lighting Fixtures (0)      
-- -- Shoe Moulding (0)      
-- -- Shelving, Door Knobs, Fire Extinguisher (0)       Almost complete- pantry.
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Set Water Meter (0)      
-- -- Electric Trim Out (3)       Nearly complete
-- -- HVAC Trim Out (1)      
-- -- Plumbing Trim Out (2)      
-- -- Install Appliances (0) *        Set Friday morning
-- -- Paint 3 (2) *       
-- -- Carpet (2)       September 26
-- -- Appraiser Confirms Construction Completion (0)      
-- -- Inspection (Final Building) (2) *        Tom to call today to schedule for Tuesday
-- -- Pre Walk Through (0)       Monday 10/10 at 4:00
-- -- Cleaning (1)       Kelly this weekend
-- -- Certificate of Occupancy (1) *       
-- -- C.O. to Lender (0)      
-- -- Buyer Walk Through (1)       Monday at four
-- -- Payment for Upgrades (0)      
-- -- Closing (1)